Schlumberger Well Services QHSE Standard 05: Wellsite Operations PDF
Document Details
Uploaded by ResponsiveChocolate5587
Arkhangelsk State Technical University
2021
Schlumberger
Tags
Summary
This Schlumberger document details the wellsite operations standards and procedures for the oil and gas industry. It covers topics such as wellsite operations, QHSE standards, and well services.
Full Transcript
Well Services QHSE Standard 05: Wellsite Operations Reference: InTouch ID# 3313681 Version: 6.0 Release Date: 14-Apr-2021 EDMS UID: 0000067662 Produced: 14-Apr-2021 21:10:56 Owner: WS InTouch...
Well Services QHSE Standard 05: Wellsite Operations Reference: InTouch ID# 3313681 Version: 6.0 Release Date: 14-Apr-2021 EDMS UID: 0000067662 Produced: 14-Apr-2021 21:10:56 Owner: WS InTouch Manager Private Services,WS,WSSS,Safety,standard,5,five,location,pressur IPC,Well pumping, wellsite, r igup, rig, up , rig-up,qhse e Copyright © 2021 Schlumberger, Unpublished Work. All rights reserved. WS QHSE Standard 05 / Legal Information Legal Information Copyright © 2021 Schlumberger, Unpublished Work. All rights reserved. This work contains the confidential and proprietary trade secrets of Schlumberger and may not be copied or stored in an information retrieval system, transferred, used, distributed, translated or retransmitted in any form or by any means, electronic or mechanical, in whole or in part, without the express written permission of the copyright owner. Trademarks & Service marks WS InTouch Manager\\InTouch ID# 3313681\6.0\Release Date:14-Apr-2021\EDMS UID: 0000067662\Produced: 14-Apr-2021 21:10:56 Schlumberger, the Schlumberger logotype, and other words or symbols used to identify the products and services described herein are either trademarks, trade names or service marks of Schlumberger and its licensors, or are the property of their respective owners. These marks may not be copied, imitated or used, in whole or in part, without the express prior written permission of Schlumberger. In addition, covers, page headers, custom graphics, icons, and other design elements may be service marks, trademarks, and/or trade dress of Schlumberger, and may not be copied, imitated, or used, in whole or in part, without the express prior written permission of Schlumberger. A complete list of Schlumberger marks may be viewed at the Schlumberger Oilfield Services Marks page: http://markslist.slb.com Private Copyright © 2021 Schlumberger, Unpublished Work. All rights reserved. WS QHSE Standard 05 / Document Control Document Control Owner: WS InTouch Manager Reviewer: InTouch Approver: Armando Ballesteros, WS InTouch Manager Contact Information Name: WS InTouch Manager LDAP Alias: PPCU-TechCom Revision History WS InTouch Manager\\InTouch ID# 3313681\6.0\Release Date:14-Apr-2021\EDMS UID: 0000067662\Produced: 14-Apr-2021 21:10:56 Version Date Description Prepared by 6.0 14-Apr-2021 Major update including incorporation of G06 Author: Armando Ballesteros, High-Pressure Area guideline. Per ticket TechCom: Blanca Vijil 7642412, added Monoflex as an approved piping and standard connection in section 5.11.9.3. Per ticket 7633787 and QUEST 20201117170622, in section 5.11.7.2, added requirement for 4-in dual purpose hose for Proces Trailer HVFR operations in SSO rig-up with example figures. 6.0 14-Apr-2021 Major update including incorporation of G06 Author: Armando Ballesteros, High-Pressure Area guideline. Per ticket TechCom: Blanca Vijil 7642412, added Monoflex as an approved piping and standard connection in section 5.11.9.3. Per ticket 7633787 and QUEST 20201117170622, in section 5.10.3, added requirement for 4-in dual purpose hose for Proces Trailer HVFR operations in SSO rig-up with example figures. 5.3 17-Jul-2020 Per ticket 7515036, updated Table 5-6 rows Author: Wendell Hendy, Walter to include remote flanged gate valves and Taylor, Kevin Odom, Rafael Pozo, added note referring to InTouch ID 4326465 for Jared Stephens, Brian Maskrey, ordering information on flanged plug valves for Roberto Montes Merla; Technical CT Services only; in section 5.12.1,removed Communications: Blanca Vijil “after ensuring that they function correctly” from 9th bullet point regarding overpressure shutdown setting to 1,000 psi (6,900 kPa). Per ticket 7524202, in section 5.9.3.2 added statement regarding unit fluid end pressure rating to be compared against treating line pressure rating, and that burst disc will be rated in accordance to the lower design pressure of the two; for table 5-3, changed heading to reflect “Treating Equipment / Fluid End Rating” and changed existing statement to a note. Per ticket 7524225, in table 5-5 added Cameron as approved supplier for swivels joints, Weco wing nuts and segments, and for standard 1-in to 4-in treating iron and adapters. Per ticket 7523084, in section 5.11.1.1 table 5-5, added reference to NSR requirement for using non-approved suppliers in footnote. Per ticket 7539952, updated text in section 5.11.61 concerning anti-vibration chokes. Private Copyright © 2021 Schlumberger, Unpublished Work. All rights reserved. WS QHSE Standard 05 / Document Control Version Date Description Prepared by 5.2 09-Apr-2020 Updated Table 5-5 to include coiled-tubing HP Author: Manoj Agnani, Alex treating equipment connectors, reel swivels Albuquerque, Daniel MacAulay, and stub shaft; also updated description Kevin Odom for relief valves, and added Cameron as approved supplier for 2-in adjustable choke. Created Appendix C for approved downhole tool supplier and approved casing hardware supplier tables. In section 5.10.3, added two 8-in hose requirement for GelPOD suction rig-up. In Table 5.9 for API 5CT reference added “and tubing” since standard applies to both casing and tubing. 5.15 07-Dec-2019 Updated to include OneStim feedback (IT Author: C. Chaghouri, F. #7231013). Updated Table 5-6 Approved Pennell; TechCom: B. Vijil Cement Heads and Cement Head Accessories WS InTouch Manager\\InTouch ID# 3313681\6.0\Release Date:14-Apr-2021\EDMS UID: 0000067662\Produced: 14-Apr-2021 21:10:56 to specify that CMIB CUH 324 is approved and added a footnote that says use of any other CMIB requires an exemption (IT #7258396). Added Cameron wellhead isolation tool to Table 5-4 (IT #7329092). Added sentence regarding PSD responsibility to section 5.7.9 Handling of radiaoctive equipment (IT #7332388). 5.14 13-Aug-2018 Added information regarding customer surface Author: Jeff Beckel; TechCom: pressure lines assessment in the General Blanca Vijil Rules section. Clarify parts made by Wood Machine in table 5-4 Approved Piping and Wellhead Connections. 5.13 07-Feb-2018 Continued updates for the new way to work Author: Jeff Beckel; TechCom: (NWW) and to the external discharge burst Shobhasri Raghavan disc assembly. 5.12 14-Nov-2017 Updated stencil color, PRV setting, and rental Author: Jeff Beckel; TechCom: iron. Shobhasri Raghavan 5.11 26-Oct-2017 Updated to clarify the Burst disc valves and Author: Jeff Beckel; TechCom: burst disc adapters section. Shobhasri Raghavan 5.10 05-Oct-2017 Updated new rules for hoses for the SBF-677. Author: Jeff Beckel; TechCom: Shobhasri Raghavan 5.9 22-Sep-2017 Updated to align with the new way to work Author: Jeff Beckel; TechCom: (NWW). Changed segment to Product Line Shobhasri Raghavan and sub segment to sub-Product Line. 5.8 21-Aug-2017 Updated the shutdown instructions. Author: Jeff Beckel; TechCom: Shobhasri Raghavan 5.7 14-Aug-2017 Updates on pressure-relief valves, relief Author: Jeff Beckel; TechCom: valve installation requirements, relief valves Shobhasri Raghavan on cementing units, onshore main bleed-off assembly and added images for the permitted flow direction in bleed line tees. 5.6 01-Aug-2017 Updates on hoses made as per Treating Author: Jeff Beckel; TechCom: Equipment Manual, all changes made to Shobhasri Raghavan section 5.10 Suction, discharge and chemical hoses. 5.5 21-Jul-2017 Updated to clarify what to do when a Author: Jeff Beckel; TechCom: non-standard missile is rigged up. Shobhasri Raghavan Private Copyright © 2021 Schlumberger, Unpublished Work. All rights reserved. WS QHSE Standard 05 / Document Control Version Date Description Prepared by 5.4 14-Jun-2017 1. Updates to the approved supplier tables. Author: Jeff Beckel; TechCom: 2. Updates on the isolation bleed line and Shobhasri Raghavan main bleed line. 3. Wellhead isolation tool (Treesaver) supplier added to Table 5-4. 5.3 18-May-2017 1. Removed section 5.7.11.2 Burst disc valves, Author: Jeff Beckel; TechCom: and replaced it with Section 5.9.3. with detailed Shobhasri Raghavan information on Burst disc valves and external burst disc adapters. 2. Updated all instances of InTouch Content ID# with InTouch ID#. 5.2 09-May-2017 Removed the Technique Manager role from Author: Jeff Beckel; TechCom: this Standard. Shobhasri Raghavan 5.12 08-Mar-2017 Section 5.7, changed the content for removing Author: Jeff Beckel, TechCom: a pump. Table 5-20, removed the row on Shobhasri Raghavan Isolating a Pump. New Table 5-21, titled WS InTouch Manager\\InTouch ID# 3313681\6.0\Release Date:14-Apr-2021\EDMS UID: 0000067662\Produced: 14-Apr-2021 21:10:56 "Applicable Standard Work" added. 5.11 11-Jan-2017 Allow Black Eagle hoses for HCl