Well Services QHSE Standard 05 Operations
21 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is indicated as a newly approved tool in the updated document?

  • Approved Downhole Tool
  • Cement Head Accessories
  • Cameron Wellhead Isolation Tool (correct)
  • POD Suction Rig
  • What requirement was added for the GelPOD suction rig-up?

  • Two 8-in hoses (correct)
  • One 6-in hose
  • Three 10-in hoses
  • Two 10-in valves
  • What does the updated Table 5-9 emphasize regarding API 5CT?

  • It applies only to tubing.
  • It applies only to casing.
  • It applies to casing and tubing. (correct)
  • It is outdated and should not be used.
  • Which component requires an exemption for use according to the updates?

    <p>Any CMIB CUH other than 324</p> Signup and view all the answers

    Which feedback was incorporated into the most recent updates?

    <p>OneStim feedback</p> Signup and view all the answers

    What is the primary focus of the updates made in section 5.15?

    <p>Updating approved suppliers</p> Signup and view all the answers

    What does the footnote regarding CMIB CUH 324 indicate?

    <p>It is the only approved CUH.</p> Signup and view all the answers

    When was the release date for the updates mentioned?

    <p>14-Apr-2021</p> Signup and view all the answers

    What is the purpose of pressure-relief valves as updated in the document?

    <p>To allow safe venting of excess pressure</p> Signup and view all the answers

    What does the update on hoses relate to in section 5.10?

    <p>Suction, discharge, and chemical hoses requirements</p> Signup and view all the answers

    When rigging up a non-standard missile, what is the recommended action?

    <p>Consult the updated guidelines for specific measures</p> Signup and view all the answers

    What aspect of bleed-off assemblies was updated in the document?

    <p>Permitted flow direction in bleed line tees</p> Signup and view all the answers

    What type of updates were made to wellhead isolation tools?

    <p>Clarification of installation requirements</p> Signup and view all the answers

    What do the updates primarily focus on regarding wellsite operations?

    <p>Safety protocols and equipment specifications</p> Signup and view all the answers

    What is the significance of the updates on cementing units?

    <p>Ensuring safety during application</p> Signup and view all the answers

    How do the updates on installation requirements contribute to wellsite practices?

    <p>By promoting uniform practices across sites</p> Signup and view all the answers

    Which of the following is a key focus area of the Well Services QHSE Standard?

    <p>Wellhead Isolation Tools</p> Signup and view all the answers

    What is the significance of Piping and Wellhead Connections in wellsite operations?

    <p>They are critical for maintaining pressure and integrity of well functions.</p> Signup and view all the answers

    Which of the following statements best describes 'New Ways to Work' in wellsite operations?

    <p>Using innovative techniques to enhance operational efficiency.</p> Signup and view all the answers

    What best describes the primary purpose of the Well Services QHSE Standard?

    <p>To outline safety and quality requirements for wellsite operations.</p> Signup and view all the answers

    Which document characteristic is emphasized in the copyright notice of the Well Services QHSE Standard?

    <p>Confidentiality and proprietary nature</p> Signup and view all the answers

    Study Notes

    Well Services QHSE Standard 05: Wellsite Operations

    • InTouch ID: 3313681
    • Version: 6.0
    • Release Date: 14-Apr-2021
    • EDMS UID: 0000067662
    • Produced: 14-Apr-2021 21:10:56
    • Owner: WS InTouch Manager

    Revision History

    • Version 6.0 (14-Apr-2021):
      • Created Appendix C for approved downhole tool suppliers and approved casing hardware suppliers.
      • Added two 8-in hose requirements for GelPOD suction rig-up in section 5.10.3.
      • Updated Table 5.9 for API 5CT reference to include “and tubing” as the standard applies to both casing and tubing.
    • Version 5.15 (07-Dec-2019):
      • Included OneStim feedback
      • Updated Table 5-6 Approved Cement Heads and Cement Head Accessories to specify that CMIB CUH 324 is approved.
      • Added a footnote to Table 5-6 stating that use of any other CMIB requires an exemption.
      • Added Cameron wellhead isolation tool to Table 5-4.
    • Version 5.7 (14-Aug-2017):
      • Updated information on pressure-relief valves, relief valve installation requirements, relief valves on cementing units, and onshore main bleed-off assembly.
      • Added images for the permitted flow direction in bleed line tees.
    • Version 5.6 (01-Aug-2017):
      • Updated information on hoses as per Treating Equipment Manual.
      • Made changes to section 5.10 Suction, discharge and chemical hoses.
    • Version 5.5 (21-Jul-2017):
      • Clarified procedures when a non-standard missile is rigged up.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    This quiz focuses on the Well Services QHSE Standard 05, specifically its latest version and revision history. Engage with key operational standards and changes made in wellsite operations to ensure quality, health, safety, and environmental adherence. Test your knowledge on updates, approved suppliers, and tools essential for wellsite procedures.

    Use Quizgecko on...
    Browser
    Browser