Well Services QHSE Standard 05 Operations

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is indicated as a newly approved tool in the updated document?

  • Approved Downhole Tool
  • Cement Head Accessories
  • Cameron Wellhead Isolation Tool (correct)
  • POD Suction Rig

What requirement was added for the GelPOD suction rig-up?

  • Two 8-in hoses (correct)
  • One 6-in hose
  • Three 10-in hoses
  • Two 10-in valves

What does the updated Table 5-9 emphasize regarding API 5CT?

  • It applies only to tubing.
  • It applies only to casing.
  • It applies to casing and tubing. (correct)
  • It is outdated and should not be used.

Which component requires an exemption for use according to the updates?

<p>Any CMIB CUH other than 324 (A)</p> Signup and view all the answers

Which feedback was incorporated into the most recent updates?

<p>OneStim feedback (A)</p> Signup and view all the answers

What is the primary focus of the updates made in section 5.15?

<p>Updating approved suppliers (B)</p> Signup and view all the answers

What does the footnote regarding CMIB CUH 324 indicate?

<p>It is the only approved CUH. (C)</p> Signup and view all the answers

When was the release date for the updates mentioned?

<p>14-Apr-2021 (C)</p> Signup and view all the answers

What is the purpose of pressure-relief valves as updated in the document?

<p>To allow safe venting of excess pressure (A)</p> Signup and view all the answers

What does the update on hoses relate to in section 5.10?

<p>Suction, discharge, and chemical hoses requirements (C)</p> Signup and view all the answers

When rigging up a non-standard missile, what is the recommended action?

<p>Consult the updated guidelines for specific measures (A)</p> Signup and view all the answers

What aspect of bleed-off assemblies was updated in the document?

<p>Permitted flow direction in bleed line tees (C)</p> Signup and view all the answers

What type of updates were made to wellhead isolation tools?

<p>Clarification of installation requirements (C)</p> Signup and view all the answers

What do the updates primarily focus on regarding wellsite operations?

<p>Safety protocols and equipment specifications (B)</p> Signup and view all the answers

What is the significance of the updates on cementing units?

<p>Ensuring safety during application (C)</p> Signup and view all the answers

How do the updates on installation requirements contribute to wellsite practices?

<p>By promoting uniform practices across sites (D)</p> Signup and view all the answers

Which of the following is a key focus area of the Well Services QHSE Standard?

<p>Wellhead Isolation Tools (C)</p> Signup and view all the answers

What is the significance of Piping and Wellhead Connections in wellsite operations?

<p>They are critical for maintaining pressure and integrity of well functions. (B)</p> Signup and view all the answers

Which of the following statements best describes 'New Ways to Work' in wellsite operations?

<p>Using innovative techniques to enhance operational efficiency. (A)</p> Signup and view all the answers

What best describes the primary purpose of the Well Services QHSE Standard?

<p>To outline safety and quality requirements for wellsite operations. (D)</p> Signup and view all the answers

Which document characteristic is emphasized in the copyright notice of the Well Services QHSE Standard?

<p>Confidentiality and proprietary nature (C)</p> Signup and view all the answers

Flashcards are hidden until you start studying

Study Notes

Well Services QHSE Standard 05: Wellsite Operations

  • InTouch ID: 3313681
  • Version: 6.0
  • Release Date: 14-Apr-2021
  • EDMS UID: 0000067662
  • Produced: 14-Apr-2021 21:10:56
  • Owner: WS InTouch Manager

Revision History

  • Version 6.0 (14-Apr-2021):
    • Created Appendix C for approved downhole tool suppliers and approved casing hardware suppliers.
    • Added two 8-in hose requirements for GelPOD suction rig-up in section 5.10.3.
    • Updated Table 5.9 for API 5CT reference to include “and tubing” as the standard applies to both casing and tubing.
  • Version 5.15 (07-Dec-2019):
    • Included OneStim feedback
    • Updated Table 5-6 Approved Cement Heads and Cement Head Accessories to specify that CMIB CUH 324 is approved.
    • Added a footnote to Table 5-6 stating that use of any other CMIB requires an exemption.
    • Added Cameron wellhead isolation tool to Table 5-4.
  • Version 5.7 (14-Aug-2017):
    • Updated information on pressure-relief valves, relief valve installation requirements, relief valves on cementing units, and onshore main bleed-off assembly.
    • Added images for the permitted flow direction in bleed line tees.
  • Version 5.6 (01-Aug-2017):
    • Updated information on hoses as per Treating Equipment Manual.
    • Made changes to section 5.10 Suction, discharge and chemical hoses.
  • Version 5.5 (21-Jul-2017):
    • Clarified procedures when a non-standard missile is rigged up.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team
Use Quizgecko on...
Browser
Browser