Tata Steel Logistics Webinar Overview
23 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the minimum weight threshold for weighment in the dispatch process?

  • 50 kg
  • 75 kg
  • 150 kg
  • 100 kg (correct)
  • Which products require weighment according to the guidelines?

  • HR Plate/Sheet, only
  • CTH products
  • CRCA products
  • Non CRCA, CTL & HR Slit (correct)
  • What is the first step in the HR dispatch process after TAT starts?

  • Loading (correct)
  • Invoice generation
  • Weighment
  • PDIR Check
  • In slab dispatch, what happens after the PDIR check confirms a 'Yes'?

    <p>Initiation of weighment</p> Signup and view all the answers

    What type of products do not require weighment?

    <p>CRCA products</p> Signup and view all the answers

    Which activity occurs last in the HR dispatch process?

    <p>Final Vehicle Departure</p> Signup and view all the answers

    In the context of slab dispatch, when will the weighment occur?

    <p>After loading and lashing</p> Signup and view all the answers

    What is a prerequisite for vehicle departure from parking?

    <p>PDIR check and departure confirmation</p> Signup and view all the answers

    What does CRCA stand for in the context of product forms?

    <p>Cold Rolled Close Annealed</p> Signup and view all the answers

    What is the storage capacity of Yard 10?

    <p>5kT</p> Signup and view all the answers

    What is the primary reason for traceability issues in cold rolled (CR) products?

    <p>Intrashifting by the production team</p> Signup and view all the answers

    What happens if the re-weighment of CR products shows a difference greater than 100 kg?

    <p>The product is returned to the production team.</p> Signup and view all the answers

    How many loading points are available in the SMS-1 CR Yard?

    <p>9</p> Signup and view all the answers

    Which product form is not associated with the 743 plant code?

    <p>HRPO</p> Signup and view all the answers

    What is the main utilization of the overhead (O.H) cranes in the sheds?

    <p>Loading, unloading, shifting, and packing activities</p> Signup and view all the answers

    What is the rail coefficient for the TSM plant?

    <p>72%</p> Signup and view all the answers

    Which product has the lowest monthly capacity at the TSM plant?

    <p>Slab</p> Signup and view all the answers

    What is the acceptable Vehicle Turn Around Time (TAT) for dispatch activities?

    <p>110 vehicles</p> Signup and view all the answers

    What activity occurs immediately after the TAT starts in the Process Flow Path in CR Dispatch?

    <p>Weighment in SAP</p> Signup and view all the answers

    Which product has a monthly capacity of 350 kT?

    <p>H.R Coil</p> Signup and view all the answers

    What happens if the weighment at the mill is less than 100?

    <p>Tarpaul is used</p> Signup and view all the answers

    Which logistics activity follows CRM in the dispatch process?

    <p>Loading</p> Signup and view all the answers

    How many vehicles are available for dispatch activities at the CRM Logistics Park?

    <p>60 vehicles</p> Signup and view all the answers

    Study Notes

    Tata Steel Logistics Webinar

    • Webinar focused on unitization, transport park, loading, and lashing
    • TSM (Meramandali) plant overview:
      • Steel making capacity: 4.8 MTPA
      • Rail coefficient: 72%
      • Product mix includes HR coil, hot rolled plate, CRCA sheet, G.P coil, galume coil, cold rolled, corrugated sheet, and color coated coil
      • Acceptable vehicle turn-around time (TAT): ≤9 hours (target for future: ≤5 hours)
      • Outbound logistics (OBL) for TSM: 440 KT/month
      • Product mix includes HR (350 kT), CR (50 kT), Slab (40 kT). Rail/Road specifics for each product given: 310kT, 40kT, 39kT, 1kT, 5kT, 35kT, respectively.

    Finished Goods

    • Various steel products are produced, including HR/HRPO coil, CRCA coiled (cold rolled, closed annealed), galume coil, galvanized coils/sheets, color coated coils, HR chequered plates, and color coated profiled sheets.

    Packing Materials

    • VCI paper: Vapor Corrosion Inhibitor paper that protects metals from corrosion
    • LDPE: Low-density polyethylene - a soft, flexible, lightweight plastic
    • HDPE: High-density polyethylene - a type of polyethylene plastic used in various products
    • GI/GL/CCL sheet, wood

    Production Capacity

    • Cold Rolled Steel Products: 6,00,000 TPA
    • Galvanized Steel Products: 3,18,000 TPA
    • Color coated Products: 1,20,000 TPA
    • CRCA Product: 2,40,000 TPA

    TSM-FG Loading/Lashing Activities

    • Activities related to loading and lashing finished goods at TSM-FG

    Process Flow Path

    • STO/DO issuance to transporters
    • Vehicle tracking system for STO/DO visibility, transport park in/exit, and change in plan
    • STARS: Shipment Tracking & Raw Materials System
    • VTS: Vehicle Tracking System
    • SWH: Smart Warehouse
    • STO: Stock Transfer Orders
    • DO: Delivery Orders
    • PDIR: Pre-Despatch Inspection Report

    VTS Interface

    • Reports available: VIVO report, Shift Wise report, Transport Park report, Vehicle Search, Indent report, STO/DO balance report, Daily inspection report, Digital LR report for L/C customers, and Vivo report for other category vehicles.

    Transport Park-TSM Amenities

    • Driver rest room
    • Canteen facilities
    • Driver health check-up
    • Drinking water
    • Toilets & washrooms
    • Separate pedestrian areas
    • 24x7 CCTV surveillance

    Parking Area

    • 6.8 acres area
    • Involves agencies like OBL, IBM, and stores
    • Vehicle parking purpose, vehicle physical fitness, CLM gate pass issuance, document verification, driver’s health checking

    Process Flow Path of Transport Park-TSM

    • Step-by-step procedures for vehicle entry, safety checks, parking, and exit at the transport park

    Checklist of Transport Park-TSM

    • List of various checks for vehicles, including seat belts, mirrors, PPEs, lights, and other safety equipment

    Guidelines for Movement HMV Vehicles at Loading Points

    • Required PPEs for personnel
    • Fill Checklist as per SOP
    • Lifting tool certificates, Designated parking areas, safety measures like scotch blocks and rigger distance.

    Key Points: Coil Lashing

    • Lashing procedures for coils based on weight (≤10 MT or >10 MT)
    • Protect coils using rubber pads

    Key Points: Vehicle Placement at Loading Area

    • Driver placement guidelines
    • Ensuring clear pathway for vehicles

    Key Points: Pre-Checking Loading and Lashing Operation

    • Insert rubber protector between lashing chains

    Key Points: Storage of Hot Rolled & Cold Rolled Coils

    • Overlapping coils for storage (≥70%)
    • No person under suspended load

    Handling vehicles from Transport Park-TSM

    • Statistics on vehicle entry, exit, inspection, driver training, kiosk training, and gate passes

    Buffer Management inside Plant

    • Plant codes and descriptions (e.g., Angul Cold Rolling Mill, Angul Color Coating Plant) that are located within the factory

    Process Flow Path of Vehicles

    • Flowchart of vehicle movement from transport park to various departments

    Process Flow Path in CR Dispatch

    • Weighment (≥100 kg), PDIR check, and invoice generation

    Process Flow Path in HR Dispatch

    • Process of loading, lashing, Weighment (≥100 kg), PDIR check, invoicing for HR coils.

    Process Flow Path in Slab Dispatch

    • Weighment to customers, PDIR check, and invoicing

    No Movement Timing

    • Change in no-movement time for heavy vehicles

    Gate 2 Entry Process

    • Procedures for vehicle entry at gate 2

    Vehicle Placement & Loading Activities

    • Images of vehicle placement and loading activities

    Lashing Activities

    • Images of lashing activities

    Tarpaulin Activities

    • Images of tarpaulin activities

    PDIR & Departure from Parking

    • Images of PDIR and departure from parking

    Layout of Loading Points

    • Schematic diagram of the layout of loading points

    Full Form of Products

    • List of steel products (CRCA, GP sheet, GL sheet, PPGL, GC sheet, HRPO)

    Plant Codes

    • Codes and descriptions of different production lines

    Infrastructure CRM Shed-10

    • CRM Yard 10 storage capacity, loading points, dispatch, crane utilization
    • Issue of traceability in CR products

    Infrastructure Constraints SMS-1 CR Yard

    • Storage capacity, loading points, crane availability

    Infrastructure Constraints HSM Yard

    • Storage capacity, crane utilization, road loading, lashing points, dispatch

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Explore the key aspects of Tata Steel's logistics operations in this informative webinar. Learn about unitization, transport parks, loading procedures, and the comprehensive product mix from the TSM plant. The session emphasizes outbound logistics and efficiency in vehicle turnaround times, providing essential insights into the steel industry.