Test Your Knowledge of LNG Offload Abnormal Condition Procedures with This Infor...

ImpeccableCarnelian4634 avatar
ImpeccableCarnelian4634
·
·
Download

Start Quiz

Study Flashcards

9 Questions

What number should you call in case of an emergency or abnormal condition during LNG offload?

(907) 452-7111

What is a high-pressure load in the context of LNG offload?

When the pressure in the storage tanks rises above normal conditions

What should personnel monitor during LNG offload to prevent overpressure and filling?

Flow rates, liquid levels, and tank pressures

At what pressure should the transfer be stopped if the pressure in the tank being filled exceeds it?

70 psi

What should be done if the LNG load is suspected or found 'hot'?

Close LNG production out and observe the associated pressures

What should be done if distribution pressure begins to drop more than one psi during LNG offload?

Throttle the LNG production valve of the tank being filled

What should be done to allow the distribution system to absorb extra boiloff gas during LNG offload?

Verify the bypass valve is open

What should be done if tank pressure cannot be maintained during LNG offload?

Cease offload immediately

What is the purpose of abnormal condition procedures for LNG offload?

To prevent accidents and emergencies

Study Notes

Abnormal Condition Procedures for LNG Offload

  • In case of emergency or abnormal conditions during LNG offload, call 452-7111.
  • High-pressure load occurs when the pressure in the storage tanks rises above normal conditions due to warm LNG transfer or operator error.
  • Personnel must monitor flow rates, liquid levels, and tank pressures during LNG offload to prevent overpressure and filling.
  • Stop transfer if the pressure in the tank being filled exceeds 70 psi.
  • If the LNG load is suspected or found "hot," close LNG production out and observe the associated pressures.
  • Throttle the LNG production valve of the tank being filled if distribution pressure begins to drop more than one psi.
  • Verify the bypass valve is open to bypass the boiloff gas backpressure regulator to allow the distribution system to absorb extra boiloff gas.
  • Bypass the meter run by opening valves on the 4" bypass line if necessary.
  • Cease offload immediately if tank pressure cannot be maintained.
  • New operators must receive initial training and be trained on assigned tasks before performing tasks unassisted.
  • Qualification will be provided by several different methods, including on-the-job training, SOP review, performance evaluation, oral and written exams.
  • All operators will be reevaluated periodically, and IGU must maintain all training records for all employees for their entire employment plus one year.

Test your knowledge of Abnormal Condition Procedures for LNG Offload with this quiz! From monitoring tank pressures to handling emergencies, this quiz will cover all the essential procedures that must be followed during LNG offload. Improve your understanding of the subject and ensure safety on the job by taking this informative quiz today!

Make Your Own Quizzes and Flashcards

Convert your notes into interactive study material.

Get started for free