RDC Inbound Freight Consolidation Program Overview
12 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the main purpose of the RDC Inbound Freight Consolidation (IFC) program?

  • To reduce lead time variability (correct)
  • To generate more deliveries to The Home Depot stores
  • To decrease the overall cube for each RDC
  • To increase LTL shipments
  • What is the Manual Floor Load (MFL) program primarily responsible for?

  • Loading palletized product along with loose cartons (correct)
  • Staffing the IFC area
  • Managing empty space in trailers
  • Increasing non-cube bearing content
  • How does the MFL loading process impact the overall cube for each RDC?

  • It decreases the overall cube (correct)
  • It increases the overall cube
  • It has no impact on the cube
  • It only includes cube-bearing content
  • What are the responsibilities of the IFC Leaders in relation to loads?

    <p>Own the overall integrity and quality of the loads</p> Signup and view all the answers

    If an RDC (SB IFC) exceeds 3000 cube per load, what additional benefit is expected?

    <p>Additional cube saving additional shipments over the long term</p> Signup and view all the answers

    Who is responsible for ensuring that IFC receiving processes are being followed?

    <p>OM (Operations Manager)</p> Signup and view all the answers

    Who is responsible for managing cube and weight levels on all MFL trailers?

    <p>Unloader</p> Signup and view all the answers

    What is the responsibility of a Wall Builder in the IFC facility?

    <p>Communicating with the Loader about Non-Conveyable pallets</p> Signup and view all the answers

    When is the WIP data pulled and emailed to the IFCs?

    <p>10:00AM, Monday through Friday</p> Signup and view all the answers

    What responsibility does a Loader have when there is no work available for loading?

    <p>Assist with Wall Building</p> Signup and view all the answers

    Which report is used to manage pallet age in the IFC facility?

    <p>Aged oLPNs IFC report</p> Signup and view all the answers

    Who ensures that IFC facilities have specific resources and space?

    <p>SSC Logistics Manager</p> Signup and view all the answers

    More Like This

    Supply Chain Processes Quiz
    4 questions

    Supply Chain Processes Quiz

    WellReceivedSquirrel7948 avatar
    WellReceivedSquirrel7948
    Supply Chain Management Basics
    22 questions
    Supply Chain Management Grundlagen
    45 questions
    Use Quizgecko on...
    Browser
    Browser