Supply Chain Management Basics
22 Questions
101 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What are the three parts to a Requisition Number (RQN)?

  • Federal Supply Class
  • Country Code
  • Unique ID
  • All of the above (correct)
  • What are the two types of Requisition Numbers (RQNs)?

  • Anticipated Non-Operational Ready Supply (ANORS) (correct)
  • Operational Ready Supply (ORS)
  • Non-Operational Ready Supply (NORS) (correct)
  • Expedited Non-Operational Ready Supply (ENORS)
  • What is an Allowance Parts List (APL)?

    A technical document prepared for a specific item or component of equipment.

    What does the Allowance Equipment List (AEL) consist of?

    <p>A list of parts and supplies needed to operate the ship.</p> Signup and view all the answers

    What does OPTAR stand for?

    <p>Operational Target.</p> Signup and view all the answers

    What is the Temporary Additional Duty Travel Target (TADTAR)?

    <p>Funding used for travel and non-Navy conferences or schools.</p> Signup and view all the answers

    What is the purpose of OPNAV 4790/CK?

    <p>It is used for configuration changes.</p> Signup and view all the answers

    What is an OPNAV 4790/2K ('Two-kilo')?

    <p>Automated Work Request (AWR).</p> Signup and view all the answers

    What is a Casualty Report (CASREP)?

    <p>Messages generated to report deficiencies in war-fighting capability.</p> Signup and view all the answers

    What are the categories of CASREPs?

    <p>CAT2, CAT3, CAT4</p> Signup and view all the answers

    How many types of CASREP messages are there?

    <p>Four types.</p> Signup and view all the answers

    What is the purpose of the Fleet Freight/Cargo Routing Message?

    <p>To get repair parts to the right places depending on the ship's schedule.</p> Signup and view all the answers

    What does a Material Safety Data Sheet (MSDS) provide?

    <p>Information on a chemical used onboard.</p> Signup and view all the answers

    What is the role of a Repair Parts Petty Officer (RPPO)?

    <p>Division logistics representative.</p> Signup and view all the answers

    What does Material Obligation Validation (MOV) ensure?

    <p>To determine if requirements for material still exist.</p> Signup and view all the answers

    What are the two limits for the Government Travel Charge Card Program (GTCC)?

    <p>Standard and Restricted</p> Signup and view all the answers

    What is a Remain in Place Chit (RIP Chit)?

    <p>An exception to exchanges of carcass due to engineering needs.</p> Signup and view all the answers

    What is the purpose of the Other Supply Office (OSO)?

    <p>To document critical item exchanges between ships.</p> Signup and view all the answers

    What does Depot Level Repair (DLR) entail?

    <p>Bringing damaged parts to supply for repair and re-entrance into the system.</p> Signup and view all the answers

    What is a Maintenance Assist Module (MAM)?

    <p>Equipment used by technicians for troubleshooting.</p> Signup and view all the answers

    What is the Fleet Inventory Management Analysis Reporting System (FIMARS)?

    <p>A system used to check parts availability among fleet ships.</p> Signup and view all the answers

    What is the Fleet Logistics Information System (FLIS)?

    <p>A system for managing fleet logistics.</p> Signup and view all the answers

    Study Notes

    Requisition Numbers (RQN)

    • RQN includes three essential components: Federal Supply Class, Country Code, and Unique ID.
    • Two types of RQNs:
      • Non-Operational Ready Supply (NORS) requires a CASREP report.
      • Anticipated Non-Operational Ready Supply (ANORS) does not require a CASREP.

    Allowance Parts List (APL)

    • APL is a technical document listing components for specific equipment.
    • Found in Coordinated Shipboard Allowance List (COSAL) or Operational Maintenance Management System (OMMS).
    • Parts are ordered against the APL by maintenance personnel.

    Allowance Equipment List (AEL)

    • AEL comprises parts and supplies necessary for the ship's operation.

    Operational Target (OPTAR) and Temporary Additional Duty Travel Target (TADTAR)

    • OPTAR allocates funds for consumable products and emergency repairs.
    • TADTAR funds travel for training, emergencies, or non-Navy conferences.

    OPNAV Forms

    • OPNAV 4790/CK documents configuration changes.
    • OPNAV 4790/2K ("Two-kilo") is an Automated Work Request (AWR) for requesting external assistance or parts.

    Casualty Report (CASREP)

    • CASREPs are official messages detailing deficiencies that impact mission capabilities.
    • Categorized into three types based on mission impact:
      • CAT2 (secondary mission degradation)
      • CAT3 (primary mission degradation)
      • CAT4 (primary mission loss).
    • Four message types exist: INITIAL, UPDATE, CANCELLATION, and FINAL.

    Fleet Freight/Cargo Routing Message

    • Ensures timely delivery of repair parts based on the ship's schedule.

    Material Safety Data Sheet (MSDS)

    • Provides essential information about chemicals used on board.

    Repair Parts Petty Officer (RPPO)

    • Acts as the division’s logistics representative.

    Material Obligation Validation (MOV)

    • Monthly reports assess the necessity and existence of material requirements.

    Government Travel Charge Card Program (GTCC)

    • Standard card limit is $7500 monthly, restricted limit is $4000 with lower cash advance caps.

    Remain in Place Chit (RIP Chit)

    • Allows retention of defective parts until replacements arrive, facilitating engineering processes.

    Other Supply Office (OSO)

    • Facilitates critical item exchanges between ships, with proper documentation required.

    Depot Level Repair (DLR)

    • Damaged parts are turned in for repair and refurbishment before re-entering the supply system.

    Maintenance Assist Module (MAM)

    • Equipment used by technicians to troubleshoot faults, only used with CO's approval.

    Fleet Inventory Management Analysis Reporting System (FIMARS)

    • Tool for checking parts availability across the fleet.

    Fleet Logistics Information System (FLIS)

    • System for managing and tracking logistics across the fleet.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Explore the essentials of requisition numbers (RQN) and their components in the supply chain. Learn about the different types of RQNs and the concept of the Allowance Parts List (APL). This quiz will enhance your understanding of supply management terminology and practices.

    More Like This

    Use Quizgecko on...
    Browser
    Browser