What is the minimum percentage of spare conductors required in each main cable when planning cabling?
What is the minimum percentage of spare conductors required in each main cable when planning cabling?
Where should spare conductors be located within the cable?
Where should spare conductors be located within the cable?
What should be done after determining the cables' size and number of conductors?
What should be done after determining the cables' size and number of conductors?
Which department's approval is necessary for the cable route plan?
Which department's approval is necessary for the cable route plan?
Signup and view all the answers
What is the minimum number of conductors used for no spare conductors to be required?
What is the minimum number of conductors used for no spare conductors to be required?
Signup and view all the answers
Why should circuits be distributed when multiple cables are laid along a route?
Why should circuits be distributed when multiple cables are laid along a route?
Signup and view all the answers
What should a cable route plan include?
What should a cable route plan include?
Signup and view all the answers
Which of the following is NOT a factor to consider when laying cables?
Which of the following is NOT a factor to consider when laying cables?
Signup and view all the answers
What is the minimum width that a cable trench should be maintained at?
What is the minimum width that a cable trench should be maintained at?
Signup and view all the answers
What material should the cable be laid on in rocky ground according to the guidelines?
What material should the cable be laid on in rocky ground according to the guidelines?
Signup and view all the answers
Who is responsible for supervising the use of mechanized equipment during cable laying?
Who is responsible for supervising the use of mechanized equipment during cable laying?
Signup and view all the answers
What should be done if a cable drum is found to be in damaged condition?
What should be done if a cable drum is found to be in damaged condition?
Signup and view all the answers
What type of surface should be cleared from the bottom of a trench to ensure proper cable laying?
What type of surface should be cleared from the bottom of a trench to ensure proper cable laying?
Signup and view all the answers
How should the cable be paid out according to the guidelines?
How should the cable be paid out according to the guidelines?
Signup and view all the answers
What is a necessary step before laying cable in a trench?
What is a necessary step before laying cable in a trench?
Signup and view all the answers
What should be used to cover the cable after it is laid in the trench?
What should be used to cover the cable after it is laid in the trench?
Signup and view all the answers
Which method may be used for laying Quad and OFC cables when site conditions are suitable?
Which method may be used for laying Quad and OFC cables when site conditions are suitable?
Signup and view all the answers
What is the minimum depth required for laying tail cables?
What is the minimum depth required for laying tail cables?
Signup and view all the answers
In which conditions should protective measures from Drg.No.15-D2 be implemented?
In which conditions should protective measures from Drg.No.15-D2 be implemented?
Signup and view all the answers
What depth should the main cable laid parallel to the track typically be buried?
What depth should the main cable laid parallel to the track typically be buried?
Signup and view all the answers
Which of the following materials is approved for use as protective ducts while laying cables?
Which of the following materials is approved for use as protective ducts while laying cables?
Signup and view all the answers
How frequently should cables be anchored in theft-prone areas?
How frequently should cables be anchored in theft-prone areas?
Signup and view all the answers
What measure is necessary when cables are to be laid in a rocky area where a depth of 1.0 meter is unfeasible?
What measure is necessary when cables are to be laid in a rocky area where a depth of 1.0 meter is unfeasible?
Signup and view all the answers
Which of the following statements is true regarding the laying of Signal & Telecommunication cables?
Which of the following statements is true regarding the laying of Signal & Telecommunication cables?
Signup and view all the answers
What is the minimum distance that cables should be laid away from the independent Earth of an O.H.E structure?
What is the minimum distance that cables should be laid away from the independent Earth of an O.H.E structure?
Signup and view all the answers
What is prohibited within a distance of 300 meters from a feeding post?
What is prohibited within a distance of 300 meters from a feeding post?
Signup and view all the answers
During insulation testing of signalling cables, what voltage should an insulation tester use?
During insulation testing of signalling cables, what voltage should an insulation tester use?
Signup and view all the answers
What should the insulation resistance measured per kilometer be at a buried temperature?
What should the insulation resistance measured per kilometer be at a buried temperature?
Signup and view all the answers
What is the first step to be taken during the insulation resistance testing procedure?
What is the first step to be taken during the insulation resistance testing procedure?
Signup and view all the answers
What should be done if the insulation resistance is found to be lower than 5 mega ohms?
What should be done if the insulation resistance is found to be lower than 5 mega ohms?
Signup and view all the answers
When should insulation resistance tests be conducted for cables?
When should insulation resistance tests be conducted for cables?
Signup and view all the answers
What must be done to any metallic sheath during the insulation resistance test?
What must be done to any metallic sheath during the insulation resistance test?
Signup and view all the answers
What must be present during excavation near underground signal cables?
What must be present during excavation near underground signal cables?
Signup and view all the answers
How often should the insulation of main cables be tested?
How often should the insulation of main cables be tested?
Signup and view all the answers
What additional monitoring capability should be provided for the Earth Leakage Detector (ELD)?
What additional monitoring capability should be provided for the Earth Leakage Detector (ELD)?
Signup and view all the answers
When should the first insulation measurement of a newly laid cable be conducted?
When should the first insulation measurement of a newly laid cable be conducted?
Signup and view all the answers
What is the recommended inspection frequency for protective works at track crossings and similar areas?
What is the recommended inspection frequency for protective works at track crossings and similar areas?
Signup and view all the answers
How often should tail cables (Signal/Track/Points) be insulated resistance tested?
How often should tail cables (Signal/Track/Points) be insulated resistance tested?
Signup and view all the answers
What should be done after major work in a yard regarding the cables?
What should be done after major work in a yard regarding the cables?
Signup and view all the answers
Which of the following is NOT listed as a type of cable for periodic testing?
Which of the following is NOT listed as a type of cable for periodic testing?
Signup and view all the answers
What is the minimum distance a cable must be laid from the nearest edge of the mast supporting the catenary if the cable is less than 0.5 meters deep?
What is the minimum distance a cable must be laid from the nearest edge of the mast supporting the catenary if the cable is less than 0.5 meters deep?
Signup and view all the answers
In what circumstances must digging beyond 0.50 meters be done in the presence of an official?
In what circumstances must digging beyond 0.50 meters be done in the presence of an official?
Signup and view all the answers
What is the required distance for cables laid in the vicinity of traction substations from any metallic part of the O.H.E?
What is the required distance for cables laid in the vicinity of traction substations from any metallic part of the O.H.E?
Signup and view all the answers
If it is challenging to maintain the minimum distance of 3 meters from the nearest edge of the O.H.E structure, what is the recommended solution?
If it is challenging to maintain the minimum distance of 3 meters from the nearest edge of the O.H.E structure, what is the recommended solution?
Signup and view all the answers
What is the minimum distance cables should be laid away from the earthing of substations?
What is the minimum distance cables should be laid away from the earthing of substations?
Signup and view all the answers
How should cables be laid near switching stations with respect to the station's fixed metallic bodies?
How should cables be laid near switching stations with respect to the station's fixed metallic bodies?
Signup and view all the answers
What is the maximum trench depth for laying cables without needing supervision from an official?
What is the maximum trench depth for laying cables without needing supervision from an official?
Signup and view all the answers
What precaution is necessary to avoid damage to the cable in the event of a failure of an overhead insulator?
What precaution is necessary to avoid damage to the cable in the event of a failure of an overhead insulator?
Signup and view all the answers
What is the minimum separation required between signalling cables and LT power cables?
What is the minimum separation required between signalling cables and LT power cables?
Signup and view all the answers
When laying multiple cables, which order should they be placed to facilitate maintenance identification?
When laying multiple cables, which order should they be placed to facilitate maintenance identification?
Signup and view all the answers
What precautions should be taken when suspending outdoor signalling cables?
What precautions should be taken when suspending outdoor signalling cables?
Signup and view all the answers
What is the required distance for laying cables outside the station section from the nearest track center?
What is the required distance for laying cables outside the station section from the nearest track center?
Signup and view all the answers
How should trenches for cables be dug within the station section?
How should trenches for cables be dug within the station section?
Signup and view all the answers
What should be done after laying the cables in terms of back filling?
What should be done after laying the cables in terms of back filling?
Signup and view all the answers
What is the recommended method for laying indoor signalling cables?
What is the recommended method for laying indoor signalling cables?
Signup and view all the answers
What type of joints should be used for cables after laying them?
What type of joints should be used for cables after laying them?
Signup and view all the answers
What should be done before laying the cable in the trench?
What should be done before laying the cable in the trench?
Signup and view all the answers
How should the cable be laid in rocky ground according to the guidelines?
How should the cable be laid in rocky ground according to the guidelines?
Signup and view all the answers
What is the minimum width that a cable trench should be maintained at?
What is the minimum width that a cable trench should be maintained at?
Signup and view all the answers
How should the cable be paid out from the drum?
How should the cable be paid out from the drum?
Signup and view all the answers
What is the purpose of providing spare conductors in main cables?
What is the purpose of providing spare conductors in main cables?
Signup and view all the answers
What is a crucial consideration when designing a tunnel for cable installation?
What is a crucial consideration when designing a tunnel for cable installation?
Signup and view all the answers
What should be done if the cable drum is in a damaged condition?
What should be done if the cable drum is in a damaged condition?
Signup and view all the answers
In planning for cabling, which aspect is critical regarding the positioning of cables?
In planning for cabling, which aspect is critical regarding the positioning of cables?
Signup and view all the answers
Which of the following is a recommended practice for the storage of cable drums?
Which of the following is a recommended practice for the storage of cable drums?
Signup and view all the answers
What is required from the operator when mechanized equipment is being used?
What is required from the operator when mechanized equipment is being used?
Signup and view all the answers
What is the significance of conducting a foot survey after determining cable sizes and conductors?
What is the significance of conducting a foot survey after determining cable sizes and conductors?
Signup and view all the answers
What is the preferred method for moving a cable drum during transportation?
What is the preferred method for moving a cable drum during transportation?
Signup and view all the answers
What should be the condition of the trench bottom before laying cables?
What should be the condition of the trench bottom before laying cables?
Signup and view all the answers
Which of the following best describes the recommendation for cable maintenance when multiple cables are laid?
Which of the following best describes the recommendation for cable maintenance when multiple cables are laid?
Signup and view all the answers
What must be included in a cable route plan to comply with regulations?
What must be included in a cable route plan to comply with regulations?
Signup and view all the answers
Which area should be avoided when routing cables?
Which area should be avoided when routing cables?
Signup and view all the answers
What is the recommended thickness of the protective cover that should be placed over the cable in the trench?
What is the recommended thickness of the protective cover that should be placed over the cable in the trench?
Signup and view all the answers
What essential step should be taken before laying cable in a trench?
What essential step should be taken before laying cable in a trench?
Signup and view all the answers
What is NOT a requirement when laying cables according to the general guidelines?
What is NOT a requirement when laying cables according to the general guidelines?
Signup and view all the answers
Why is it advisable to incorporate changes in the cable route plan promptly?
Why is it advisable to incorporate changes in the cable route plan promptly?
Signup and view all the answers
What should NOT be done when rolling a cable drum during unloading?
What should NOT be done when rolling a cable drum during unloading?
Signup and view all the answers
What is a key requirement during the cable laying process in various terrains?
What is a key requirement during the cable laying process in various terrains?
Signup and view all the answers
What is the minimum recommended spare conductor percentage beyond the farthest point zone?
What is the minimum recommended spare conductor percentage beyond the farthest point zone?
Signup and view all the answers
When should cable insulation resistance tests be conducted?
When should cable insulation resistance tests be conducted?
Signup and view all the answers
What is the recommended method for cables that are crossing the track?
What is the recommended method for cables that are crossing the track?
Signup and view all the answers
What should be avoided when installing cables inside the Cable room or Relay room?
What should be avoided when installing cables inside the Cable room or Relay room?
Signup and view all the answers
What is a preferred technique when crossing small culverts with low flood levels?
What is a preferred technique when crossing small culverts with low flood levels?
Signup and view all the answers
When cables cross a metallic bridge, what precaution must be taken?
When cables cross a metallic bridge, what precaution must be taken?
Signup and view all the answers
What is the optimal condition for excavation of trenches during cable laying?
What is the optimal condition for excavation of trenches during cable laying?
Signup and view all the answers
When laying cables under a road or high bank, what is an advised method?
When laying cables under a road or high bank, what is an advised method?
Signup and view all the answers
What should be done with the soil excavated from the trenches?
What should be done with the soil excavated from the trenches?
Signup and view all the answers
What positioning is crucial for avoiding damage during cable installation?
What positioning is crucial for avoiding damage during cable installation?
Signup and view all the answers
Which protective method is required when laying cables in rocky soil where the depth of 1.0 meter cannot be achieved?
Which protective method is required when laying cables in rocky soil where the depth of 1.0 meter cannot be achieved?
Signup and view all the answers
What action should be taken when cables are to be laid in areas with existing utilities such as station yards?
What action should be taken when cables are to be laid in areas with existing utilities such as station yards?
Signup and view all the answers
What is the typical depth at which main cables laid parallel to the track should be buried?
What is the typical depth at which main cables laid parallel to the track should be buried?
Signup and view all the answers
How often should cables be anchored in theft-prone areas according to the guidelines?
How often should cables be anchored in theft-prone areas according to the guidelines?
Signup and view all the answers
Which of the following is NOT an approved method for laying cables underground?
Which of the following is NOT an approved method for laying cables underground?
Signup and view all the answers
When cables are laid across a track, what is the minimum depth they should be buried?
When cables are laid across a track, what is the minimum depth they should be buried?
Signup and view all the answers
What type of pipe is recommended for protecting cables during the laying process?
What type of pipe is recommended for protecting cables during the laying process?
Signup and view all the answers
What precaution should be taken regarding signal and telecommunication cables during installation?
What precaution should be taken regarding signal and telecommunication cables during installation?
Signup and view all the answers
Study Notes
Chapter 15: Cables - Section 1: General
- Railway signaling circuits use cables of approved types
- Existing guidelines from Railway Board, RDSO, and PCSTE are to be followed for cable laying
- Planning for Cabling: Determine the number of conductors required, based on the planned circuits. Use recommended core sizes.
- Sufficient spare conductors are needed for each main cable.
- Minimum of 20% spare conductors up to the farthest point zone, followed by a minimum of 10% spare conductors beyond. If there are 3 or less conductors, no spares are required
- Distribute cable placement for easy disconnection during maintenance, prioritizing line-wise and function-wise connections.
- Design cables for auxiliary signals separately.
- A foot survey is necessary to map the best cable route.
- Cable route plans must show the exact track alignment. Indicate crossings, structures, water/sewage mains, etc. Ensure that existing cable routes are also shown.
- Engineering and Electrical departments must approve the cable route plan, and the S&T open line must also be approved when the plan is not prepared by open line staff.
- Avoid low-lying areas, platform copings, drainages, hutments, rocky areas, points, crossings, and proximity to electrical substations/switching stations.
- Separate cables of appropriate size must be available for point operation.
Chapter 15: Cables - Section 2: Paying Out, Trenching, and Laying of Cables
- Cable drums have to be mounted on cable wheels during paying out. No kinks are permitted when paying out cables.
- Place the drum at the trench end and lay the cable along it.
- Workers should move along the trench to carry the cable, avoiding damage from dragging on the ground.
- Visual inspection and testing of cable insulation must be performed before burial.
- Lay cable in the trench, record insulation/loop resistance.
- Cable drums placed in suitable axles and cable drawn out by workers when wheels are not available.
- Do not lay cable or drag it on the ground when rolling cable drums/transporting them.
- Wherever mechanized equipment is used, a trained operator, under SSE/JE supervision, must manage the related works.
- Damaged cable drums require placements on horizontal revolving platforms, paying out using rotation, not pulling.
Chapter 15: Cables - Section 2: Trenching
- Trench width should be appropriate to the cable count; minimum 0.3 meters.
- Smooth, level bottoms for cable placement are needed, including soft ground preparation with sand or sifted earth layers (0.05 meters).
- Rocky ground requires a similar preparation with a sandy layer underneath and a protective cover of approved material such as trough or bricks.
- Remove any sharp boulders/rocks from the trench. Soft material like river sand might be used.
Chapter 15: Cables - Section 2: Laying of Cable
- Cables must be laid in trenches, ducts, cement troughs, pipes or other approved methods.
- Maintain proper depth for buried cables, typically 1 meter or more (1.2 meters for theft-prone areas), from the ground top.
- Maintain 5.5 meters clearance from track centerlines outside stations, closer to track centerlines (at least 3 meters) for installation within stations.
- Maintain a minimum of 6 to 8 meters of surplus cable length at both ends of the main cable.
Chapter 15: Cables - Section 3: Cable Laying in RE Area
- Use only unscreened, approved underground cables for signaling.
- Ensure that cables are at least 1 meter from live electrical conductors (catenaries) and at least 3 meters from overhead equipment in case the burial depth exceeds 0.5 meters.
- Provide concrete ducts/DWC-HDPE pipes in proximity of OHE structures.
- Maintain a 1-meter separation from metallic parts within traction substations/feeder posts.
- Maintain a 1-meter distance from metallic parts & 5 meters from earthing at switching/sub stations (reducible to 1 meter with approved conduits)
Chapter 15: Cables- Section 4: Insulation Resistance Testing of Signal Cables
- Insulation resistance tests are required when conductors, cables, and insulated parts are cleaned and dry.
- Use a 500V insulation tester for signaling cables and a 100V tester for quad cables.
- Bond all metallic sheaths/metal works to ground.
- Disconnect each cable core from both ends.
- Connect a tester to each conductor and ground the other conductors.
- Insulation resistance should measure at least 5 mega ohms per kilometer in buried cables.
- Immediate repair/replacement is needed if insulation resistance fails to meet the specified requirements.
- Tests must be completed without affecting train operation, ensuring safe equipment use.
Chapter 15: Cables - Section 5: Maintenance of Cables
- Conduct annual or triennial insulation tests for dry weather on signaling cables (or annually if using ELD for monitoring), while testing tail cables annually.
- Random testing for wet weather is permissible.
- Keep all cable termination points, pillar boxes, heads, and glands in a clean, dry state; inspect for moisture/leak issues.
- No excavations without signal/telecommunication representatives or necessary safety precautions.
- Ensure regular inspection of protective works (culverts, bridges, etc.).
- Record test results.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
This quiz covers the essential guidelines and best practices for laying railway signaling cables as outlined in Chapter 15, Section 1. Key topics include planning, conductor requirements, and cable route mapping. Test your knowledge on the standards set by railway authorities and the importance of maintenance accessibility.