Railway Safety and Regulations
40 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary purpose of the application mentioned in the content?

  • To obtain sanction to open the railway line for public carriage of passengers (correct)
  • To request permission to operate locomotives and rolling-stock
  • To obtain a Safety Certificate for the newly constructed railway line
  • To inspect the work prior to its opening for the public carriage of passengers
  • What is the reference to the rules in the second paragraph?

  • Section 22(a) of the Railways Act, 1989
  • Chapter VII of the Railways Act, 1989
  • Manuals of Instructions for Signaling and Interlocking and Block Signaling
  • Chapter VII of the Railways (Opening for Public Carriage of Passengers) Rules, 2000 (correct)
  • What will the Engineer-in-charge submit prior to the opening of the work for the public carriage of passengers?

  • A list of deviations from the General and Subsidiary Rules
  • A description of the proposed works
  • A report on the temporary works
  • The Safety Certificate duly signed by him (correct)
  • What is the purpose of the application mentioned in the fourth paragraph?

    <p>To obtain permission to operate locomotives and rolling-stock</p> Signup and view all the answers

    What is included in the appended documents according to the content?

    <p>Several documents including the description of temporary works, drawings, and lists of infringements and deviations</p> Signup and view all the answers

    What will the Engineer-in-charge do in the event of the inspector not inspecting the work prior to its opening?

    <p>Submit the Safety Certificate duly signed by him</p> Signup and view all the answers

    What is the relevance of Section 22(a) of the Railways Act, 1989?

    <p>It relates to the operation of locomotives and rolling-stock on the proposed line</p> Signup and view all the answers

    What is the purpose of the email mentioned in the content?

    <p>To intimate that the work has been opened and the Safety Certificate has been signed</p> Signup and view all the answers

    What is the primary focus of the Rules laid down in the Railways Act, 1989, the Indian Railways (Open Lines) General Rules, 1976, and the Railways (Opening for Public Carriage of Passengers) Rules, 2000?

    <p>To govern the safety of the travelling public</p> Signup and view all the answers

    What is the purpose of the Indian Railways Schedule of Dimensions?

    <p>To provide guidelines for railway infrastructure design</p> Signup and view all the answers

    Under which section of the Railways Act, 1989 is the sanction of Commissioner of Railway Safety required for works on the open line?

    <p>Section 23</p> Signup and view all the answers

    What type of work on the open line requires the sanction of Commissioner of Railway Safety?

    <p>Works that affect the running of passenger trains</p> Signup and view all the answers

    What is the exception to the requirement of obtaining the sanction of Commissioner of Railway Safety for works on the open line?

    <p>Emergency situations</p> Signup and view all the answers

    What is the purpose of Chapter VII of the Railways (Opening for Public Carriage of Passengers) Rules, 2000?

    <p>To specify the procedure for obtaining sanction for works on the open line</p> Signup and view all the answers

    What is the role of the Commissioner of Railway Safety in relation to works on the open line?

    <p>To sanction works on the open line</p> Signup and view all the answers

    What is the purpose of the notice of works requiring the sanction of Commissioner of Railway Safety?

    <p>To comply with the regulatory requirements</p> Signup and view all the answers

    What is the purpose of the certification mentioned in the given content?

    <p>To ensure the safety of the passengers and employees of the Railway</p> Signup and view all the answers

    What is the 'temporary' speed restriction due to?

    <p>The reason mentioned in the certification document</p> Signup and view all the answers

    Who is responsible for countersigning the certification document?

    <p>All of the above</p> Signup and view all the answers

    What is the purpose of the 'Note' at the end of the certification document?

    <p>To specify the exceptions to the certification</p> Signup and view all the answers

    Why is the '(and tested +)' phrase used in the certification document?

    <p>To show that the work is related to Signaling and Interlocking</p> Signup and view all the answers

    What is the purpose of the 'Copy forwarded to' section?

    <p>To provide a copy of the certification to the relevant authorities</p> Signup and view all the answers

    What is the purpose of the 'Dated' fields in the certification document?

    <p>To record the date of certification</p> Signup and view all the answers

    Who is the primary person responsible for the certification?

    <p>The person conducting the inspection</p> Signup and view all the answers

    What is the primary method of dispatching the certificate to the Officers concerned?

    <p>By quickest means, followed by confirmatory copies by letter</p> Signup and view all the answers

    Who is responsible for handing over a copy of the certificate to the representative of the Operating Department?

    <p>The Engineering representative</p> Signup and view all the answers

    What is the purpose of testing diversions by running a Material train or light engine?

    <p>To ensure safety before opening for public traffic</p> Signup and view all the answers

    When is the Certificate to Commissioner of Railway Safety not required to be sent?

    <p>When the line is restored through communication within 24 hours</p> Signup and view all the answers

    What happens when the use of temporary diversion is likely to be extended for more than three days?

    <p>The Commissioner of Railway Safety may inspect the diversion at the earliest opportunity</p> Signup and view all the answers

    What rules and procedure must be strictly followed when opening a new line for traffic?

    <p>The Railways (Opening for Public Carriage of Passengers) Rule 2000</p> Signup and view all the answers

    What is the purpose of the Application for Sanction form?

    <p>To apply for sanction to open a new line for traffic</p> Signup and view all the answers

    What is the significance of the Commissioner of Railway Safety in the context of opening a new line for traffic?

    <p>The Commissioner of Railway Safety sanctions the opening of a new line for traffic</p> Signup and view all the answers

    Who receives a copy of the certificate in connection with the restoration of through running after accidents?

    <p>Chief Engineer</p> Signup and view all the answers

    What is the primary purpose of the certificate in connection with the restoration of through running after accidents?

    <p>To certify that the work is opened to traffic without danger to public or goods</p> Signup and view all the answers

    Who is responsible for signing the certificate in connection with the restoration of through running after accidents?

    <p>Engineer-in-charge</p> Signup and view all the answers

    What is the consequence of the work being opened to traffic without danger to public or goods?

    <p>A speed restriction is imposed</p> Signup and view all the answers

    What is the purpose of the message sent by the Station Master?

    <p>To inform of the restoration of through running</p> Signup and view all the answers

    Who is informed of the restoration of through running after accidents?

    <p>All concerned</p> Signup and view all the answers

    What is the outcome of the restoration of through running after accidents?

    <p>The line is restored to working order with a speed restriction</p> Signup and view all the answers

    Who is responsible for ensuring that the work is opened to traffic without danger to public or goods?

    <p>Engineer-in-charge</p> Signup and view all the answers

    Study Notes

    CRS Sanction for Works Affecting Passenger Running Lines

    • The safety of the traveling public is governed by the Rules laid down in The Railways Act, 1989, The Indian Railways (Open Lines) General Rules, 1976, The Railways (Opening for Public Carriage of Passengers) Rules, 2000, and Indian Railways Schedule of Dimensions.
    • The sanction of the Commissioner of Railway Safety is required for the execution of any work on the open line, which will affect the running of trains carrying passengers and for any temporary arrangement necessary for carrying it out, except in cases of emergency.

    Works Requiring Sanction of Commissioner of Railway Safety

    • The sanction of the Commissioner of Railway Safety is required for works on the open line, which will affect the running of trains carrying passengers and for any temporary arrangement necessary for carrying it out, except in cases of emergency.
    • A certificate shall be dispatched by the quickest means to the Officers concerned, followed by confirmatory copies by letter.
    • Diversions should, wherever possible, be tested by running a Material train, or light engine over them, before opening for public traffic.

    Opening of New Lines

    • Whenever it is proposed to open a new line for traffic, or to initiate the use of Electric Motive Power on a line already opened, or to commission a line where gauge conversion has been done, the rules and procedure contained in the relevant Chapters of “The Railways (Opening for Public Carriage of Passengers) Rule 2000 (as amended from time to time)” shall be strictly followed.

    Application for Sanction

    • The Application for Sanction includes the project description, drawings, lists of infringements to Schedule of Dimensions, deviations from the Manuals of Instructions for Signaling and Interlocking and Block Signaling, and General and Subsidiary Rules.

    Certificate for Restoration of Through Running after Accidents

    • The Certificate is required to restore through running after accidents, and it includes the Engineer-in-charge's certification that the work has been inspected and tested and is in good working order.
    • The Certificate is signed by the Engineer-in-charge and countersigned by the Assistant Divisional Engineer, Assistant Signal & Telecommunication Engineer, and Assistant Bridge Engineer.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    Description

    This quiz covers the safety regulations and rules governing Indian railways, specifically focusing on passenger running lines and references to the Railways Act and Open Lines General Rules.

    More Like This

    Railway Safety Regulations
    40 questions

    Railway Safety Regulations

    SolicitousOklahomaCity avatar
    SolicitousOklahomaCity
    Railway Safety Regulations
    40 questions

    Railway Safety Regulations

    SolicitousOklahomaCity avatar
    SolicitousOklahomaCity
    Indian Railways Rules Overview 2023
    16 questions
    Indian Railway Signalling Installations
    84 questions
    Use Quizgecko on...
    Browser
    Browser