Quality Management Introduction

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary purpose of 'Plan Quality Management'?

  • To identify quality requirements and standards for the project and its deliverables. (correct)
  • To execute quality control measures during project execution.
  • To train project team members on quality assurance techniques.
  • To manage and resolve quality-related conflicts among stakeholders.

In the context of project quality management, what does 'EEF' stand for?

  • Essential Environmental Factors
  • Enterprise Environmental Factors (correct)
  • External Economic Forecasts
  • Extrinsic Evaluation Framework

Which of the following tools is used to creatively gather data from a group of experts to develop a Quality Management Plan?

  • Brainstorming (correct)
  • Cost-benefit analysis
  • Benchmarking
  • Interviews

What is the primary function of a 'Quality Controller' in quality management systems?

<p>To inspect or test the outputs of the quality management system. (C)</p> Signup and view all the answers

Which of the following BEST describes 'Quality Standards'?

<p>Standards governed by a quality agency, often implemented at a company or organization level. (C)</p> Signup and view all the answers

What is the difference between 'Attribute Sampling' and 'Variable Sampling'?

<p>Attribute sampling categorizes results as conforming or non-conforming, while variable sampling rates results on a continuous scale. (A)</p> Signup and view all the answers

What is the main purpose of having tolerances and control limits?

<p>To provide a boundary of common variation in a statistically stable process or process performance. (C)</p> Signup and view all the answers

According to the materials, a key output of the plan quality management process is:

<p>Quality management plan (B)</p> Signup and view all the answers

Which data gathering technique involves comparing actual or planned practices to those of comparable projects to identify best practices?

<p>Benchmarking (B)</p> Signup and view all the answers

Which of the following BEST describes 'Quality Specifications'?

<p>Limited to a specific project or government agency. (C)</p> Signup and view all the answers

What should a well-written assignment include?

<p>Assignment should be well written, reviewed and edited. Spelling and Grammar has weight on the score (B)</p> Signup and view all the answers

In the context of quality management, what is indicated when an assignment is described as needing a 'quality check'?

<p>The work should be reviewed by someone before submission. (B)</p> Signup and view all the answers

Which activity is NOT typically associated with prevention costs?

<p>Product inspection (C)</p> Signup and view all the answers

In which project phase are appraisal costs typically incurred?

<p>Project execution (D)</p> Signup and view all the answers

Which of the following is an example of an internal failure cost?

<p>Rework (C)</p> Signup and view all the answers

What is the MAIN goal of Total Quality Management (TQM)?

<p>To emphasize the importance of process thinking and customer satisfaction. (B)</p> Signup and view all the answers

In Total Quality Management (TQM), what does it mean to be 'customer-focused'?

<p>The customer ultimately determines the level of quality. (B)</p> Signup and view all the answers

Which of the following BEST describes the role of effective communications in Total Quality Management (TQM)?

<p>Effective communications plays a large part in maintaining morale and in motivating employees at all levels. (A)</p> Signup and view all the answers

What is the purpose of 'Manage Quality'?

<p>To translate the quality management plan into executable quality activities. (C)</p> Signup and view all the answers

Which of the following is a tool or technique used in the 'Manage Quality' process?

<p>Document analysis. (B)</p> Signup and view all the answers

What information does a 'Quality Report' provide?

<p>Progress of Quality throughout the timeline of the project. (C)</p> Signup and view all the answers

What are the 7 Basic Quality Tools primarily used for?

<p>For problem-solving, quality control, and process improvement (B)</p> Signup and view all the answers

What is the primary aim of using a Cause and Effect Diagram?

<p>To find the root causes of a problem (D)</p> Signup and view all the answers

In what scenario is a check sheet most useful?

<p>When data can be observed repeatedly by the same person or a the same location (A)</p> Signup and view all the answers

A control chart is used to monitor:

<p>How a process changes over time (C)</p> Signup and view all the answers

When is a Pareto chart most effective?

<p>Focusing on the most significant factors (A)</p> Signup and view all the answers

When should you use a Scatter Diagram?

<p>When you have paired numerical data and want to see if they are related (B)</p> Signup and view all the answers

What is the definition of 'stratification'?

<p>The act of sorting data into distinct groups or layers. (D)</p> Signup and view all the answers

What is the focus of Lean Six Sigma?

<p>Data analysis and eliminating waste (A)</p> Signup and view all the answers

Which elements are included in Non-Conformance Reports (NCR)?

<p>Project Name, Responsibility of the NCR, Description of the NCR, corrective Action With Signature (A)</p> Signup and view all the answers

What is the difference between Corrective and Preventive Action?

<p>Preventive ensures future work performance is aligned and Corrective realigns the project work (B)</p> Signup and view all the answers

Which of the following questions exemplifies a critical consideration of Quality and Ego in Project Management?

<p>Was it right? (B)</p> Signup and view all the answers

Which of the following is NOT an input of Control Quality?

<p>Brainstorming results (B)</p> Signup and view all the answers

Which is an output associated with Control Quality?

<p>Verified deliverables (A)</p> Signup and view all the answers

In a checklist used for quality control, what is the purpose of including 'Requirements to Meet Standard/Parameters'?

<p>To provide a reference for the inspector/tester about what criteria should be met. (A)</p> Signup and view all the answers

Why is it important that the individual signing off on a checklist has knowledge of the item being inspected?

<p>To ensure the quality inspection does not end with simply filling out the checklist. (A)</p> Signup and view all the answers

Within the DMAIC methodology, which phase focuses on identifying the as-is process capability?

<p>Measure (C)</p> Signup and view all the answers

Within the DMADV methodology, which comes last?

<p>Verify (C)</p> Signup and view all the answers

How does Lean achieve it's goals and what are examples of this?

<p>Less technical tools such as kaizen, workplace organization, and visual controls. (B)</p> Signup and view all the answers

What is 'Design for X' (DfX)?

<p>A set of technical guidelines applied during product design to optimize a specific aspect. (A)</p> Signup and view all the answers

With inspiration from Monster Garage, why would someone be weary of having Randy Grubb work on their gas tank?

<p>Randy Grubb has a strong ego and may not listen to others or test appropriately. (A)</p> Signup and view all the answers

Let's say you have someone on your team with 30 years of experience but NO quality training. Alternatively, you have someone with Quality training but little to no experience. Which of these scenarios is ideal?

<p>Both have pros and cons -- there is not a clear better candidate. (B)</p> Signup and view all the answers

Flashcards

Plan Quality Management

A process of identifying quality requirements and/or standards for the project and its deliverables, and documenting how the project will demonstrate compliance.

Quality Management Plan

A document specifying the standards, practices, resources, specifications, and sequence of activities relevant to a particular quality system.

Inputs and outputs

The inputs, tools and techniques and outputs that are required to determine the project quality

Quality Assurance

The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.

Signup and view all the flashcards

Quality Control

The inspection or testing to determine whether work results conform to standards.

Signup and view all the flashcards

Quality Controller

An inspector or tester that will be executing the Quality Management systems

Signup and view all the flashcards

Stratification

The act of sorting data, people, and objects into distinct groups or layers

Signup and view all the flashcards

Specifications

Concise statements of requirements for materials, products, or services to be purchased by an industry or government agency.

Signup and view all the flashcards

Parameter

A numerical or measurable factor defining a system or its operational conditions

Signup and view all the flashcards

Prevention Costs

The cost to ensure conformance

Signup and view all the flashcards

Cause and Effect Diagram

A visual tool showing potential causes for a specific effect or problem.

Signup and view all the flashcards

Check Sheet

A form used to collect data in a systematic way for analysis.

Signup and view all the flashcards

Control Chart

A graph used to monitor how a process changes over time.

Signup and view all the flashcards

Histogram

A graph showing the frequency of data values.

Signup and view all the flashcards

Pareto Chart

A bar graph that orders categories by frequency or cost to show significance.

Signup and view all the flashcards

Scatter Diagram

A graph plotting pairs of data to explore relationships between variables.

Signup and view all the flashcards

Quality Reports Purpose

Quality reports provide an update to key stakeholders on quality progress throughout the project

Signup and view all the flashcards

Non-conformance

A non-conformance is any failure to meet a requirement. A requirement can be that of a customer's, statutory or regulatory body, or your organization's (i.e. Failure to follow a procedure)

Signup and view all the flashcards

A preventive Action

An intentional activity that ensures the future performance of the project work is aligned with the project management plan

Signup and view all the flashcards

A Corrective Action

An intentional activity that realigns the performance of the project work with the project management plan

Signup and view all the flashcards

Six Sigma

A method to improve the capability of business processes, reduce variation, and decrease defects.

Signup and view all the flashcards

Six Sigma's DMAIC

Projects for improving a business process: Define, Measure, Analyze, Improve, Control

Signup and view all the flashcards

DMADV (Six Sigma

Projects aimed at creating processes: Define, Measure, Analyze, Design, Verify

Signup and view all the flashcards

Lean Six Sigma

Focusing on both eliminating waste and reducing variation.

Signup and view all the flashcards

Control Quality Processes

The process of monitoring and recording results of executing the quality management activities in order to assess performance and ensure the project outputs are complete, correct, and meet customer expectations.

Signup and view all the flashcards

Manage Quality

The process of translating the quality management plan into executable quality activities that incorporate the organization's quality policies in to the project.

Signup and view all the flashcards

Brainstorming

Can be used to gather data creatively from a group of experts to develop the QMP that best fits the upcoming project.

Signup and view all the flashcards

Benchmarking

Comparing actual or planned practices to those of comparable projects to identify best practices, generate ideas for improvement and provide a basis for measuring performance.

Signup and view all the flashcards

Study Notes

  • Quality Management serves as an introduction to the concept.
  • Mark Warkentin is the instructor, a Professional Engineer (P.Eng.) and a Project Management Professional (PMP).
  • Warkentin is a University of Manitoba graduate in Civil Engineering (2007).
  • Warkentin started at ND Lea Engineering in 2007.
  • Warkentin became part of MMM Group Limited in 2009.
  • Warkentin transitioned to WSP Canada Group Limited in 2016.
  • Warkentin worked for the City of Winnipeg as a Streets Project Engineer until 2020.
  • Warkentin graduated with a Masters Certificate in Project Management in 2014.
  • Warkentin earned PMP certification in 2018.

Course Layout

  • Lecture 1 introduces Quality Planning and Management.
  • Assignment 1 requires a long answer on Quality Standards.
  • Lecture 2 deals with how to Manage Quality
  • Assignment 2 is on the Cost of Quality.
  • Lecture 3 continues on Managing Quality.
  • No Assignment for Lecture 3 although there is a Site Tour scheduled to WSP Testing Lab and a Guest speaker: Kelly McBride presentation.
  • Lecture 4 covers Control Quality.
  • Assignment 3 involves a Scatter/Ishikawa Diagram.
  • Lecture 5 focuses on Control Quality.
  • Assignment 4 is a group project presentation.
  • Lecture 6 is on Plan Quality Management.
  • There is no assignment for the sixth lecture.
  • Lecture 7 is the EXAM

Class Expectations

  • Class attendance is expected.
  • Class participation counts toward the grade.
  • Email the instructor in advance if you cannot be in class.
  • Asking questions is encouraged.
  • This is the instructor's tenth time teaching, but fifth time in person. Feedback appreciated.
  • Assignments should be well-written, edited, and reviewed. Scoring considers Spelling and Grammar.
  • Review assignments before submitting them. Consider it a quality check.
  • Content repeated more than once emphasized for the final exam.

Office Hours

  • Monday afternoons are reserved for Group Project time; students are welcome to work elsewhere but the teacher will be available for discussion.
  • Specific times can be coordinated outside of this time slot, so email to coordinate.
  • Group meetings are welcome, if a team has a question, come all together.

Industries Represented

  • IT, Construction, Engineering, Manufacturing, Health, and Finance are industries that are represented in the class.

Topics - Plan Quality Management

  • Lecture 1 reviews plan quality management.
  • Lecture 6 goes over plan quality management topics.

Quality In Cookies

  • There will be tasting and judgements of cookies.
  • There will be a survey taken on "highest quality" cookies.

Understanding Quality

  • A class discussion on quality will be had.
  • Quality needs to be defined.
  • Where quality is seen in everyday life should be explored
  • How to measure quality needs to be determined.
  • PDCA (Plan, Do, Check, Act) is a cyclical methodology for quality improvement.

Connections Between All Quality Processes

  • Plan Quality Management establishes the Quality Management Plan and metrics, drawing from organizational process assets.
  • Manage Quality uses deliverables and work performance data to create quality reports.
  • Control Quality uses quality reports, quality control measurements, and work performance information to validate scope.
  • Project Integration Management feeds deliverables into Manage Quality.

Plan Quality Management Definition

  • Plan Quality Management identifies requirements and/or standards for the project and deliverables, and documents compliance demonstration.

Inputs to Plan Quality Management

  • Project Charter, Project Management Plan, Requirements Management Plan, Risk Management Plan, Stakeholder Engagement Plan, and Scope Baseline are key inputs.
  • Project documents, including the Assumption Log, Requirements Documentation, Requirements Traceability Matrix, Risk Register, and Stakeholder Register, serve as inputs.
  • Enterprise Environmental Factors (EEF) and Organizational Process Assets (OPA) are also considered.

Tools and Techniques

  • Expert Judgment, Data Gathering (Benchmarking, Brainstorming, Interviews), and Data Analysis are used.
  • Data analysis techniques include Cost-Benefit Analysis and Cost of Quality.
  • Decision Making (Multicriteria Decision Analysis) and Data Representation (Flowcharts, Logical Data Model, Matrix Diagrams, Mind Mapping) play a role.
  • Test and Inspection Planning, along with Meetings, are essential tools.

Outputs of Plan Quality Management

  • The Quality Management Plan and Quality Metrics are key outputs.
  • Project Management Plan, Risk Management Plan, and Scope Baseline updates are important.
  • Project documents updates, including Lessons Learned Register, Requirements Traceability Matrix, Risk Register, and Stakeholder Register are created.

Data Gathering Techniques

  • Benchmarking involves comparing actual or planned practices to comparable projects for identifying best practices and improvement.
  • Brainstorming gathers data creatively from experts to develop the QMP.
  • Interviews involve experienced project stakeholders.

Terminology

  • Quality Controller inspects or tests Quality Management systems.
  • Quality Assurance Personnel ensures the Quality Control team adheres to QMP standards, typically testing 10-15% of Quality Control.
  • Quality Standards are governed by a Quality agency and implemented into a company or organization. Ex. ISO.
  • Quality Specifications are governed by a local body or company for project implementation. Eg. City of Winnipeg Construction Specifications.
  • Parameters are numerical or measurable factors that define system conditions, found within Specifications and Standards.

Types of Standards

  • Standards are categorized by type, dimension, structure, equipment, quality, grade, component, performance, durability, or safety.
  • Standards methods include: manufacturing, designing, drawing, using or operation of safety condition of production.
  • Standards are set by method of testing, analyzing, appraising, verifying, or measuring.
  • Standards are terms, abbreviations, symbols, marks, preferred numbers, or units along with design, methods of execution, or safety conditions.

Types of Specifications

  • Specifications are concise requirements for materials, products or services purchased by an industry or government agency.
  • Specifications are limited to a specific project or government agency.
  • Standards are the most practical and appropriate current solution, agreed upon by an authority, for a recurring problem.

Parameters Breakdown

  • Errors include prevention and inspection.
  • Prevention keeps errors out of the process.
  • Inspection keeps errors out of customer hands.
  • Sampling includes attribute sampling (conforms or does not conform) and variable sampling (rated on a scale).
  • Tolerances involve a specified range of acceptable results and control limits.
  • Control limits identify boundaries of common variation in a statistically stable process or process performance.

Plan Quality Management

  • Quality Standards are detailed in the long answer questions of the assignment.
  • Instructions for how to complete can be found on Nexus.

Quality Management Plan

  • A Group Project.
  • The Group Project will create a Quality Management Plan.
  • Instructions for how to complete can be found on Nexus.

Manage Quality Overview

  • Lectures 2 and 3 involves and examines Manage Quality.

Input for Managing Quality

  • Project Management Plan serves an an input to defining quality requirements and or standards for the project.
  • Documents like the Assumption Log, Requirements Documentation, Requirements Traceability Matrix, Risk Register, Stakeholder Register are inputs.
  • Enterprise Environmental Factors (EEF) and Organizational Process Assets (OPA) are also considered.

Inspection and Test Plans

  • List activities and task inspections using the Work Breakdown Structure by indicating what is occuring.
  • Include a code or reference to the Standards/Specifications being what code/reference can requirements listed in the QMP be found.
  • Set the inspection criteria, defining the responsible person and their duties.
  • Define Acceptance Criteria while providing the code/reference in the code is needed.
  • A Checklist should be used with the Inspection Plan by the QC.

Inspection Criteria

  • Surveillance involves periodic checks. For example, a security guard or embankment fill
  • Execution requires QC attendance and sign-off on the Checklist in the signoff, For example, placing concrete or maintenance of machinery in a manufacturing plant.
  • Witness requires QC attendance which is expected where sign off on operation happens later. For example, installing roadside signage.
  • Hold Point means the QC is required to sign off and work cannot proceed without that. For example, the Installation of sewer pipe or pouring concrete.
  • Review stipulates Documents to be reviewed. For example, a Cake recipe.
  • Records are documents that must record information for documentation. For example, Test results.

Test Sampling

  • Randomized test sampling should be applied and not selective. Meaning, Ex. Density testing on base, selection of items to be tested in a manufacturing process.

Cost of Quality (COQ)

  • Cost of Quality includes both the conformance and nonconformance costs.
  • Conformance costs prevent failures and include prevention and appraisal costs.
  • Nonconformance costs results from failures and includes internal and external failure costs.

Prevention Costs

  • Prevention costs avoid poor quality in projects, deliverables, or service.
  • Prevention costs are associated with design, implementation, and maintenance of the quality management system and incurred before operations.
  • Types of prevention costs are product or service requirements: Establishment of requirements: specifications for incoming materials, processes, finished products and services.
  • Creation of plans for quality, reliability, operations, production, and inspection are Quality planning.
  • Quality assurance provides Creation and maintenance of the quality system
  • Training provides Development, preparation, and maintenance of programs
  • Prevention Costs are mostly man-hours.
  • Time planning is needed to be prepared for any required project.

Appraisal Costs

  • Appraisal Costs evaluates, measures, audits, and tests projects, deliverables, or services.
  • Measuring and monitoring activities related to quality are appraisal costs.
  • Verification is to check incoming material, process setup, and products against specifications
  • To check the quality system is functioning correctly involves conducting quality audits.
  • Supplier rating is to assess and approval of suppliers of products and services and the many Testing that are actual tests.
  • Costs include man-hours, testing equipment, and materials.

Internal Failure Costs

  • Repairing defects discovered before the product or service is delivered to the customer.
  • There is Waste by performing unnecessary work, holding of stock as a result of errors, poor organization, or communication.
  • There is Scraping for defective product or material that cannot be repaired, used, or sold.
  • Rework or rectification needs the Correction of defective material or errors needs Failure analysis to correct for internally caused product or service failure.

External Failure Costs

  • These are incurred to remedy defects discovered by customers after transfer.
  • There is Repair and servicing of both returned products and those in the field.
  • Also warranty claims of failed products replaced or services re performed under a guarantee.
  • Dealing directly with Complaints includes all handling work and costs and servicing customers.
  • There may be returns and handling investigation of rejected and or recalled products as well as transport costs.

Cost of Quality (COQ) Assignment

  • Complete the Cost of Quality Assignment by following provided instructions on Nexus.

Total Quality Management

  • Customer-focused: Quality is ultimately determined by those who are buying the good.
  • Total employee involvement: Everyone should be buying into the value.
  • Process-centered: Focus on process thinking.
  • Integrated system: Considers the entire ecosystem.
  • Strategic and systematic approach: Manage the method through this lens
  • Continual improvement: Everything gets better over time.
  • Fact-based decision making: Data to back up choices.
  • Communications: Effective communications keeps morale high.

Manage Quality Defined

  • Manage Quality translates the quality management plan into executable activities, incorporating organizational policies.

Tools and Techniques for Managing Quality

  • Data gathering via checklists.
  • Data analysis using alternatives, document, process, root cause, and multicriteria decision analysis.
  • Data representation is constructed using affinity diagrams, cause and effect diagrams, flowcharts, histograms, matrix diagrams.
  • Audits will provide and Design for X will give quality improvements.

Outputs of Managing Quality

  • Quality reports and test documents are produced.
  • Test and evaluation documents are produced.
  • Also created are change requests.
  • Quality management, scope, schedule, and cost baselines are all components of managing this process and are updated.
  • Project Document updates are Issue logs, lessons learned registrars.
  • Also the Risk registrar.

Design for X (DfX)

  • DfX uses technical guidelines applied during product design to optimize specific aspects.
  • DfX can control or improves a product's final characteristics.
  • Examples include: Manufacturing, Assembly, Maintenance, Cost, Logistics, Safety, Quality, Sustainability, Supply Chain and Testing.

Discussion Points for Managing Quality

  • Determining when it is not OKAY to have a Quality Mangement Plan.

Quality Management

  • Determine why it may not be necessary during implementing quliaty in a project.

Quality Reports

  • Purpose: Update key stakeholders on the progress of Quality.
  • Audience: Reports should be for the specific audience it will be distributed to and to the Client, PM, and Quality Teams.
  • Timeline: Reports needs to be provided in timely intervals, set in the Plan Quality Management stated in QMP. For example. A 2-year project needs monthly reports, shorter ones need daily.
  • Content: Reports can be graphical, numerical, or qualitative, for other processes/departments to take corrective actions.
  • Information includes quality management issues, recommendations for process, project, and product improvements.
  • There should be corrective actions recommendations (rework, defect/bugs repair, 100% inspection and more) and the summary of findings from the Control Quality process.

A QC Report

  • Will entail: Monthly Report – February 2021 with a Table of Contents
  • Including the Introduction, the Data Set, Chart/Graph, Analysis and Recommendation/Conclusion.
  • Also include NCR's

The Basic Quality Tools

  • Seven fundamental tools for quality control include: Cause and Effect Diagram, Check Sheet, Control Chart, Histogram, Pareto Chart, Scatter Diagram, and Stratification.

Cause-and-Effect Diagram Tools

  • These are also called Fishbone Diagram and Ishikawa Diagram.
  • It has methods, Equipment (machines), manpower, Materials and Measurement.

A Check Sheet

  • This is a list of items that are described within the QMP and used to collect data.
  • It needs to be used where the same person is doing the data collection and the observation can be collected repeatedly.
  • Can be used for problem reporting and frequency.
  • Can be used when collecting data from a production process.

A Control Chart

  • This graph is used to study how a process changes over time and to determine the stability of a process.
  • The Average, Upper and Lower limit is what is tracked.
  • Implement when controlling ongoing processes by finding and correcting problems as they occur/
  • Use to predict the expected range of outcomes from a process/
  • Use to determine whether a process is stable (in statistical control)/
  • Use it to analyze patterns from routine or non routine events from standard or built in process.
  • Use it to determines if your quality improvement projects should prevent or seek systemic process changes.

Histogram

  • Frequency distribution shows the values within a data set.
  • Use when the data are numerical and the distribution shape is important.
  • Use when its critical if customer requirements are being met and showing if a process is working correctly.
  • This is used during communicating with others what is happening.

Pareto Chart

  • Bar graph indicating frequency and cost.
  • Useful for determining critical factors and communicating.

Scatter Diagrams

  • Graphs data pairs, like dependent and independent variable on X and Y axis.
  • Used to identify root causes

Stratification

  • sorting data into distinct groups
  • Useful when data are from shift worker and from different suppliers.

Control Quality

  • Lecture 4 discusses Control Quality as well as Lecture 5 looks back.

Control Quality Defined

  • It monitors the process of executing the quality management to assess performance.
  • The data is then used to make sure its complete and correctly meets the customer expectations.

How to Control For Quality

  • A project needs a Project Management Plan, Quality Management Plan, and Project Documents.
  • It will need to analyze Lessons learned registrar and Quality Metrics. Also use tests.
  • Must approve change requests to ensure correctness by tracking work performance data, using good technology and Organizational process assets.

What is Needed to Manage Control Quality

  • Data gathering happens with: checklists, check sheets, statistical sampling, questionnaires and surveys.
  • Then analyze the Performance Reviews, root cause analysis, and apply to an Inspection.
  • The inspection will provide the ability to Test and provide product evaluations.
  • Show representation by designing Cause-and-effect diagrams, use Control charts, and Histograms.
  • Use Scatter diagrams for tracking and communicate to make meetings.

Controlling Outputs

  • Apply Quality Control Measurements and Verified deliverables.
  • Maintain excellent work performance information and apply that to requested changes. - The updated processes will lead to Project management plan updates. The Plan will need a Quality Management change, and all changed documents.
  • These changes will also effect issue logs, learned registrars and updated Tests and evaluations documents.

Checklists Info

  • Needs table with items and #s to provide Requirements with Standard Paramters.
  • Has to have a checkbox for sign off by Quality assurance and Supervisor.
  • There should be space to add comments and remarks.

People Must Sign Off

  • Must have someone acknowledge they know an item being inspected and what the inspection is related to.

People In A Team

  • People can be valued for experience or learning but the value depends on the product. Some things knowledge will outweight experience and vice versa.

Non-Conformance Discussion

  • A non-conformance is not a failure to complete a requirement. It can be something like a customer request, or a regulatory body. When there is a failure, someone needs to correct it to by handling the circumstances.
  • The Non-conformance issue is documented and record for reporting.

Info in Non-Conformance Reports

  • The project provides Information (Name, number).
  • The location that had the report. What standard had the deviation?
  • Who is responsible?
  • What is the proposed disposition?
  • What kind of action (with signer).
  • What is the preventative action for a different sign off?
  • What if follow up is needed

More Info

  • Actions will depend on the case.
  • Redo could get rid of object.
  • Leave as is for small issues, alter design or engineer.

Preventing Deviation

  • Preventive action should be implemented.
  • Preventative actions may need time.

What to Inspect?

  • Inspect the Ishikawa Diagram.

Quality Discussion

  • Show a movie of monster garage. Then see the work with project management. What kind of testing should happen and how should the project work?

Quality Ego

  • What kind of testing and if it works depend on what is inspected.

Six Sigma

  • Improves capability, reduces variation and improves processes.

Six Sigma Techniques

  • Six S is a framework technique. They can be in Manufacturing, industrial and information sections.
    • Can't be used for construction but can be for process.

Defining Six Sigma

  • DMAIC improves an existing business process. It defines the project with goals.
  • Has measures.
  • Analyzes investigate factors of what factors came.
  • Improve is doing things better, setting up failsafes and process capability.
  • Control the future.

What to Do

  • Identify a customer or design, then analyze design by setting up runs.

Lean

  • Lean looks at waste while 6 is for reduction.
  • To be safe you need Six Sigma and belt training.
  • Heavy in statistics.

Questions

  • Should people be able to test themselves. Is is good.

Close Out

  • Ask them what closeout is and if they can think of example.

Considerations

  • Present to customers.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

More Like This

Use Quizgecko on...
Browser
Browser