Which devices are considered energy isolating devices?

  • Valves
  • Blinds
  • Blanks
  • All of the above (correct)
  • What is the purpose of a lockout in equipment maintenance?

  • To remove parts from the equipment
  • To release stored energy
  • To energize the equipment
  • To prevent interference with the equipment (correct)
  • What must be done before work begins on equipment?

  • De-energize all energy sources (correct)
  • Force the valve to move
  • Remove parts from the equipment
  • Install locks and chains
  • Which workers are typically assigned to repair a single piece of equipment?

    <p>Electricians, power engineers, and mechanics</p> Signup and view all the answers

    What is the purpose of a group lockout?

    <p>To protect all workers who are required to work on locked out equipment</p> Signup and view all the answers

    What is a complex group lockout?

    <p>A situation where there can be more than one group lockout in place at the same time</p> Signup and view all the answers

    Which type of lockout is performed by one or two trained individuals using a set of lockbox locks?

    <p>Group lockout</p> Signup and view all the answers

    What is the purpose of a car seal in lockout procedures?

    <p>To provide a unique number for identification</p> Signup and view all the answers

    What is the main use of personal locks in lockout procedures?

    <p>To secure equipment that only one person will be working on</p> Signup and view all the answers

    Which color of locks is designated for maintenance crews?

    <p>Black</p> Signup and view all the answers

    What is the purpose of a lockout sheet?

    <p>To list all isolation points where a lockbox lock has been applied</p> Signup and view all the answers

    What is the purpose of a bump test at a motor control center (MCC)?

    <p>To prove that the motor will not start accidentally</p> Signup and view all the answers

    What must be recorded on the lockout sheet after completing work?

    <p>The isolation points that have been restored to normal operating positions</p> Signup and view all the answers

    What must be done before accessing the master keys of the group locks?

    <p>Break the car seal off</p> Signup and view all the answers

    Who is responsible for verifying that all locks have been removed?

    <p>The supervisor or designate</p> Signup and view all the answers

    Which type of lockout is performed by an individual and involves locking out equipment that only they will be working on?

    <p>Personal lockout</p> Signup and view all the answers

    What is the purpose of a car seal in lockout procedures?

    <p>To secure equipment that others will be working on</p> Signup and view all the answers

    What is the main use of a lockbox lockout in lockout procedures?

    <p>To secure equipment that others will be working on</p> Signup and view all the answers

    Which workers are typically involved in a group lockout?

    <p>Electricians, power engineers, and mechanics</p> Signup and view all the answers

    Who are the two trained operators responsible for performing a group lockout?

    <p>Lock installer and verifier</p> Signup and view all the answers

    What is the purpose of a lockbox in a group lockout?

    <p>To store the master key and unused locks from the lock sets</p> Signup and view all the answers

    Which of the following is NOT considered an energy isolating device in lockout procedures?

    <p>Gloves</p> Signup and view all the answers

    What is the purpose of installing locks and chains on energy sources before work begins?

    <p>To prevent equipment from being operated or interfered with</p> Signup and view all the answers

    In lockout procedures, what must be done to provide a level of protection equal to or greater than that achieved by locking and tagging?

    <p>De-energizing all energy sources</p> Signup and view all the answers

    Which color of locks is designated for commissioning and start-up?

    <p>Silver</p> Signup and view all the answers

    What is the purpose of the car seal used in lockout procedures?

    <p>To access the master keys of the group locks</p> Signup and view all the answers

    What information must be recorded on the lockout sheet after completing work?

    <p>The status change of equipment</p> Signup and view all the answers

    What is the purpose of a bump test at a motor control centre (MCC)?

    <p>To ensure that the motor will not start accidentally</p> Signup and view all the answers

    Who is responsible for verifying that all locks have been removed?

    <p>The supervisor or designate</p> Signup and view all the answers

    What must be done before accessing the master keys of the group locks?

    <p>Break the car seal</p> Signup and view all the answers

    Which of the following is true about group lockouts?

    <p>The master key opens all the locks in the set</p> Signup and view all the answers

    Which workers are responsible for performing a group lockout?

    <p>Lock installers and verifiers</p> Signup and view all the answers

    During a complex group lockout, what should workers do with their personal locks?

    <p>Remove them from the lockbox</p> Signup and view all the answers

    What is the purpose of a personal lockout in equipment maintenance?

    <p>To secure equipment that only one person will be working on</p> Signup and view all the answers

    What is the main use of personal locks in lockout procedures?

    <p>To identify the owner of a lock</p> Signup and view all the answers

    What is the purpose of a car seal in lockout procedures?

    <p>To provide a level of protection equal to or greater than locking and tagging</p> Signup and view all the answers

    Which of the following is NOT considered an energy isolating device in lockout procedures?

    <p>Pumps</p> Signup and view all the answers

    What is the purpose of a bump test at a motor control center (MCC)?

    <p>To verify proper operation of the equipment</p> Signup and view all the answers

    What must be done before accessing the master keys of the group locks?

    <p>Verify that all locks have been removed</p> Signup and view all the answers

    Which color of locks is designated for operations in lockout procedures?

    <p>Yellow</p> Signup and view all the answers

    What is the purpose of a lockout sheet in lockout procedures?

    <p>To record all isolation points where a lockbox lock has been applied</p> Signup and view all the answers

    What must be done before accessing the master keys of the group locks in lockout procedures?

    <p>Break the car seal off</p> Signup and view all the answers

    What is the purpose of a bump test at a motor control center (MCC) in lockout procedures?

    <p>To prove that the motor will not start accidentally</p> Signup and view all the answers

    Who is responsible for removing personal locks from the lockbox after completing work in lockout procedures?

    <p>All involved workers</p> Signup and view all the answers

    What must be done to provide a level of protection equal to or greater than that achieved by locking and tagging in lockout procedures?

    <p>Install locks and chains on energy sources before work begins</p> Signup and view all the answers