What is the primary purpose of a reactor control system in an electrical power distribution system?
What is the primary purpose of a reactor control system in an electrical power distribution system?
Which of the following is NOT a type of on-load tap-changer (OLTC) mentioned in the content?
Which of the following is NOT a type of on-load tap-changer (OLTC) mentioned in the content?
What is the purpose of a non-bridging position in an OLTC?
What is the purpose of a non-bridging position in an OLTC?
How often should the door gasket of an OLTC be replaced based on the information provided?
How often should the door gasket of an OLTC be replaced based on the information provided?
Signup and view all the answers
What is the most likely reason for replacing the Geneva gear and helical gear in an OLTC with a helical gear with a 10 mm roller pin?
What is the most likely reason for replacing the Geneva gear and helical gear in an OLTC with a helical gear with a 10 mm roller pin?
Signup and view all the answers
What is the significance of the number of tap change operations performed in the maintenance of an OLTC?
What is the significance of the number of tap change operations performed in the maintenance of an OLTC?
Signup and view all the answers
Which of the following is a possible benefit of using an OLTC in an electrical power distribution system?
Which of the following is a possible benefit of using an OLTC in an electrical power distribution system?
Signup and view all the answers
Which of the following companies is NOT listed as a performer of OLTC retrofits?
Which of the following companies is NOT listed as a performer of OLTC retrofits?
Signup and view all the answers
What should be done first before disconnecting the wires from the current transformer (CT)?
What should be done first before disconnecting the wires from the current transformer (CT)?
Signup and view all the answers
Which of the following tools is required to remove the nuts and bolts from the assemblies?
Which of the following tools is required to remove the nuts and bolts from the assemblies?
Signup and view all the answers
What is the purpose of using the old fiber optic cable during installation of the new cable?
What is the purpose of using the old fiber optic cable during installation of the new cable?
Signup and view all the answers
When securing the fiber optic cable and CT lead, which tool is specified for tightening the clamp?
When securing the fiber optic cable and CT lead, which tool is specified for tightening the clamp?
Signup and view all the answers
What is the last step mentioned for connecting the current injection tester to the CT?
What is the last step mentioned for connecting the current injection tester to the CT?
Signup and view all the answers
What safety measure should be taken before pulling the new fiber optic cable through the conduit?
What safety measure should be taken before pulling the new fiber optic cable through the conduit?
Signup and view all the answers
Which colors correspond to the wires that need to be reconnected after the installation?
Which colors correspond to the wires that need to be reconnected after the installation?
Signup and view all the answers
How should the fiber optic cable be secured to ensure it remains in place?
How should the fiber optic cable be secured to ensure it remains in place?
Signup and view all the answers
In the context of the provided content, what is the primary function of the "variable CT" connected to bus bar P2 and the stationary contact (A) of the V.I. (vacuum interrupter) during the operational tripping test?
In the context of the provided content, what is the primary function of the "variable CT" connected to bus bar P2 and the stationary contact (A) of the V.I. (vacuum interrupter) during the operational tripping test?
Signup and view all the answers
When referring to a "VIM system", as mentioned in the provided content, what does "VIM" most likely stand for in the context of power systems?
When referring to a "VIM system", as mentioned in the provided content, what does "VIM" most likely stand for in the context of power systems?
Signup and view all the answers
Based on the content provided, what is the significance of bringing the "VIM system" into "maintenance mode" before performing LTC operations with the transformer deenergized?
Based on the content provided, what is the significance of bringing the "VIM system" into "maintenance mode" before performing LTC operations with the transformer deenergized?
Signup and view all the answers
When the text states to "check fiber optic cables for possible damage", which aspect of the monitoring system is being assessed, and why is it important?
When the text states to "check fiber optic cables for possible damage", which aspect of the monitoring system is being assessed, and why is it important?
Signup and view all the answers
The content mentions "ring-out copper conduits to ground". Which component's function is being assessed during this procedure, and what is the primary objective of this assessment?
The content mentions "ring-out copper conduits to ground". Which component's function is being assessed during this procedure, and what is the primary objective of this assessment?
Signup and view all the answers
In the context of the provided content, what is the main purpose of the "hi-pot test" performed on the vacuum interrupter?
In the context of the provided content, what is the main purpose of the "hi-pot test" performed on the vacuum interrupter?
Signup and view all the answers
What is the main purpose of the "non-bridging position" mentioned in the text, and why is it important?
What is the main purpose of the "non-bridging position" mentioned in the text, and why is it important?
Signup and view all the answers
What is the significance of the "flexible connector" at P3 being removed before performing the hi-pot test on the vacuum interrupter?
What is the significance of the "flexible connector" at P3 being removed before performing the hi-pot test on the vacuum interrupter?
Signup and view all the answers
Study Notes
Wire Tie Pullers and Current Injection Tester Procedures
- Remove all nuts and washers from the LTC door for future use.
- Disconnect Orange, Blue, and Green wires from Current Transformer (CT).
- Loosen the CT clamp using an 8mm wrench and 10mm wrenches for nuts and bolts.
Assembly and Cable Handling
- Record the number or location of each wire before disconnection.
- Disconnect Black, White, and Brown wires from the junction plate using appropriate screwdrivers.
- Use existing fiber optic cable to pull new cable through the conduit, ensuring a hook is formed from wires and gently taped.
- Reconnect the fiber optic cable to the junction plate at the correct terminal.
Securing and Reconnecting Components
- Secure fiber optic cable with wire ties and rubber pads on both sides of P2 and P3.
- Secure CT lead and fiber optic cable with clamps using 10mm wrenches.
- Route the fiber optic cable through the clamp and secure with 8mm wrenches.
- Reconnect Orange, Blue, and Green wires after securing all components.
Current Injection Tester Setup
- Connect leads from the current injection tester to the CT, placing one lead on top and one on the bottom.
- Connect the tester to a 110v AC power source.
Maintenance and Retrofit Procedures
- Identified entities for retrofit maintenance include Siemens, GE, Allis, Federal Pacific, and several others.
- Various transformer types are involved such as Westinghouse (URT, UTT), GE (LRT), and others.
On-Load Tap-Changer (OLTC) Maintenance
- Replacement intervals for OLTC components depend on the number of operations performed; no time-based criteria exist.
- Specific components like door gaskets, silica gel, and front plates must be replaced after specified operations, while Geneva gear requires a helical gear change at the next maintenance.
Vacuum Interrupter Testing Procedure
- Insulating panel must be placed between the vacuum interrupter and support before testing.
- Apply hi-pot test voltage of 25 kV AC or 30 kV DC for one minute for each vacuum interrupter.
- Reconnect bus bars and fiber optic cable after testing.
Monitoring System Tests
- Check fiber optic cables for damage and ensure conduits are secure in support clamps.
- Verify operational status of the monitoring system by checking for illuminated LED indicators.
Operational Tripping Tests
- Perform tests to ensure the monitoring system operates correctly by raising CT to produce 15 to 20A and activating the motor drive mechanism.
- Enter “maintenance mode” for the VIM system before performing LTC operations while the transformer is de-energized. This is done by pressing the red button for 5-6 seconds until LEDs flash.