timetable that specifies what is
to be made and when
timetable that specifies what is to be made and when
a time-phased stock
replenishment plan for all levels of a distribution network
a time-phased stock replenishment plan for all levels of a distribution network
supply chain management
systems in the grocery industry that tie sales to buying, to inventory,
to logistics, and to production
supply chain management systems in the grocery industry that tie sales to buying, to inventory, to logistics, and to production
a listing of the components, their description,
and the quantity of each required to make one unit of a product
a listing of the components, their description, and the quantity of each required to make one unit of a product
Signup and view all the answers
a dependent demand
technique that uses a bill-of-material, inventory, expected receipts,
and a master production schedule to determine material
requirements
a dependent demand technique that uses a bill-of-material, inventory, expected receipts, and a master production schedule to determine material requirements
Signup and view all the answers
BOM for components; usually usually
subassemblies, that exist only temporarily; never inventoried
BOM for components; usually usually subassemblies, that exist only temporarily; never inventoried
Signup and view all the answers
a lot-sizing technique that issues
orders on a predetermined time interval with an order quantity equal
to all of the interval’s requirements
a lot-sizing technique that issues orders on a predetermined time interval with an order quantity equal to all of the interval’s requirements
Signup and view all the answers
In keeping with the definition of closed-loop
MRP, feedback about workload is obtained from each work center.
In keeping with the definition of closed-loop MRP, feedback about workload is obtained from each work center.
Signup and view all the answers
material groupings created in order to assign an
artificial parent to a BOM, also called “pseudo bills
material groupings created in order to assign an artificial parent to a BOM, also called “pseudo bills