Firefighter High-Rise Operations Quiz
23 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary responsibility of the Driver Engineer?

  • Check with command for assignment
  • Report to the Incident Commander for tool assignments
  • Assemble assigned equipment and proceed with the crew to the fire floor (correct)
  • Position apparatus on the scene to block incoming units

What is included in the tool assignments for the Firefighter?

  • A 75-foot pack of 2 ½” hose and a high-rise equipment bag
  • A water can, a set of irons, and a high-rise equipment bag
  • A TIC, a set of irons, and elevator keys
  • A 75-foot pack of 2 ½” hose with a 1 1/8" tip smooth bore nozzle and elevator keys (correct)

What should the crew do upon reaching the building with High-Rise equipment and flashlights?

  • Split up and proceed to different areas of the building
  • Remain together and report to IC by radio or face to face for assignment (correct)
  • Immediately go to the fire floor
  • Report to IC by radio or face to face for assignment

What is the expected action of the Captain upon reaching the floor below the fire floor?

<p>Direct crew to the floor above the fire floor (A)</p> Signup and view all the answers

What should the Driver Engineer do upon reaching the floor below the fire floor?

<p>Determine which connection will be utilized for the back-up line (D)</p> Signup and view all the answers

What should the Captain do with the assigned tools?

<p>Take them to assist with stretching a back-up line (D)</p> Signup and view all the answers

What should the entire crew do when reporting to IC by radio or face to face for assignment?

<p>Remain together as a crew (B)</p> Signup and view all the answers

What is NOT included in the tool assignments for the Driver Engineer?

<p>&quot;75-foot pack of 1 3/4” hose&quot; (D)</p> Signup and view all the answers

What is the responsibility of the entire crew when reporting to IC by radio or face to face for assignment?

<p>Stay together and be in full turn out gear. (D)</p> Signup and view all the answers

What should the Firefighter do upon reaching the floor below the fire floor?

<p>Don PPE and assemble assigned equipment. (B)</p> Signup and view all the answers

What tools are included in the Firefighter's tool assignments?

<p>75-foot pack of 2 ½” hose with a 1 1/8&quot; tip smooth bore nozzle and a set of irons. (A)</p> Signup and view all the answers

What is NOT included in the tools assignments for the Captain?

<p>High-rise equipment bag (D)</p> Signup and view all the answers

What should the Driver Engineer do upon reaching the floor below the fire floor?

<p>Determine which connection will be utilized for the back-up line. (A)</p> Signup and view all the answers

What is NOT a responsibility of the Captain?

<p>Don PPE and assemble assigned equipment. (D)</p> Signup and view all the answers

What should the entire crew do when positioning apparatus on scene?

<p>Remain together and be in full turn out gear. (C)</p> Signup and view all the answers

What is the expected action of the crew upon reaching the building with High-Rise equipment and flashlights?

<p>Report their arrival to dispatch and IC (C)</p> Signup and view all the answers

What is NOT included in the Firefighter's tool assignments?

<p>Elevator keys (C)</p> Signup and view all the answers

What is NOT a responsibility of the Driver Engineer?

<p>Direct crew to the floor below the fire floor (A)</p> Signup and view all the answers

What should the entire crew do when reporting to IC by radio or face to face for assignment?

<p>Be in full turn out gear (D)</p> Signup and view all the answers

What should the Captain do with the assigned tools?

<p>Hand them over to the Driver Engineer (C)</p> Signup and view all the answers

What should the Driver Engineer do upon reaching the floor below the fire floor?

<p>Determine which connection will be utilized for the back-up line (A)</p> Signup and view all the answers

What is included in the tool assignments for the Captain?

<p>&quot;High-rise equipment bag&quot;, TIC, and elevator keys (B)</p> Signup and view all the answers

What is NOT included in the tool assignments for the Driver Engineer?

<p>&quot;High-rise equipment bag&quot; (D)</p> Signup and view all the answers

More Like This

SOG 314 High-Rise Fires
31 questions
SOG 314 High Rise
37 questions

SOG 314 High Rise

FunnyCaricature avatar
FunnyCaricature
High Rise Operations Procedures Quiz
72 questions

High Rise Operations Procedures Quiz

EloquentBarbizonSchool6575 avatar
EloquentBarbizonSchool6575
Use Quizgecko on...
Browser
Browser