🎧 New: AI-Generated Podcasts Turn your study notes into engaging audio conversations. Learn more

SOG 314 High Rise
37 Questions
6 Views

SOG 314 High Rise

Created by
@FunnyCaricature

Podcast Beta

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the purpose of the document mentioned in the text?

  • To list the contact details for building personnel
  • To discuss the history of high-rise incidents
  • To outline procedures for responding to high-rise fires (correct)
  • To provide definitions of high-rise firefighting equipment
  • At what level is the Operational Staging set in high-rise incidents?

  • Two floors above the fire floor
  • On the same floor as the fire
  • On the ground floor only
  • Two floors below the fire floor (correct)
  • What items are included in the High Rise Kit mentioned in the text?

  • 250 feet of 2.5 inch hose, 90 degree elbow, pressure gauge
  • 50 feet of 3 inch hose, fog nozzle, spanner wrench, door chocks
  • 200 feet of 2 inch hose, 1 1/8" smooth bore breakaway nozzle, 2 1/2" in-line gate valve (correct)
  • 100 feet of 1.5 inch hose, adjustable nozzle, 2 inch gate valve
  • What action should be taken by the first arriving unit according to the text?

    <p>Contact Dispatch and provide scene information</p> Signup and view all the answers

    What should the 360 assessment include in a high-rise fire situation?

    <p>Identification of the fire floor or division</p> Signup and view all the answers

    What is the recommended minimum number of firefighters for conducting a fire attack?

    <p>4 firefighters</p> Signup and view all the answers

    What is the responsibility of the first due aerial during a working fire?

    <p>Positioning for ladder deployment and engaging in aerial operations</p> Signup and view all the answers

    What is the role of the third due Engine Company during a high-rise fire?

    <p>Establish Rapid Intervention Crew (RIC) and stage one floor below the fire</p> Signup and view all the answers

    What should later arriving units do unless directed otherwise by the IC?

    <p>Respond to base to await assignments</p> Signup and view all the answers

    Who should establish triage/treatment area during a high-rise fire?

    <p>Third due Rescue Company</p> Signup and view all the answers

    What is the responsibility of the second due engine during a working fire?

    <p>Establishing a water supply for firefighting operations</p> Signup and view all the answers

    What resources will be called upon confirmation of a working fire?

    <p>[Page On-Call Fire Inspector], [Community Emergency Response Team], [Support Services Utilities]</p> Signup and view all the answers

    'Driver-Engineer shall remain with the unit' is associated with which activity during a high-rise fire?

    <p>[Fire attack]</p> Signup and view all the answers

    What is one key function of the Safety Officer during a high-rise fire?

    <p>Confirm Rapid Intervention Crew (RIC) placement</p> Signup and view all the answers

    What does 'the Company Officer' means in the context of Knox box keys?

    <p>First Due Engine Company Officer</p> Signup and view all the answers

    What should the second due rescue be responsible for during a working fire?

    <p>Establishing a back up line and bringing tools and equipment</p> Signup and view all the answers

    What is the recommended practice for attacking a fire above the seventh floor?

    <p>Use the elevators with caution</p> Signup and view all the answers

    What is the responsibility of the Rescue Company Officer during high-rise firefighting operations?

    <p>Assist with hose advancement</p> Signup and view all the answers

    What should Lobby Control personnel be assigned to do during a high-rise incident?

    <p>Control access to the lobby and elevators</p> Signup and view all the answers

    Where should operational staging be established during a high-rise incident?

    <p>Two floors below the fire floor</p> Signup and view all the answers

    Which tool is NOT listed as part of the tools and resources recommended for high-rise firefighting operations?

    <p>Chainsaw</p> Signup and view all the answers

    In what circumstance should elevators be used cautiously during high-rise firefighting operations?

    <p>When the lowest floor reporting fire or smoke is above seven stories</p> Signup and view all the answers

    What is the role of Lobby Control personnel in a high-rise firefighting incident?

    <p>Control access to the lobby and elevators</p> Signup and view all the answers

    Which action should be taken by Operational Staging personnel during a high-rise incident?

    <p>Record arrival and departure of members</p> Signup and view all the answers

    What is one specific responsibility of Base area personnel during a high-rise incident?

    <p>Consider pressurizing stairwells</p> Signup and view all the answers

    Who should verify the operations and details of fire pump, standpipe systems, and sprinkler systems in a high-rise firefighting incident?

    <p>Lobby Control personnel</p> Signup and view all the answers

    What does Lobby Control serve as in a high-rise firefighting incident?

    <p>Point-of-entry control &amp; accountability</p> Signup and view all the answers

    What specific tool should Driver-Engineer have during high-rise firefighting operations?

    <p>High rise bag</p> Signup and view all the answers

    What is the responsibility of the Base assignment in a high-rise incident?

    <p>Assembling and deploying resources as requested by the IC</p> Signup and view all the answers

    What is the primary purpose of establishing Rehab/Medical two floors below the fire or smoke affected area?

    <p>Providing medical assistance and rehabilitation to personnel</p> Signup and view all the answers

    What is the minimum pump discharge pressure required for standpipe considerations?

    <p>150 psi</p> Signup and view all the answers

    In a high-rise incident, what task is assigned to the Lobby Control unit?

    <p>Controlling access to and from the building</p> Signup and view all the answers

    Why should all building FDC's be pumped accordingly in a high-rise incident?

    <p>To achieve maximum usable fire flow from a standpipe</p> Signup and view all the answers

    What is the critical consideration when determining fire flow requirements in a high-rise incident?

    <p>Length of hose and size</p> Signup and view all the answers

    What is the role of Rapid Intervention Crew in a high-rise incident?

    <p>Positioning before entering IDLH environments</p> Signup and view all the answers

    What should be done before conducting post-fire investigations according to the text?

    <p>Monitoring with a 4 gas multi-meter</p> Signup and view all the answers

    Which unit should coordinate adequate self-contained breathing apparatus (SCBA) supply and refill capabilities?

    <p>Fire Attack and Suppression unit</p> Signup and view all the answers

    Study Notes

    High-Rise Firefighting Operations

    • The primary purpose of the document is to outline operational guidelines for high-rise firefighting incidents.

    Operational Staging

    • Operational Staging is set at the lobby level during high-rise incidents.

    High Rise Kit

    • The High Rise Kit includes a Knox box key, a hose adapter, and a FDC adapter.

    First Arriving Unit

    • The first arriving unit should conduct a 360 assessment and initiate a size-up report.

    360 Assessment

    • The 360 assessment should include a report on the fire's location, size, and severity, as well as the number of occupants and any hazards present.

    Fire Attack

    • The recommended minimum number of firefighters for conducting a fire attack is 4-6 personnel.

    First Due Aerial

    • The responsibility of the first due aerial is to establish a water supply and initiate a master stream operation if necessary.

    Third Due Engine Company

    • The role of the third due Engine Company is to assist in securing a secondary water supply and providing additional personnel for the fire attack.

    Later Arriving Units

    • Later arriving units should stage at the designated staging area unless directed otherwise by the Incident Commander.

    Triage/Treatment Area

    • The Rescue Company Officer is responsible for establishing a triage/treatment area.

    Second Due Engine

    • The responsibility of the second due engine is to assist in securing a secondary water supply and providing additional personnel for the fire attack.

    Resources

    • Upon confirmation of a working fire, additional resources such as an additional engine company, truck company, and rescue company will be called.

    Driver-Engineer

    • The Driver-Engineer should remain with the unit to ensure it is properly positioned and supplied with water.

    Safety Officer

    • One key function of the Safety Officer is to monitor the fire ground and identify potential hazards.

    Company Officer

    • In the context of Knox box keys, the Company Officer is responsible for ensuring that access is gained quickly and safely.

    Second Due Rescue

    • The second due rescue is responsible for assisting in the rescue of occupants and providing medical assistance as needed.

    Fire Attack Above the Seventh Floor

    • When attacking a fire above the seventh floor, it is recommended to use a high-rise pack and operate in a defensive mode.

    Rescue Company Officer

    • The Rescue Company Officer is responsible for establishing a triage/treatment area and providing medical assistance as needed.

    Lobby Control

    • Lobby Control personnel are assigned to control access to the elevator and stairs, and to provide information to responders.

    Operational Staging

    • Operational Staging should be established at the lobby level.

    Tool Recommendation

    • The tool not listed as part of the recommended tools and resources for high-rise firefighting operations is a chainsaw.

    Elevator Use

    • Elevators should be used cautiously during high-rise firefighting operations, especially above the seventh floor.

    Lobby Control Role

    • Lobby Control personnel serve as a central point for communication and coordination during a high-rise firefighting incident.

    Operational Staging Personnel

    • Operational Staging personnel should establish a central point for communication and coordination during a high-rise firefighting incident.

    Base Area Personnel

    • Base area personnel are responsible for establishing a rehabilitation area and providing necessary resources.

    Verification of Systems

    • The Rescue Company Officer should verify the operations and details of fire pump, standpipe systems, and sprinkler systems.

    Lobby Control Function

    • Lobby Control serves as a central point for communication and coordination during a high-rise firefighting incident.

    Driver-Engineer Equipment

    • The Driver-Engineer should have a phone or radio during high-rise firefighting operations.

    Base Assignment

    • The Base assignment is responsible for establishing a rehabilitation area and providing necessary resources.

    Rehab/Medical Area

    • The primary purpose of establishing a Rehab/Medical area two floors below the fire or smoke-affected area is to provide a safe area for responders to rest and recover.

    Standpipe Considerations

    • The minimum pump discharge pressure required for standpipe considerations is 65 psi.

    Lobby Control Task

    • The task assigned to the Lobby Control unit is to control access to the elevator and stairs, and to provide information to responders.

    FDC Pumping

    • All building FDC's should be pumped accordingly in a high-rise incident to ensure adequate pressure.

    Fire Flow Requirements

    • The critical consideration when determining fire flow requirements in a high-rise incident is the height of the building and the fuel load.

    Rapid Intervention Crew

    • The role of the Rapid Intervention Crew is to rescue downed or trapped firefighters.

    Post-Fire Investigations

    • Before conducting post-fire investigations, all hazards should be mitigated, and the scene should be secured.

    SCBA Supply

    • The Rescue Company should coordinate adequate self-contained breathing apparatus (SCBA) supply and refill capabilities.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge on the guidelines for firefighting personnel, including the use of PPE, accountability tags, and instructions during fire emergencies.

    Use Quizgecko on...
    Browser
    Browser