Questions and Answers

What is the primary purpose of specifications in a construction project?

  • To define recorded requirements for materials and services. (correct)
  • To determine project timelines and schedules.
  • To illustrate final project designs.
  • To manage contractor bids and payments.

Which estimating method associates the contractor's bid with a specific set of quantified material requirements provided by the owner?

  • Unit price contracts (correct)
  • Cost-plus contracts
  • Design-build estimation
  • Lump sum estimation

What role does project scheduling play in construction management?

  • It specifies contractor payment terms.
  • It ensures compliance with zoning regulations.
  • It determines the types of materials used.
  • It assists in deploying resources effectively. (correct)

Which of the following is NOT typically considered a responsibility of the proxy during the construction stage?

<p>Making final project design decisions. (C)</p> Signup and view all the answers

Which of the following best describes the term 'project safety' in construction?

<p>Implementing protocols to protect individuals and assets. (C)</p> Signup and view all the answers

What type of materials are characterized as manufactured materials in construction?

<p>Concrete hollow blocks and plywood (B)</p> Signup and view all the answers

What is one major disadvantage of the lump sum contractual method?

<p>It requires precise estimation of all costs upfront. (A)</p> Signup and view all the answers

Which of the following best defines working drawings in construction?

<p>Detailed designs showcasing complex project elements. (C)</p> Signup and view all the answers

Flashcards

Project Planning

The process of initiating construction for improvements on land.

Specifications

A set of recorded requirements for materials, design, or services in a project.

Working Drawings

Documents created by engineers or architects showing project details.

Lump Sum

A total cost estimate provided by a contractor for a project.

Signup and view all the flashcards

Unit Price

A contract where the owner supplies quantities to the contractor for pricing.

Signup and view all the flashcards

Project Safety

Protocols to ensure the well-being of individuals and protect assets during a project.

Signup and view all the flashcards

Scheduling

The organization of resources like personnel and materials for a project.

Signup and view all the flashcards

Materials

Common and manufactured substances used in construction projects.

Signup and view all the flashcards

Study Notes

Project Planning

  • Construction begins when a person or organization decides to improve land, including residential, commercial, or renovation projects.

Specifications

  • Specifications define requirements for materials, designs, products, or services.
  • They must adhere to building codes, zoning regulations, and other relevant rules.
  • They're documented in detailed drawings and specifications.

Working Drawings

  • Drawings illustrate the complexity of a planned project.
  • Created by architects or engineers.

Lump Sum

  • Lump sum bids require contractors to estimate all project costs (materials, labor, equipment).
  • Often used for construction projects.
  • Contractors estimate the total cost to complete the project.

Unit Price

  • Unit price contracts require owners to provide quantity details to a contractor.
  • Contractors base bids on their estimates of material quantities.
  • This system accommodates quantity changes.

Project Safety

  • Safety measures are implemented throughout the project lifecycle.
  • Measures focus on individual well-being and asset protection.
  • Protocols ensure safety during planning, execution, and completion of projects.

Scheduling

  • Scheduling maximizes resource utilization (personnel, money, equipment, materials).
  • A schedule assists with cash flow analysis.
  • Scheduling accounts for the time value of money.

Materials

  • Commonly used materials include wood, asphalt, stone, sand, and manufactured items like concrete blocks, rebar, and plywood.

Suppliers/Vendors

  • Suppliers/vendors (manufacturers, quarries, sawmills) provide materials and/or finished products.

Construction Stage

  • A representative (often a designer or agent) acts on behalf of the owner.
  • Representatives approve or reject materials.
  • Representatives oversee the work's progress and execution.
  • Inspectors are present to ensure quality and compliance.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

More Like This

Construction Project Plans and Specifications
18 questions
Construction Project Management Fundamentals
10 questions
Construction Project Planning Quiz
32 questions
Use Quizgecko on...
Browser
Browser