Construction Project Plans and Specifications
18 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Match the following with their respective descriptions: Preliminary Cost

Expenses directly related to project running = Preliminaries Expenses incurred during construction = Mobilization/ Demobilization Costs calculated individually for each project = Temporary Facilities Expenses not included in materials, labor or overheads = Site Supervision

Match the following with their respective areas on the project site: OFFICE

100 SQ.M = OFFICE 175 SQ.M = CLIENT OFFICE 18 SQ.M = CLINIC 50 SQ.M = WAREHOUSE

Match the following with their respective activities: Testing and Commissioning

Permit and Taxes = Testing and Commissioning Bonds and Insurances = Safety and Security Shop Drawings & Submittals = Owner/PMT Services Safety and Security = Location of Inverted Canopy

Match the following with their respective components: TRUSS 4” DIA.G.I.PIPE COLUMN

<p>Safety and Security = TRUSS 4” DIA.G.I.PIPE COLUMN Site Utilization Plan = PROJECT SITE INGRESS/ EGRESS Temporary Enclosure = PROJECT SITE INGRESS/ EGRESS Traffic Enforcement = TEMPORARY ENCLOSURE</p> Signup and view all the answers

Match the following with their respective areas on the project site: TOOLROOM

<p>25 SQ.M = MOTOR POOL 80 SQ.M = LAYDOWN 50 SQ.M = WAREHOUSE</p> Signup and view all the answers

Match the following with their respective services: Bonds and Testing

<p>Expected material delivery schedule = Bonds and Testing Preliminary costs are expenses incurred during construction = Material Take-Off Terms of payments, validity of quote = Site Development Warranty guarantee period for services provided = Topographic Survey</p> Signup and view all the answers

Match the following with their descriptions: Topographic Survey

<p>Surface exploration and subsurface exploration of a site = A geotechnical investigation Generated by analysis of a blueprint or other design document = Material Take-Off List of materials with quantities and types required to build a structure = Material Take-Off Site-specific survey that maps the elevation of the land = Topographic Survey</p> Signup and view all the answers

Match the following components with their respective category: Foundations, Columns, Slabs, Beams

<p>Structural Works = Beams</p> Signup and view all the answers

Match the following activities with their descriptions: Clearing, Grubbing, Excavation, Backfilling and Compaction

<p>Civil Works = Backfilling and Compaction</p> Signup and view all the answers

Match the following with their respective content: Tanks, Structural Plans, Floor Plans, Wall Schedule

<p>Site Development = Tanks Bid Plans = Structural Plans Architectural Works = Wall Schedule</p> Signup and view all the answers

Match the following with their descriptions: General Notes, Excavation Plan, Wall Finishes, Thermal Protection

<p>General information or instructions regarding the project = General Notes Detailed plan showing excavation details = Excavation Plan Architectural Works finish for walls = Wall Finishes Protective measures against heat loss or gain in a structure = Thermal Protection</p> Signup and view all the answers

Match the following with their categories: Concrete Formworks, Reinforcing Bars, Windows, Miscellaneous Items

<p>Structural Works = Reinforcing Bars Architectural Works = Windows Material Take-Off = Miscellaneous Items</p> Signup and view all the answers

Match the following with the correct description:

<p>Bid Plans = Technical drawings that show what is to be built for the purpose of bidding Topographic Survey = Survey Report Tapping Point (Water &amp; Electricity) Geotechnical Investigation = Inspection of existing site condition to be able to incorporate in the preparation of Bid Material Take-Off = Matrix of Scope Material Compliance Manpower and Equipment Loadings</p> Signup and view all the answers

Match the following with the correct stage in the bidding process:

<p>Site Development = Temporary Facilities / Laydown Area Bid Plans = Pick Up of Plans and Specifications Topographic Survey = Last day of Query Answer to Query Material Take-Off = Construction Schedule</p> Signup and view all the answers

Match the following with their respective components in bid proposals:

<p>Bid Plans = Technical &amp; Commercial Qualifications Topographic Survey = Matrix of Scope Material Compliance Geotechnical Investigation = Manpower and Equipment Loadings Material Take-Off = Site Visit Inspection</p> Signup and view all the answers

Match the following with their relevance to site preparation:

<p>Bid Plans = Adjacent Structures Topographic Survey = Nearest Airport / Port Geotechnical Investigation = Green Field / Brown Field Material Take-Off = Number of Trees to ball-out or to cut</p> Signup and view all the answers

Match the following with their involvement in project estimation:

<p>Bid Plans = Conceptual Estimate Topographic Survey = Awarding of Project Geotechnical Investigation = Preliminary Estimate Material Take-Off = Total Cost</p> Signup and view all the answers

Match the following with their contribution to bid submission:

<p>Bid Plans = Design Phase Meeting with the Consultant Topographic Survey = Sourcing of Subcontractors Geotechnical Investigation = Submission of Bid Material Take-Off = Quotation Clarification Meeting</p> Signup and view all the answers