Match the following with their respective descriptions: Preliminary Cost
Match the following with their respective descriptions: Preliminary Cost
Expenses directly related to project running = Preliminaries Expenses incurred during construction = Mobilization/ Demobilization Costs calculated individually for each project = Temporary Facilities Expenses not included in materials, labor or overheads = Site Supervision
Match the following with their respective areas on the project site: OFFICE
Match the following with their respective areas on the project site: OFFICE
100 SQ.M = OFFICE 175 SQ.M = CLIENT OFFICE 18 SQ.M = CLINIC 50 SQ.M = WAREHOUSE
Match the following with their respective activities: Testing and Commissioning
Match the following with their respective activities: Testing and Commissioning
Permit and Taxes = Testing and Commissioning Bonds and Insurances = Safety and Security Shop Drawings & Submittals = Owner/PMT Services Safety and Security = Location of Inverted Canopy
Match the following with their respective components: TRUSS 4” DIA.G.I.PIPE COLUMN
Match the following with their respective components: TRUSS 4” DIA.G.I.PIPE COLUMN
Signup and view all the answers
Match the following with their respective areas on the project site: TOOLROOM
Match the following with their respective areas on the project site: TOOLROOM
Signup and view all the answers
Match the following with their respective services: Bonds and Testing
Match the following with their respective services: Bonds and Testing
Signup and view all the answers
Match the following with their descriptions: Topographic Survey
Match the following with their descriptions: Topographic Survey
Signup and view all the answers
Match the following components with their respective category: Foundations, Columns, Slabs, Beams
Match the following components with their respective category: Foundations, Columns, Slabs, Beams
Signup and view all the answers
Match the following activities with their descriptions: Clearing, Grubbing, Excavation, Backfilling and Compaction
Match the following activities with their descriptions: Clearing, Grubbing, Excavation, Backfilling and Compaction
Signup and view all the answers
Match the following with their respective content: Tanks, Structural Plans, Floor Plans, Wall Schedule
Match the following with their respective content: Tanks, Structural Plans, Floor Plans, Wall Schedule
Signup and view all the answers
Match the following with their descriptions: General Notes, Excavation Plan, Wall Finishes, Thermal Protection
Match the following with their descriptions: General Notes, Excavation Plan, Wall Finishes, Thermal Protection
Signup and view all the answers
Match the following with their categories: Concrete Formworks, Reinforcing Bars, Windows, Miscellaneous Items
Match the following with their categories: Concrete Formworks, Reinforcing Bars, Windows, Miscellaneous Items
Signup and view all the answers
Match the following with the correct description:
Match the following with the correct description:
Signup and view all the answers
Match the following with the correct stage in the bidding process:
Match the following with the correct stage in the bidding process:
Signup and view all the answers
Match the following with their respective components in bid proposals:
Match the following with their respective components in bid proposals:
Signup and view all the answers
Match the following with their relevance to site preparation:
Match the following with their relevance to site preparation:
Signup and view all the answers
Match the following with their involvement in project estimation:
Match the following with their involvement in project estimation:
Signup and view all the answers
Match the following with their contribution to bid submission:
Match the following with their contribution to bid submission: