Air Force Operations Flight Overview
233 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the main objective of the Operations Flight?

  • To effectively operate, maintain, and repair Air Force facility and infrastructure assets (correct)
  • To conduct annual audits of financial expenditures
  • To manage all Air Force personnel training programs
  • To develop new technologies for Air Force operations
  • Which of the following activities is NOT a responsibility of the Operations Flight?

  • Eliminating emergency conditions related to infrastructure
  • Providing oversight on service contracts
  • Conducting facility and infrastructure maintenance
  • Developing strategic military plans (correct)
  • What does the acronym CEOE stand for?

  • Construction and Engineering Operations Enterprise
  • Customer Service and Operations Efficiency (correct)
  • Civil Engineering Operations Endeavor
  • Combined Engineering Operations Excellence
  • How does the Operations Flight maximize mission accomplishment according to the provided content?

    <p>By using common reporting tools and risk-based perspectives</p> Signup and view all the answers

    What are the three sections that make up CEOE?

    <p>Requirements &amp; Optimization, Service Contracts, and Materiel Control</p> Signup and view all the answers

    What is the primary goal of CEOER within the Operations Flight?

    <p>To shift the focus towards proactive systems performance analysis</p> Signup and view all the answers

    Which of the following areas does the Operations Flight NOT actively work in?

    <p>Retail sales</p> Signup and view all the answers

    What does the acronym C-FTE stand for in the context of Operations Flight manpower management?

    <p>Craftsmen Full Time Equivalents</p> Signup and view all the answers

    What does the Availability Rate (AR) represent in the context of the Operations Flight?

    <p>The average percentage of work time available after various deductions</p> Signup and view all the answers

    How does the Operations Flight primarily support infrastructure asset lifecycle management?

    <p>Through data collection, analysis, and strategic maintenance management</p> Signup and view all the answers

    What is a key focus area of the Operations Engineering (CEOE) as part of the Operations Flight?

    <p>Key work management and materiel acquisition processes</p> Signup and view all the answers

    What is a major challenge faced by the Operations Flight due to resource constraints?

    <p>Inefficiency in maintenance and operations</p> Signup and view all the answers

    What does the Deployable Work Hour Balance help to determine for the Operations Flight?

    <p>The number of available work hours for craftspeople</p> Signup and view all the answers

    Which of the following best describes the importance of experience, depth, and leadership in the Operations Flight?

    <p>They contribute to the effectiveness of Operations Flight programs</p> Signup and view all the answers

    What is a limitation noted regarding the size of staff in achieving improvements in CEOE programs?

    <p>Size of staff is not directly related to performance success</p> Signup and view all the answers

    What is a planned future initiative related to Operations Flight performance?

    <p>To develop benchmarks, KPIs, and reports for performance measurement</p> Signup and view all the answers

    How much of the total cost of ownership can facility management comprise according to the International Facility Management Association?

    <p>60-80 percent</p> Signup and view all the answers

    What is a significant consideration for maintaining forward progress in CEOE programs?

    <p>Commitment to preserving progress despite staff reductions</p> Signup and view all the answers

    In what way should the time available for addressing requirements be evaluated?

    <p>In advance to effectively schedule work</p> Signup and view all the answers

    What is a critical aspect of understanding the labor hours available for the Operations Flight?

    <p>Gathering and validating emergent requirements</p> Signup and view all the answers

    What does increasing the Availability Rate (AR) directly impact?

    <p>Operational efficiency and cost management</p> Signup and view all the answers

    What percentage of total available hours is being lost if the AR is 65%?

    <p>35 hours</p> Signup and view all the answers

    What is emphasized in the work prioritization model used by Operations Flight?

    <p>Preventive Maintenance and Plant Operations</p> Signup and view all the answers

    What should be looked at to optimally manage requirements against the work capacity?

    <p>Monthly deployable hour balance</p> Signup and view all the answers

    What action should be taken for individuals non-validated on the Master FM list?

    <p>Request a replacement FM via memo.</p> Signup and view all the answers

    Which of the following is a basic question that civil engineers face?

    <p>Where is the best place to invest our time and money?</p> Signup and view all the answers

    What is necessary for individuals validated on the Master FM List?

    <p>Their training date should be updated.</p> Signup and view all the answers

    What can lead to an increase in indirect time for the Operations Flight?

    <p>Supervision for shop leadership</p> Signup and view all the answers

    What should be incorporated into the monthly schedule management?

    <p>Scheduled work and fixed bills like PM and PO</p> Signup and view all the answers

    Which of the following is a requirement for a facility program operating at a Matured Capability?

    <p>Establish minimum expectations.</p> Signup and view all the answers

    What role should the Operations Chief or Deputy play regarding vacant positions?

    <p>Articulate impacts of vacant positions</p> Signup and view all the answers

    How often should the CEOER standard report be validated?

    <p>Weekly.</p> Signup and view all the answers

    What is the goal of the Quality Assessment and Evaluation (QAE) function established by the Superintendent?

    <p>To validate shop and CEOER interactions.</p> Signup and view all the answers

    What is a common timeframe for average fill actions for positions?

    <p>3 months</p> Signup and view all the answers

    What is one deliverable that CEOE aims to improve?

    <p>Process and issues management for specific assets</p> Signup and view all the answers

    What should be confirmed regarding the Work Priority System?

    <p>2A and 2B work must be completed before 3B and 3C work.</p> Signup and view all the answers

    What is the impact of accepting all work without limits?

    <p>Creation of unsolvable backlogs</p> Signup and view all the answers

    What should be included in the U-Fix-It program?

    <p>A listing of over-the-counter materials.</p> Signup and view all the answers

    What should be scrutinized regarding indirect time in the Operations Flight?

    <p>All indirect time charged</p> Signup and view all the answers

    Which indicator reflects the performance of the Facility Management Program?

    <p>Meeting or exceeding established KPIs.</p> Signup and view all the answers

    What is a key action to be performed during the semi-annual review?

    <p>Verify risk matrix events have occurred on all assets.</p> Signup and view all the answers

    How should non-emergency service requests (SRs) be recorded?

    <p>By being placed into TRIRIGA by an FM or craftsman.</p> Signup and view all the answers

    What must be ensured in relation to completed work tasks (WT)?

    <p>All required close-out actions must be performed before closing.</p> Signup and view all the answers

    What occurs if the work tasks are missed?

    <p>Tasks may need to be reopened periodically.</p> Signup and view all the answers

    What does the Facility Management Program need to maintain its effectiveness?

    <p>Fluidity in business processes with full agency support.</p> Signup and view all the answers

    What is the primary focus of the Operations Flight in responding to work management?

    <p>Infrastructure emergencies</p> Signup and view all the answers

    Which of the following work management capabilities requires compliance with specific AFIs?

    <p>Basic Capability</p> Signup and view all the answers

    What should be confirmed by Facility Managers regarding Service Requests (SR)?

    <p>Only emergency SRs can be called in.</p> Signup and view all the answers

    Which action is crucial for optimizing resources controlled by the Operations Flight?

    <p>Following the standard process for managing work</p> Signup and view all the answers

    What is a key responsibility of CEOER pertaining to labor management?

    <p>Oversee labor input and performance tracking</p> Signup and view all the answers

    In the Developing Capability, what should stakeholders ensure is communicated effectively?

    <p>Business processes and TRIRIGA requirements.</p> Signup and view all the answers

    Which of the following is NOT a requirement for the Basic Capability in work management?

    <p>Conduct quarterly reviews of labor charged.</p> Signup and view all the answers

    What must be established by CEOE to manage financial oversight effectively?

    <p>Tracking of funds and expenditures</p> Signup and view all the answers

    Which document should Facility Managers generate for TRIRIGA access requests?

    <p>System Authorization Access Requests (SAAR)</p> Signup and view all the answers

    Which of the following tasks is performed monthly to ensure effective work management?

    <p>Review completed work tasks and their labor charges.</p> Signup and view all the answers

    What is one of the operational goals related to customer communication in Developing Capability?

    <p>Have 90% of calls related to emergency requests.</p> Signup and view all the answers

    What does the maintenance risk methodology focus on?

    <p>Specific types of maintenance to mitigate emergencies</p> Signup and view all the answers

    What is a critical annual requirement concerning emergency SR processes?

    <p>Processes for after-hours emergency SRs must be created.</p> Signup and view all the answers

    What is a primary responsibility of CEOER in relation to Work Tasks (WTs)?

    <p>Ensure all completed WTs are reviewed for accuracy</p> Signup and view all the answers

    Which action should shop foremen avoid while handling non-PM WTs?

    <p>Clicking the 'Complete' button prematurely</p> Signup and view all the answers

    What should be included in the FM Handbook regarding after-hours Emergency SR processes?

    <p>Processes and procedures for emergency response</p> Signup and view all the answers

    What should CEOE ensure in case of a computer/network outage?

    <p>All sections have a process to support customers</p> Signup and view all the answers

    What is the goal of the U-Fix-It Program?

    <p>To encourage FM to perform minor maintenance</p> Signup and view all the answers

    In what way can CEOER assist shops in labor management?

    <p>By running reports to track labor inputs</p> Signup and view all the answers

    What should CEOs ensure regarding scheduled work tasks?

    <p>Discuss to de-conflict with leadership priorities</p> Signup and view all the answers

    What key performance indicator should CEOE establish?

    <p>Less than 1% of annual direct hours for emergency work</p> Signup and view all the answers

    What challenge does TRIRIGA face compared to legacy IWIMS?

    <p>It cannot establish alerts for funding thresholds</p> Signup and view all the answers

    What is a responsibility of CEOER concerning maintenance KPIs?

    <p>Regularly analyze data against maintenance KPIs</p> Signup and view all the answers

    What is the significance of the Operations Flight Commander’s policy?

    <p>It provides guidance for emergency response procedures</p> Signup and view all the answers

    What should be implemented to better manage customer expectations?

    <p>Develop a tool to track scheduling conflicts</p> Signup and view all the answers

    What is a crucial post-closure action for CEOER after WTs are completed?

    <p>Run reports to compare 'Close' statuses against evaluations</p> Signup and view all the answers

    Which of the following is true regarding PM WTs?

    <p>They are directly completed and closed by shops</p> Signup and view all the answers

    What is the primary function of CEOER CSU when receiving service requests (SRs)?

    <p>To determine if the SR qualifies as an emergency</p> Signup and view all the answers

    Why is it critical to document SRs in the GIS layer?

    <p>To identify patterns of failure and prevent systemic issues</p> Signup and view all the answers

    What should the Operations Flight do to advocate for their workload to leadership?

    <p>Manage and inform shop foremen about future requirements</p> Signup and view all the answers

    What action should be taken if a Work Task (WT) is completed with no labor hours logged?

    <p>Evaluate it for potential management issues</p> Signup and view all the answers

    What process should be in place regarding budget oversight for the Operations Flight?

    <p>Continuous tracking of funds and expenditures</p> Signup and view all the answers

    How can CEOE ensure appropriate guidance is used to validate SRs?

    <p>Incorporating AFIs and supporting playbooks</p> Signup and view all the answers

    What are the responsibilities of the Facilities Manager (FM) in using TRIRIGA?

    <p>Submit SRs and communicate facility issues</p> Signup and view all the answers

    What is required before holding a Work Request Review Board (WRRB) meeting?

    <p>Coordinating requirements in advance</p> Signup and view all the answers

    What must be documented for in-house equipment replacements?

    <p>Nameplate information and warranty documentation</p> Signup and view all the answers

    What information is crucial for tracking expenditures in the budget process?

    <p>Records of who authorized each expenditure</p> Signup and view all the answers

    What should the CSU be well versed in to manage requests properly?

    <p>Understanding funding types and duplicates</p> Signup and view all the answers

    Why is it important for CEOER to ensure FMs submit SAARs for TRIRIGA access?

    <p>To optimize accordance with operational needs</p> Signup and view all the answers

    What does excessive completion of PM WTs without labor indicate?

    <p>Potential backlog and workload management issues</p> Signup and view all the answers

    What is one responsibility of the craftsman or Sub-Activity Manager regarding failure documentation?

    <p>Contacting GIS manager for accurate documentation</p> Signup and view all the answers

    What action should not be taken when an SR does not qualify as an emergency?

    <p>Assume immediate action without checks</p> Signup and view all the answers

    What action should be taken when approvals/authorizations reach specified limits?

    <p>Seek approval from a higher authority</p> Signup and view all the answers

    Which KPI is used to measure the performance regarding work ticket closures without hours logged?

    <p>Number of WTs closed with no hours</p> Signup and view all the answers

    What percentage of response from Facility Managers is expected within 30 days after contact?

    <p>90-95%</p> Signup and view all the answers

    What should be done with individuals who are not validated on the Master FM List?

    <p>They should be immediately removed from TRIRIGA</p> Signup and view all the answers

    What is the role of the WRRB process in CE operations?

    <p>To streamline the review and final decision on requirements</p> Signup and view all the answers

    What is required after new assets are installed or replaced?

    <p>Warranty data should be updated in asset records</p> Signup and view all the answers

    How often should the Master FM List be revalidated?

    <p>Annually</p> Signup and view all the answers

    What is the expected completeness and accuracy KPI for daily time reporting?

    <p>99.9%</p> Signup and view all the answers

    Why should CEOER perform analysis on historical 3C priority/minor work?

    <p>To identify repetitive tasks for potential U-Fix-It program inclusion</p> Signup and view all the answers

    What should be done if the shops are prioritizing lower-level work over higher-priority tasks?

    <p>Reassess prioritization and manage expectations with customers</p> Signup and view all the answers

    What is required when processing completed work tickets (WTs)?

    <p>Close-out actions need to be conducted</p> Signup and view all the answers

    What should CEOE ensure regarding the updates and participating parties in WRRB?

    <p>All relevant parties are present to facilitate informed decisions</p> Signup and view all the answers

    What happens if the validation process is not followed for the Master FM List?

    <p>Individuals may not be able to perform their roles effectively</p> Signup and view all the answers

    Why is it important to remove individuals who have PCS’d or are no longer FMs from records?

    <p>To improve record keeping accuracy</p> Signup and view all the answers

    What is a potential consequence of CSU members failing to direct FMs to the U-Fix-It Store?

    <p>Increased manpower requirements on the shops</p> Signup and view all the answers

    What should be analyzed if KPIs are not being met?

    <p>The causes and necessary adjustments to processes</p> Signup and view all the answers

    What action should CEOE take regarding materiel that is on the available list but is not being used?

    <p>Evaluate and potentially remove or update it based on non-usage</p> Signup and view all the answers

    What might indicate excessive indirect labor within the CE organization?

    <p>Increased deviation from scheduled work hours</p> Signup and view all the answers

    What is suggested for the improvement of the Facility Management Program?

    <p>Adding it to the base virtual out-processing checklist</p> Signup and view all the answers

    Which KPI should be achieved to validate the project coordination process?

    <p>99.9% coordination prior to final approval</p> Signup and view all the answers

    What reports should be maintained to assess scheduling efficiency?

    <p>Schedule vs Actual Reported Time Reports</p> Signup and view all the answers

    What role does establishing a customer prioritization program serve?

    <p>Reduces incomplete work from base customers</p> Signup and view all the answers

    What is a key function of the WRRB process in relation to internal/external agencies?

    <p>Ensure alignment on new business processes</p> Signup and view all the answers

    What might indicate that the material required for certain tasks was not added to the U-Fix-It list?

    <p>Increase in the number of rejected task reports</p> Signup and view all the answers

    What should be done to resolve any deficiency found during the shop requirement evaluation?

    <p>Make necessary corrective actions and follow up</p> Signup and view all the answers

    What is the primary focus of the Preventive Maintenance (PM) program at the Basic Capability level?

    <p>Compliance with 32 series AFIs</p> Signup and view all the answers

    What is a critical outcome to evaluate when using the AF Form 1219 program?

    <p>High-volume task management efficiency</p> Signup and view all the answers

    Which task is NOT part of the monthly responsibilities at the Basic Capability level?

    <p>Assess completeness of RP/RPIE asset inventory</p> Signup and view all the answers

    Which strategy can help alleviate the backlog of identified work due to limited resources?

    <p>Utilize over-hires and additional programs for support</p> Signup and view all the answers

    What is a performance indicator for the shop requirements that must be validated?

    <p>Sufficient materiel is present in the WT record and associated documents</p> Signup and view all the answers

    How does the PM program at the Developing Capability level improve asset management?

    <p>By formalizing processes for balancing and optimizing resources</p> Signup and view all the answers

    At what frequency should the PM program validation occur under Developing Capability?

    <p>Annually</p> Signup and view all the answers

    What is a major goal of the PM program at the Matured Capability level?

    <p>Assessing PM against internal and external benchmarks</p> Signup and view all the answers

    Which of the following is an indicator that helps measure the effectiveness of the PM program?

    <p>PM to CM ratios</p> Signup and view all the answers

    What action is necessary to ensure completeness of the Real Property Installed Equipment (RPIE) inventory at the Developing Capability level?

    <p>Regular audits and inspections of all facilities</p> Signup and view all the answers

    Which of the following quarterly tasks is part of the Basic Capability level's responsibilities?

    <p>Confirming PM required materials are on hand</p> Signup and view all the answers

    What does the PM program focus on at the Matured Capability level regarding asset decisions?

    <p>Evaluating repair versus replace decisions</p> Signup and view all the answers

    Which process is essential for PM schedule enhancement at the Developing Capability level?

    <p>Involving stakeholders in scheduling processes</p> Signup and view all the answers

    What is required to validate the PM program annually at the Developing Capability level?

    <p>Completing an annual review of processes and outcomes</p> Signup and view all the answers

    Which of the following is a semi-annual task at the Matured Capability level?

    <p>Review risk matrix events</p> Signup and view all the answers

    Which monthly task is emphasized at the Basic Capability level to support PM activities?

    <p>Reviewing and activating all PM Job Plans</p> Signup and view all the answers

    What crucial aspect does Matured Capability verify regarding PM schedules?

    <p>Align PM schedules with seasonal and operational needs</p> Signup and view all the answers

    What must occur before the Initial Operational Capability (IOC) to ease the transition of assets requiring preventive maintenance (PM)?

    <p>Completion and loading of all PM requirements into the appropriate SMS.</p> Signup and view all the answers

    How should discrepancies between TRIRIGA updates and the appropriate SMS be handled?

    <p>Verify data integrity between the two systems.</p> Signup and view all the answers

    What is the minimum percentage of direct labor reporting that should be tied to PM during the first two years of TRIRIGA implementation?

    <p>25%</p> Signup and view all the answers

    What must be ensured regarding PM Technical Library (PMTL) associated with job plans?

    <p>A TRIRIGA PM Procedure must be associated with all assets requiring PM.</p> Signup and view all the answers

    When should all asset updates be finalized and entered into TRIRIGA and the corresponding SMS database?

    <p>Within 30 days of identification.</p> Signup and view all the answers

    What is the implication if 25% or more of Direct Labor Reporting is not tied to PM?

    <p>Insufficient PM coverage of all assets.</p> Signup and view all the answers

    What should be done if conflicts arise between commercial or manufacturer guidance and Air Force guidance regarding PM?

    <p>Submit potential PM procedures for review.</p> Signup and view all the answers

    What must occur when two PM Technical Libraries (PMTLs) are present for the same asset?

    <p>Use the AF PMTL over the RS Means version.</p> Signup and view all the answers

    Why must multi-shop PM requirements be synchronized?

    <p>To prevent incorrect PM from occurring.</p> Signup and view all the answers

    What is the critical aspect of managing buildings on the demolition list regarding PM?

    <p>Adjust PM actions according to maintenance risk management assessment.</p> Signup and view all the answers

    Which of these options explains the purpose of using pseudo locations for equipment in TRIRIGA?

    <p>To provide a primary work location for job plans.</p> Signup and view all the answers

    What is essential for achieving a 100% completion percentage regarding known PM requirements?

    <p>Implementing a dashboarding system at the CEOE level.</p> Signup and view all the answers

    How should training for activating and retiring assets in TRIRIGA be conducted?

    <p>Regularly to ensure comprehensive understanding.</p> Signup and view all the answers

    Why is it important for all shops to review and activate PM Job Plans and Work Tasks?

    <p>To ensure all assets receive automated PM WTs.</p> Signup and view all the answers

    Which aspect of PM must be addressed to prevent material shortages?

    <p>Review and order required PM materials throughout the year.</p> Signup and view all the answers

    Why is it essential to have a proper inventory of assets within the PM program?

    <p>To provide a basis for performance evaluation and accountability</p> Signup and view all the answers

    What should bases develop to address specific needs in the PM program?

    <p>Localized supplemental procedures</p> Signup and view all the answers

    What is the significance of validating the PM program annually?

    <p>To ensure all assets still exist and validate PM frequencies</p> Signup and view all the answers

    How does the risk matrix contribute to the PM requirements?

    <p>By selecting which assets require PM based on risk</p> Signup and view all the answers

    What is the objective of Sub-AMP programs in terms of asset management?

    <p>To track assets, their performance, and optimal maintenance strategies</p> Signup and view all the answers

    What should be done if local shortfalls occur on a PMTL tied to an asset?

    <p>Ensure localized additions are made to the Job Plan/Work Task</p> Signup and view all the answers

    What is one of the core KPIs that must be developed for effective data management?

    <p>CM to PM ratios</p> Signup and view all the answers

    Which of the following factors should be balanced within PM schedules?

    <p>Seasonality, zones, and overlapping PM requirements</p> Signup and view all the answers

    What role does TRIRIGA play within the PM activities?

    <p>It reflects the maintenance history associated with assets</p> Signup and view all the answers

    What is necessary to ensure maximum efficiency of manpower in the PM program?

    <p>Routing PM on assets by shop and building number</p> Signup and view all the answers

    What is a primary focus of AMPs and Sub-AMPs in asset management?

    <p>Tracking performance and operating costs of assets</p> Signup and view all the answers

    What is a significant consequence if plants do not finalize the distinction between plant operations tasks and PM tasks?

    <p>Resource allocation may become inefficient</p> Signup and view all the answers

    Which requirement must be included for an AMP and Sub-AMP program to operate at a Basic Capability?

    <p>Establishment of a CEOER section</p> Signup and view all the answers

    What is the primary outcome when SMS data is aligned with maintenance plans?

    <p>It supports justification for future funding for maintenance and repair.</p> Signup and view all the answers

    What is a necessary characteristic for the Sub-AMP Manager in reviewing maintenance plans?

    <p>Plans should maximize the life-cycle of assets.</p> Signup and view all the answers

    Why is it vital for CEOE to provide TRIRIGA/SMS reports to all managers?

    <p>To outline and align investments for poorly performing assets.</p> Signup and view all the answers

    What does the Project Savings Calculator assist in determining?

    <p>The most cost-effective solution/requirement.</p> Signup and view all the answers

    What is the significance of developing a 7-year maintenance/replacement plan?

    <p>It provides a foundation for achieving mature performance levels.</p> Signup and view all the answers

    How should the status of annual inventory be assessed?

    <p>During the semi-annual review period.</p> Signup and view all the answers

    What does underperforming asset management require, according to the guidelines?

    <p>Developing get well plans based on consumption data.</p> Signup and view all the answers

    What is emphasized for the Sub-AMP Manager to ensure regarding asset health?

    <p>It must combine shop inputs with formal maintenance history and SMS data.</p> Signup and view all the answers

    What is a fundamental aspect of Materiel Control at a Basic Capability level?

    <p>Receiving and issuing materiel as per purchase requests.</p> Signup and view all the answers

    What relationship should be maintained between identified requirements and future plans?

    <p>They must be analyzed for future modifications, such as demolitions.</p> Signup and view all the answers

    What should be verified during the review of capitalized assets?

    <p>Consistency across all IT systems.</p> Signup and view all the answers

    What outcome is expected from analyzing utility consumption data?

    <p>Identifying underperforming assets and creating improvement plans.</p> Signup and view all the answers

    What major transition is indicated for CEOER as it matures?

    <p>From reactive to predictive maintenance.</p> Signup and view all the answers

    What is a primary reason for developing end-of-year (EOY) materiel procurement plans?

    <p>To prioritize unfunded requirements</p> Signup and view all the answers

    Why should the Government Purchase Card (GPC) be used cautiously for procurement?

    <p>It can disrupt cost accounting</p> Signup and view all the answers

    What is the primary aim of the Sub-AMP Working Group?

    <p>To discuss issues and future requirements related to the Sub-AMP</p> Signup and view all the answers

    What should the Chief Executive Officer (CEO) maintain regarding prioritized requirements?

    <p>A living list of prioritized and priced requirements</p> Signup and view all the answers

    How often should the Sub-AMP Working Group be convened at a minimum?

    <p>Quarterly</p> Signup and view all the answers

    How can effective management of inventory items benefit the Operations Flight?

    <p>By ensuring materiel is stocked and ready for use</p> Signup and view all the answers

    What does effective tracking of requirements help to ensure?

    <p>Proper identification and execution of maintenance needs</p> Signup and view all the answers

    What is the consequence of excessive GPC procurement for frequently consumed items?

    <p>It disrupts the store's predetermined stock levels</p> Signup and view all the answers

    What should the Sub-AMP Manager do after the Sub-AMP Working Group sessions?

    <p>Report outcomes to the AMP Manager</p> Signup and view all the answers

    What should be identified by the CEO to prepare for fiscal year transitions?

    <p>Materiel required to support known needs early in the year</p> Signup and view all the answers

    What must Materiel Control analyze regarding GPC purchases?

    <p>Whether items should be stocked in sufficient quantity</p> Signup and view all the answers

    Which of the following is NOT a valid consideration when reviewing CM costs?

    <p>Current market trends for materials</p> Signup and view all the answers

    What should baseline emergency and PM time requirements be used for?

    <p>Scheduling maintenance requirements based on urgency</p> Signup and view all the answers

    What is a key factor for maintaining an orderly area according to the content?

    <p>Routine waste management procedures</p> Signup and view all the answers

    What is crucial for requirements that require external funds?

    <p>Proper identification for the right execution method</p> Signup and view all the answers

    Which group consists of members from various levels of the squadron and installation?

    <p>Sub-AMP Working Group</p> Signup and view all the answers

    Which analysis should be conducted for large maintenance actions?

    <p>Return on Investment Analysis</p> Signup and view all the answers

    What is the significance of understanding which asset systems consumed the most labor?

    <p>It helps in optimizing workforce distribution</p> Signup and view all the answers

    What does effective participation in the AMP and CAMP Working Groups entail?

    <p>Advocating for Sub-AMP/Activity interests</p> Signup and view all the answers

    Which of the following actions is NOT part of developing a suitable method for requirement execution?

    <p>Ignoring past project outcomes</p> Signup and view all the answers

    What is a critical activity when tracking all requirements?

    <p>Consolidating internal needs and external requirements</p> Signup and view all the answers

    What is the main purpose of verifying internal shop capacity on a monthly basis?

    <p>To confirm manpower availability against requirements</p> Signup and view all the answers

    During which timeframe should the Sub-AMP Manager provide proof that investments are aligned with programming guidance?

    <p>Quarterly</p> Signup and view all the answers

    What key aspect does the Developing Capability focus on for preventive and corrective maintenance?

    <p>Optimizing labor consumption for assets</p> Signup and view all the answers

    What is a fundamental requirement for maintenance plans constructed at a Matured Capability?

    <p>Plans need to integrate previous maintenance history and data systems</p> Signup and view all the answers

    What is the role of CEOER in the monthly reviews under the Developing Capability?

    <p>To identify assets consuming the most resources for PM and CM</p> Signup and view all the answers

    Which process is confirmed on a quarterly basis to assist in making operational decisions?

    <p>Corrective Maintenance cost evaluations</p> Signup and view all the answers

    What is a major objective of the AMP and Sub-AMP structures at the Matured Capability level?

    <p>To integrate plans into daily operational decisions</p> Signup and view all the answers

    What is the primary focus when developing strategies for end-of-year procurement?

    <p>Supporting a 6-month work schedule projection</p> Signup and view all the answers

    What action is taken to maintain accurate inventory within Sub-AMPs at the annual review?

    <p>Review and reconcile asset documentation consistently</p> Signup and view all the answers

    At what frequency should requirements and optimization be validated under a Matured Capability?

    <p>Monthly</p> Signup and view all the answers

    Which aspect is least emphasized in the Basic Capability of Materiel Control?

    <p>Monitoring funding availability</p> Signup and view all the answers

    Which factor should be confirmed when analyzing PM schedules according to the Developing Capability?

    <p>System/asset age and mission impact</p> Signup and view all the answers

    How often should Materiel Control review the condition of the physical security of assets?

    <p>Annually</p> Signup and view all the answers

    What common issue should Materiel Control investigate monthly regarding shop operations?

    <p>Delayed scheduling after inventory notifications</p> Signup and view all the answers

    Which meeting should Sub-AMP Working Groups convene on a quarterly basis?

    <p>Alignments for AMP and CAMP decisions</p> Signup and view all the answers

    What is a key responsibility of the Sub-AMP Manager in the Developing Capability phase?

    <p>To coordinate the CEOER reports and monitor asset performance</p> Signup and view all the answers

    What is a critical responsibility during the Quarterly review for Matured Capability?

    <p>Identify strategies for transaction reduction via GPC</p> Signup and view all the answers

    What should Sub-AMP managers do to ensure optimal lifecycle management of assets?

    <p>Confirm replacement timing based on asset depreciation schedules</p> Signup and view all the answers

    In regard to Materiel Control, what metric is crucial in assessing the effectiveness of the main store?

    <p>Frequency of inventory use by shops</p> Signup and view all the answers

    What must the Chief of Materiel Control ensure when the funding is low?

    <p>Notify CEO and shop leadership for adjustments</p> Signup and view all the answers

    Which metric is essential for establishing a return on investment (ROI) analysis for the PM and CM costs?

    <p>Comparison of labor and material costs directly</p> Signup and view all the answers

    What must CEOE provide to ensure effective programming for the worst performing assets?

    <p>Comprehensive TRIRIGA/SMS evaluations</p> Signup and view all the answers

    Which area is primarily analyzed in the Developing Capability phase of Materiel Control?

    <p>Supplier performance analysis</p> Signup and view all the answers

    What is the consequence of not keeping minimum stock levels set for the main store?

    <p>Resource wastage in storage and time</p> Signup and view all the answers

    Which of the following best describes the goal of Materiel Control programs operating at a Matured Capability?

    <p>Provide first-rate customer service</p> Signup and view all the answers

    How is the frequency of item reviews in the store important?

    <p>To ensure items support recurring demands</p> Signup and view all the answers

    What is the significant concern when deliveries are frequent and fragmented?

    <p>Higher freight costs</p> Signup and view all the answers

    What key evaluation metric should be established for inventory at stores?

    <p>Minimum and maximum levels for items</p> Signup and view all the answers

    What should the Materiel Control program emphasize in its strategic plan for acquisition?

    <p>Operational support for the Operations Flight</p> Signup and view all the answers

    What should a CEO leadership policy prioritize when funds are low?

    <p>Mission critical items only</p> Signup and view all the answers

    What must Materiel Control establish to inform shops about received materials?

    <p>Procedures for updates</p> Signup and view all the answers

    What is the suggested daily inventory rate for a store with 3,500 items over 251 business days?

    <p>$14$ items/day</p> Signup and view all the answers

    How should discrepancies between recorded and physical inventory quantities be addressed?

    <p>Perform an aggressive search for missing items</p> Signup and view all the answers

    What action should be taken if materiel is not picked up within 15 calendar days?

    <p>Send a reminder to the primary shop</p> Signup and view all the answers

    What is the importance of maintaining a well-ordered facility management area?

    <p>It can help in securing and accounting for items</p> Signup and view all the answers

    What is a primary responsibility of Materiel Control regarding material security?

    <p>Locking all doors and gates after hours</p> Signup and view all the answers

    What should be included in the physical security plan for inventory?

    <p>Checks at the end of each duty day</p> Signup and view all the answers

    What should be done if materiel is left in the holding area for over 30 days?

    <p>Investigate the cause of the delay</p> Signup and view all the answers

    Which is NOT a factor to consider for inventory management in materiel control?

    <p>Employee preferences</p> Signup and view all the answers

    What percentage of inventory sources should operations assess?

    <p>All available sources of supply</p> Signup and view all the answers

    What is a key aspect of monitoring the condition of the Materiel Control facility?

    <p>Frequent checks on various operational aspects</p> Signup and view all the answers

    What should the CoMC report on regarding facility projects?

    <p>Number of projects, date of completion</p> Signup and view all the answers

    Study Notes

    Operations Flight Objective and Management

    • Operations Flight's objective: Effectively operate, maintain, and repair Air Force facility and infrastructure assets (real property or real property installed equipment - RPIE).
    • Maximizing mission accomplishment and return on investment (ROI) is key, from an Air Force-wide, risk-based perspective.
    • Utilizing common reporting tools and procedures for data gathering, analysis, and decision-making on operating, maintaining, and repairing assets is required.
    • Responsibilities include execution, management, and oversight of facility operations, maintenance, repair, materiel control, work planning, customer service, service contract management, and operations engineering.
    • 24/7 capability to respond to and eliminate facility/infrastructure emergencies.
    • Compliance with environmental, fire, and safety laws, codes, and directives.

    CEO Organizational Structure

    • CEOE (Operations Engineering Element) is crucial for Operations Flight.
    • CEOE combines customer service, planning, and requirements optimization.
    • Responsible for optimal resource decisions and execution across all Operations Flight activities.
    • Ensures all data and knowledge from all Operations Flight shops are used in AMPs and investment plans.
    • Sub-sections:
      • Requirements & Optimization (CEOER)
      • Service Contracts (CEOES)
      • Materiel Control (CEOEM)

    CEOER - Work Management

    • Focused on shifting the Operations Flight paradigm to proactive systems performance analysis, resource optimization, and lifecycle requirements planning.
    • Two main lines of effort:
      • Work Management
      • AMP/Sub-AMP management
    • All key work management and materiel acquisition processes start and end in CEOE.
    • Goal is to aid CEOE teams in moving from Basic to Developing capabilities (based on Maintenance Excellence Institute's Reliability Pyramid).
    • Playbook is a guide for enterprise-wide performance improvement.
    • Personnel size is not a guarantee of capability maturity. Maturing programs are fragile.
    • AFCEC will develop benchmarks, KPIs, and reports to measure performance once sufficient installations reach a steady state in TRIRIGA.

    Operations Flight Resource Realities

    • Operations Flight processes have evolved due to manpower and funding reductions.
    • Spanning maintenance to construction at home station and overseas.
    • Primary role is caretaker and advocate for existing real property.
    • CEOE was created to efficiently facilitate the lifecycle of infrastructure assets in resource-constrained environments.
    • Key elements of the lifecycle include Acquisition, Maintenance & Repair, Operations, Recapitalization & Renewal and Disposal.
    • Facility management accounts for 60-80% of the total cost of ownership for a facility, according to the IFMA model.

    Managing Operations Flight Manpower

    • Understanding available time (capacity) for addressing requirements is critical.
    • Calculation of deployable work hours using C-FTEs and Availability Rate (AR).
    • Examples of AR reductions: supervision, leave, time-off awards, training, and indirect time.
    • CE emphasizes proactive systems performance analysis and lifecycle requirements planning over low-risk sustainment/enhancement work.

    CEOE Deliverables

    • CM Analysis and Planning (in-house and contracted work).
    • PM/PO Analysis and Programming (risk management-based).
    • Requirements identification and prioritization using Sub-AMP and AMP processes.
    • Support to CEN for contract execution.
    • Process and issues management for Sub-AMP assets/systems.
    • Focus on asset management and investment decision-making, answering questions about where to invest and optimizing spending.

    Work Management (CEOER) - Basic Capability

    • Weekly: Ensure non-emergency SRs are in TRIRIGA, confirm shop foremen report failures to GIS, and verify CEOER oversees WT scheduling.
    • Monthly: Validate SRs, review shop completion of PM WTs, confirm FM TRIRIGA access, and schedule WRRB meetings.
    • Quarterly: Ensure foremen charge labor, verify materiel returned, and upload documentation before completing WTs.
    • Annual: Establish after-hour emergency SR processes and work/materiel management processes for computer outages. Ensure U-Fix-It Program is established.

    Work Management (CEOER) - Developing Capability

    • Weekly: Request reports on shop labor input, manage expectations, and track KPIs for customer calls. Conduct weekly CEO meetings.
    • Monthly: Compare pending schedule requirements, confirm monthly FM reports, and revalidate FM master lists.
    • Quarterly: Validate completed WTs and perform close-out actions, track work prioritization.
    • Annual: Validate historical 3C priority work to see if materiel can be provided through U-Fix-It.

    Work Management (CEOER) - Matured Capability

    • Weekly: Validate standard reports on labor input, track KPIs for less than 1% of annual direct hours for emergency requests; 99.9% of customer phone calls for emergencies.

    Preventive Maintenance (PM)

    • Basic Capability:
      • Monthly: Complete PM requirements in SMS and TRIRIGA. Ensure data integrity.
      • Quarterly: Ensure >25% of direct labor is dedicated to PM. Ensure PMTLs exist for all assets.
    • Developing Capability:
      • Quarterly: Assess RPIE/RP asset completeness, validate life/safety requirements, and prioritize man-hours for PM.
      • Annual: Validate annual PM program.
    • Matured Capability:
      • Semi-annual: Verify risk matrix events and PM program accounting for seasonality, zones, exercises and mission requirements.
      • Annual: Assess PM routing strategy for maximum efficiency, and finalize plant operation vs. PM tasks.

    AMP and Sub-AMP

    • Basic Capability:
      • Monthly: Validate internal shop capacity supports Sub-AMP requirements.
      • Quarterly: Ensure Sub-AMP Working Groups convene.
      • Semi-annual: Update meeting and deliverable timelines for CTO and Facility Utilization Board.
      • Annual: Ensure valid requirements falling below a cut-line are captured for next FY.
    • Developing Capability:
      • Monthly: Identify assets consuming most PM/CM labor.
      • Quarterly: Validate Sub-AMP investments in AMP/Investment Plans and ensure issues are documented. Compare CM reports to SMS. Analyze and review PM schedules.
      • Semi-annual: Provide TRIRIGA/SMS reports for all Sub-AMP and AMP managers. Validate asset utility, performance, and get well plans.
    • Matured Capability:
      • Monthly: Review 7-year execution plans when new information is available.
      • Quarterly: Validate 7-year maintenance plans, ensure holistic asset health assessment, and confirm identified requirements are planned for the appropriate out-year execution.
      • Semi-annual: Validate Sub-AMP manager review of 7-year plans.
      • Annual: Review IWIMS/ACES/SMS/TRIRIGA data for accuracy. Coordinate with the RPO for asset reconciliation. Use Project Savings Calculator for lifecycle cost analysis.

    Materiel Control

    • Basic Capability:
      • Baseline: Determine total inventory value, number of line items, and average deliveries per day.
      • Monthly: Review funding documents. Ensure CoMC attends WRRB.
      • Quarterly: Review materiel-complete facility projects. Notify shops of materiel arrival.
      • Semi-annual: Review annual inventory.
      • Annual: Review physical security, facility condition, and end-of-year procurement plans.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    This quiz covers the objectives and responsibilities of the Operations Flight within the Air Force. It includes details on managing infrastructure assets, maximizing ROI, and ensuring compliance with safety and environmental laws. Test your knowledge on the essential functions and organizational structures relevant to the Operations Flight.

    More Like This