Global Electromagnetic Compatibility (EMC) Dec 2017 PDF
Document Details
Uploaded by Deleted User
2017
Tags
Summary
This document outlines the Electromagnetic Compatibility (EMC) requirements and deliverables for component/sub-system suppliers. It details a comprehensive revision history encompassing different dates and contributors. It encompasses the scope, resources, definitions, and instructions needed for commodity program use.
Full Transcript
-Attachment -- Electromagnetic Compatibility (EMC) -------------------------------------------------- +-----------------------------------------------------------------------+ | ***[Instructions: ]*** | |...
-Attachment -- Electromagnetic Compatibility (EMC) -------------------------------------------------- +-----------------------------------------------------------------------+ | ***[Instructions: ]*** | | | | This Electromagnetic Compatibility (EMC) attachment covers the | | specific materials and processes to be accomplished by | | | | Component / Sub-system Suppliers. Nothing shall be written out of | | this attachment, as this is a generic agreement that represents the | | minimum mandatory set of EMC requirements and deliverables for a | | commodity program. Materials provided to the EMC authority should be | | identified as being either Level One or Level Two (see section 1.4 of | | the Base Content of the electronic Statement of Work (eSOW). It shall | | be delivered to the OEM EMC authority without prejudice, and shall | | remain protected in good faith by the recipient, a designated EMC | | Engineer, for the duration of any review, without supervision from | | the Supplier. | +-----------------------------------------------------------------------+ Revision Record =============== +-----------------------+-----------------------+-----------------------+ | **Revision Date** | **Revision Content | **Name** | | | Details (Section\# & | | | | changes) :** | | +-----------------------+-----------------------+-----------------------+ | 01-Aug-2006 | Initial Release EMC | Paul Edwards | | | Attachment (Global | | | | eSOW Version 15) | | +-----------------------+-----------------------+-----------------------+ | 31-Oct-2007 | Agreed Version across | Paul Edwards | | | Vehicle Brands & | | | | Regions | | +-----------------------+-----------------------+-----------------------+ | 9-Mar-2010 | Updated EMC Component | Joseph J Root | | | Test Plan Template | | | | link | | +-----------------------+-----------------------+-----------------------+ | 9-Mar-2010 | Added reference to | Joseph J Root | | | ARL 09-0466 and link | | | | to Ford external EMC | | | | site -- pg 3, EMCR | | | | 2.2 | | +-----------------------+-----------------------+-----------------------+ | 7-May-2010 | Removed reference to | Ron Missier | | | Annex B of EMC | | | | specification | | | | | | | | Renamed EMCD:4.8 as | | | | EMC Change Management | | | | and Re-validation | | +-----------------------+-----------------------+-----------------------+ | 07-Feb2012 | Updated based on | Ron Missier | | | Global EMC summit | | | | review | | +-----------------------+-----------------------+-----------------------+ | 22-Jan-2014 | PTCC milestone has | Ron Missier | | | been removed from | | | | GPDS. Replaced PTCC | | | | milestone with PSC | | | | (UN \< PSC+3mths \> | | | | and UP \) | | +-----------------------+-----------------------+-----------------------+ | 19 may 2017 | Aligned with GPDS3.0 | R. Huebner | +-----------------------+-----------------------+-----------------------+ | 16 June 2017 | Revised platform test | R. Huebner | | | planning and | | | | execution timing Ref | | | | GEMC 15 June 2017 | | +-----------------------+-----------------------+-----------------------+ | 04 Dec 2017 | Updated for generic | Ron Missier | | | base eSOW attachment | | +-----------------------+-----------------------+-----------------------+ **Scope** This EMC Attachment describes the agreement and essential work activity associated with the design and validation of components / sub-systems for Electromagnetic Compatibility. The result of this activity shall provide EMC compliant ECU\'s (delineated in FSMS requirement RQT-002700-000417 (legacy 09-0466) and found in the EMC component specification), on time, for vehicle integration and ready for vehicle EMC evaluation/certification testing. This attachment has been developed for Global Use and is agreed across all vehicle brands and geographical regions. It is aligned to the activities and milestones of the Global Product Development System (GPDS3.0). This document also supports global purchasing terms and conditions (PPGTC Jan 1, 2004). However, for each region in which the vehicle brand operates, local requirements may be adopted in the use of this EMC attachment. ALL electrical components and/or subsystems shall comply with the EMC requirements, tasks and deliverables contained herein. The actual content and flow may be tailored for optimum application to the subject component/sub-system, and the design scope, pursuant to the following descriptions and instructions. **Resources** +-----------------------------------+-----------------------------------+ | **Resource** | Web link | | | ======== | +-----------------------------------+-----------------------------------+ | External: Ford EMC Online ( For | | | EMC Test Labs) | | | | | | (Suppliers may access | | | [www.fordemc.com](http://www.ford | | | emc.com) | | | to download a copy of the Ford | | | EMC requirement. However it is | | | the responsibility of the | | | supplier to ensure they have the | | | copy of the EMC requirement they | | | are sourced to comply. | | +-----------------------------------+-----------------------------------+ **\ Definitions** This section defines terms as used in context of this EMC attachment: **New Sub-system/Component:** New Sub-system/Component design **Carryover Sub-systems/Component:** Previously validated products from another vehicle program, having the same form, fit and electrical function, and now re-used (\"carried over\") [without change] on a future program. **Carryover Sub-systems/Component with Change:** Previously validated products from another vehicle program, having the similar form, fit and electrical function, and now re-used (\"carried over\") [with change] on a future program. **OEM:** Implies [all] vehicle OEM brand names, Ford (all regions) and Lincoln. **Instructions for Commodity Program Use:** **1.) New sub-systems/components:** All requirements, tasks and deliverables contained herein are applicable to new commodity sub-systems and components. [Suppliers:] Must perform all tasks and submit all EMC deliverables pursuant to the requirements of this Attachment. **2.) Carryover sub-systems/components:** [Suppliers:] Carryover system/component(s) that will be used in a forward program (including serviceable items) shall be evaluated for potential risk to EMC. It is the responsibility of the Supplier to provide necessary documentation (test data / report) if required, to support risk evaluation. Any exceptions require Ford approval and should be denoted in this Attachment. It is not necessary for a carryover product to go through the entire EMC process, provided evidence can be shown that: ▪ there have been no EMC field issues / Things Gone Wrong (TGW) reported This Attachment can be issued and used, if necessary, without an associated Commodity eSOW. **3.) Carryover sub-system/components with design change (hardware or software change):** Combination systems of New & Carryover sub-system/components shall be subject to the EMC design activity delineated in 1 & 2 above. Carryover sub-system/components that require a design change shall be subject to the activity delineated in 1, or reduced sub-set of, based on early program evaluation of requirements between OEM & Supplier. [Suppliers:] a. Must submit necessary [carryover] items pursuant to Ford format requirements including any denoted design activity (in 1. and 2. above) to ensure [electromagnetic compatibility with New Design Items]. [OEM Users ] a. The Electrical Program Management Team (PMT) leader / Commodity D&R and EMC Design Engineer/Supervisor (if needed) will complete / edit this Attachment with the Supplier and secure signatures denoting agreement. b. This Attachment may be utilized as early program direction prior to a completed eSOW being issued. c. This Attachment can be used and issued separately, to document specific EMC activity, when a formal eSOW is unnecessary. d. All EMC Attachment issues shall be resolved by the Commodity Supplier On Board Date: e. This Attachment **must be finalized and included** in the completed eSOW package to support eSOW formalization and Target Agreements. (GPDS Deliverable) f. Section 2 - 4 in this Attachment specifically addresses design activity and deliverable submission requirements that can be modified pursuant to the "mix" of carryover and new designs addressed by this eSOW. -------------------------------------------------- **1**. **Commodity :All applicable commodities** -------------------------------------------------- +-----------+-----------+-----------+-----------+-----------+-----------+ | **2.** | | | | | | | **Electro | | | | | | | magnetic | | | | | | | Compatibi | | | | | | | lity | | | | | | | Program | | | | | | | Requireme | | | | | | | nts:** | | | | | | +===========+===========+===========+===========+===========+===========+ | This | | | | | | | section | | | | | | | provides | | | | | | | a listing | | | | | | | of | | | | | | | Supplier | | | | | | | requireme | | | | | | | nts | | | | | | | necessary | | | | | | | to | | | | | | | support | | | | | | | the | | | | | | | Component | | | | | | | / | | | | | | | Sub-syste | | | | | | | m | | | | | | | Design | | | | | | | and | | | | | | | Validatio | | | | | | | n | | | | | | | process | | | | | | | and the | | | | | | | Vehicle | | | | | | | EMC | | | | | | | Evaluatio | | | | | | | n | | | | | | | and | | | | | | | Certifica | | | | | | | tion | | | | | | | Process | | | | | | | for GPDS | | | | | | | programs. | | | | | | | | | | | | | | The table | | | | | | | is | | | | | | | formatted | | | | | | | to | | | | | | | identify | | | | | | | agreement | | | | | | | or | | | | | | | exclusion | | | | | | | of | | | | | | | Requireme | | | | | | | nts. | | | | | | | Exclusion | | | | | | | s | | | | | | | must be | | | | | | | documente | | | | | | | d | | | | | | | and | | | | | | | justified | | | | | | | in | | | | | | | Section | | | | | | | 5. | | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | **Require | **The | | | | | | ment | Supplier | | | | | | ID** | [Shall]{. | | | | | | | underline | | | | | | | }:** | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.1 | Provide | X | N/A | X | X | | | adequate | | | | | | | EMC | | | | | | | Design | | | | | | | Engineeri | | | | | | | ng | | | | | | | resources | | | | | | | to meet | | | | | | | all | | | | | | | product | | | | | | | timing, | | | | | | | deliverab | | | | | | | les | | | | | | | and | | | | | | | provide | | | | | | | compliant | | | | | | | component | | | | | | | / | | | | | | | sub-syste | | | | | | | m | | | | | | | (HW/SW) | | | | | | | by | | | | | | | Vehicle | | | | | | | MRD. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.2 | Design | X | X | X | X | | | the | | | | | | | component | | | | | | | / | | | | | | | sub-syste | | | | | | | m | | | | | | | to | | | | | | | function | | | | | | | with the | | | | | | | required | | | | | | | functiona | | | | | | | l | | | | | | | performan | | | | | | | ce | | | | | | | within | | | | | | | the | | | | | | | electroma | | | | | | | gnetic | | | | | | | environme | | | | | | | nt | | | | | | | limits | | | | | | | specified | | | | | | | in the | | | | | | | current | | | | | | | EMC | | | | | | | Specifica | | | | | | | tion | | | | | | | (FSMS | | | | | | | requireme | | | | | | | nt | | | | | | | RQT-00270 | | | | | | | 0-000417 | | | | | | | ), | | | | | | | [AND]{.un | | | | | | | derline}, | | | | | | | when | | | | | | | tested in | | | | | | | the | | | | | | | vehicle, | | | | | | | the | | | | | | | component | | | | | | | / | | | | | | | subsystem | | | | | | | shall | | | | | | | comply | | | | | | | with all | | | | | | | relevant | | | | | | | FORD | | | | | | | Vehicle | | | | | | | Level EMC | | | | | | | Requireme | | | | | | | nts: | | | | | | | | | | | | | | ( | | | | | | | RQT-00270 | | | | | | | 0-000373, | | | | | | | RQT-00270 | | | | | | | 0-000376, | | | | | | | RQT-00270 | | | | | | | 0-000380, | | | | | | | | | | | | | | RQT-00270 | | | | | | | 0-000387, | | | | | | | RQT-00270 | | | | | | | 0-000394, | | | | | | | RQT-00270 | | | | | | | 0-000418, | | | | | | | | | | | | | | RQT-00270 | | | | | | | 0-000432& | | | | | | | RQT-00270 | | | | | | | 0-000429) | | | | | | |. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.3 | Identify | X | N/A | X | X | | | any | | | | | | | conflict( | | | | | | | s) | | | | | | | or | | | | | | | ambiguiti | | | | | | | es | | | | | | | with any | | | | | | | specified | | | | | | | component | | | | | | | / | | | | | | | sub-syste | | | | | | | m | | | | | | | EMC | | | | | | | requireme | | | | | | | nt(s) | | | | | | | and | | | | | | | present | | | | | | | each case | | | | | | | to Ford | | | | | | | EMC for | | | | | | | clarifica | | | | | | | tion | | | | | | | & | | | | | | | resolutio | | | | | | | n. | | | | | | | These | | | | | | | issues | | | | | | | shall be | | | | | | | presented | | | | | | | at the | | | | | | | earliest | | | | | | | opportuni | | | | | | | ty | | | | | | | to | | | | | | | initiate | | | | | | | resolutio | | | | | | | n | | | | | | | and | | | | | | | potential | | | | | | | ly | | | | | | | avoid | | | | | | | downstrea | | | | | | | m | | | | | | | issues | | | | | | | and | | | | | | | costs. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.4 | Develop, | X | N/A | X | X | | | maintain | | | | | | | and | | | | | | | utilize a | | | | | | | formal | | | | | | | internal | | | | | | | EMC | | | | | | | design | | | | | | | process. | | | | | | | This | | | | | | | process | | | | | | | includes | | | | | | | documente | | | | | | | d | | | | | | | measures | | | | | | | to | | | | | | | exercise | | | | | | | EMC | | | | | | | control | | | | | | | within | | | | | | | the | | | | | | | Supplier\ | | | | | | | 's | | | | | | | own | | | | | | | supply | | | | | | | base | | | | | | | (EMCR: | | | | | | | 2.5). | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.5 | Evaluate | X | N/A | X | X | | | the EMC | | | | | | | Capabilit | | | | | | | y | | | | | | | of its | | | | | | | Tier 2+ | | | | | | | Suppliers | | | | | | | when | | | | | | | used, | | | | | | | [and | | | | | | | manage]{. | | | | | | | underline | | | | | | | } | | | | | | | the EMC | | | | | | | of parts | | | | | | | supplied | | | | | | | to it, | | | | | | | for use | | | | | | | in the | | | | | | | subject | | | | | | | component | | | | | | | / | | | | | | | sub-syste | | | | | | | m. | | | | | | | The Tier | | | | | | | 1 | | | | | | | Supplier | | | | | | | shall be | | | | | | | the SPOC | | | | | | | (single | | | | | | | point of | | | | | | | contact) | | | | | | | on all | | | | | | | EMC | | | | | | | related | | | | | | | Issues | | | | | | | within | | | | | | | their | | | | | | | Tier 2+ | | | | | | | Supply | | | | | | | base. If | | | | | | | it is | | | | | | | determine | | | | | | | d | | | | | | | that a | | | | | | | Tier 2+ | | | | | | | supplier | | | | | | | is | | | | | | | responsib | | | | | | | le | | | | | | | for an | | | | | | | EMC | | | | | | | issue, | | | | | | | then the | | | | | | | FORD EMC | | | | | | | Engineeri | | | | | | | ng | | | | | | | reserves | | | | | | | the right | | | | | | | to work | | | | | | | directly | | | | | | | with | | | | | | | sub-suppl | | | | | | | ier, | | | | | | | if it | | | | | | | becomes | | | | | | | necessary | | | | | | |. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.6 | Support | X | N/A | X | X | | | requireme | | | | | | | nts | | | | | | | and | | | | | | | deliverab | | | | | | | les | | | | | | | for EMC | | | | | | | Technical | | | | | | | Design | | | | | | | Reviews | | | | | | | (TDR), | | | | | | | [when | | | | | | | requested | | | | | | | by the | | | | | | | FORD EMC | | | | | | | Engineer] | | | | | | | {.underli | | | | | | | ne}. | | | | | | | Personnel | | | | | | | support | | | | | | | shall | | | | | | | consist | | | | | | | of the | | | | | | | Product | | | | | | | Supplier | | | | | | | Hardware | | | | | | | and EMC | | | | | | | Engineer. | | | | | | | If the | | | | | | | product | | | | | | | design | | | | | | | team is | | | | | | | not local | | | | | | | to the | | | | | | | FORD EMC | | | | | | | Team, | | | | | | | then a | | | | | | | virtual | | | | | | | collabora | | | | | | | tion | | | | | | | may be | | | | | | | establish | | | | | | | ed. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.7 | Provide | X | N/A | X | X | | | [ALL]{.un | | | | | | | derline} | | | | | | | deliverab | | | | | | | les | | | | | | | (Refer to | | | | | | | Section | | | | | | | 4) in | | | | | | | English | | | | | | | and | | | | | | | required | | | | | | | electroni | | | | | | | c | | | | | | | data | | | | | | | format(s) | | | | | | |. | | | | | | | Any | | | | | | | deliverab | | | | | | | les | | | | | | | required | | | | | | | to | | | | | | | support | | | | | | | requested | | | | | | | TDR shall | | | | | | | be | | | | | | | provided, | | | | | | | without | | | | | | | prejudice | | | | | | | , | | | | | | | [at least | | | | | | | 10 | | | | | | | business | | | | | | | days | | | | | | | ahead]{.u | | | | | | | nderline} | | | | | | | of | | | | | | | review. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.8 | Initiate, | X | N/A | X | X | | | develop | | | | | | | and | | | | | | | maintain | | | | | | | an EMC | | | | | | | Test Plan | | | | | | | as | | | | | | | defined | | | | | | | by each | | | | | | | program | | | | | | | deliverab | | | | | | | les. | | | | | | | The plan | | | | | | | should be | | | | | | | developed | | | | | | | in | | | | | | | consultat | | | | | | | ion | | | | | | | with FORD | | | | | | | EMC / D&R | | | | | | | Activitie | | | | | | | s. | | | | | | | \[See | | | | | | | EMCD: | | | | | | | 4.5\] | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.9 | Incorpora | X | N/A | X | X | | | te | | | | | | | CAE | | | | | | | Analysis | | | | | | | into | | | | | | | their EMC | | | | | | | design | | | | | | | process. | | | | | | | At a | | | | | | | minimum | | | | | | | the | | | | | | | Supplier | | | | | | | shall run | | | | | | | WCCA | | | | | | | (Worst | | | | | | | Case | | | | | | | Circuit | | | | | | | Analysis) | | | | | | | for | | | | | | | Conducted | | | | | | | Immunity | | | | | | | DC Stress | | | | | | | type | | | | | | | tests on | | | | | | | all | | | | | | | applicabl | | | | | | | e | | | | | | | interface | | | | | | | circuits. | | | | | | | Satisfact | | | | | | | ory | | | | | | | analysis | | | | | | | presented | | | | | | | to FORD | | | | | | | EMC | | | | | | | Engineer, | | | | | | | may | | | | | | | negate | | | | | | | the | | | | | | | requireme | | | | | | | nt | | | | | | | to | | | | | | | conduct | | | | | | | certain | | | | | | | CI Tests. | | | | | | | This | | | | | | | could | | | | | | | minimize | | | | | | | the | | | | | | | number of | | | | | | | EMC | | | | | | | Validatio | | | | | | | n | | | | | | | Tests and | | | | | | | Costs. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.10 | Track | X | N/A | X | X | | | [ALL]{.un | | | | | | | derline} | | | | | | | design | | | | | | | changes | | | | | | | that may | | | | | | | occur | | | | | | | after | | | | | | | successfu | | | | | | | l | | | | | | | Design | | | | | | | Verificat | | | | | | | ion | | | | | | | (DV) and | | | | | | | determine | | | | | | | impact to | | | | | | | EMC. The | | | | | | | Supplier | | | | | | | shall | | | | | | | provide | | | | | | | an EMC | | | | | | | risk | | | | | | | assessmen | | | | | | | t | | | | | | | for each | | | | | | | individua | | | | | | | l | | | | | | | design | | | | | | | change | | | | | | | and | | | | | | | determine | | | | | | | necessary | | | | | | | EMC | | | | | | | re-testin | | | | | | | g | | | | | | | requireme | | | | | | | nts. | | | | | | | A | | | | | | | technical | | | | | | | justifica | | | | | | | tion | | | | | | | supported | | | | | | | by | | | | | | | competent | | | | | | | engineeri | | | | | | | ng | | | | | | | analysis | | | | | | | shall be | | | | | | | required | | | | | | | for | | | | | | | mitigatio | | | | | | | n | | | | | | | of | | | | | | | re-test | | | | | | | requireme | | | | | | | nts. | | | | | | | \[EMCD: | | | | | | | 4.8\] | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.11 | Validate | X | N/A | X | X | | | [ALL]{.un | | | | | | | derline} | | | | | | | modules | | | | | | | with | | | | | | | [producti | | | | | | | on | | | | | | | hardware | | | | | | | ready / | | | | | | | productio | | | | | | | n | | | | | | | intent | | | | | | | software | | | | | | | code]{.un | | | | | | | derline}. | | | | | | | Any | | | | | | | software | | | | | | | strategie | | | | | | | s | | | | | | | / | | | | | | | technique | | | | | | | s | | | | | | | used for | | | | | | | EMC | | | | | | | mitigatio | | | | | | | n | | | | | | | should be | | | | | | | applied. | | | | | | | This | | | | | | | software | | | | | | | shall be | | | | | | | verified | | | | | | | / | | | | | | | approved | | | | | | | via the | | | | | | | FORD | | | | | | | Software | | | | | | | developme | | | | | | | nt | | | | | | | process. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.12 | Utilize | X | N/A | X | X | | | EMC Test | | | | | | | facilitie | | | | | | | s | | | | | | | that are | | | | | | | \"recogni | | | | | | | zed\" | | | | | | | by FORD. | | | | | | | Details | | | | | | | regarding | | | | | | | the | | | | | | | laborator | | | | | | | y | | | | | | | recogniti | | | | | | | on | | | | | | | process | | | | | | | may be | | | | | | | found at | | | | | | | [www.ford | | | | | | | emc.com]( | | | | | | | http://ww | | | | | | | w.fordemc | | | | | | |.com). | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.13 | Perform | X | N/A | X | X | | | all | | | | | | | Responsib | | | | | | | ilities | | | | | | | and | | | | | | | provide | | | | | | | all | | | | | | | Deliverab | | | | | | | les | | | | | | | in a | | | | | | | timely | | | | | | | manner as | | | | | | | defined | | | | | | | in | | | | | | | Responsib | | | | | | | ilities, | | | | | | | Section 3 | | | | | | | and | | | | | | | Supplier | | | | | | | Deliverab | | | | | | | les, | | | | | | | Section | | | | | | | 4. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.14 | Review | X | N/A | X | X | | | FORD | | | | | | | document | | | | | | | titled | | | | | | | \"Purchas | | | | | | | ing | | | | | | | Global | | | | | | | Terms and | | | | | | | Condition | | | | | | | s | | | | | | | PPGTC Jan | | | | | | | 1, 2004. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.15 | Deliver | X | N/A | X | X | | | to Ford, | | | | | | | for use | | | | | | | by EMC, | | | | | | | the | | | | | | | materials | | | | | | | /document | | | | | | | s | | | | | | | listed | | | | | | | in: | | | | | | | Section | | | | | | | 4, | | | | | | | Supplier | | | | | | | Deliverab | | | | | | | les. | | | | | | | | | | | | | | The | | | | | | | deliverab | | | | | | | les | | | | | | | shall be | | | | | | | categoriz | | | | | | | ed | | | | | | | per | | | | | | | section | | | | | | | 16 of | | | | | | | PPGTC Jan | | | | | | | 1, 2004, | | | | | | | and | | | | | | | marked | | | | | | | with an | | | | | | | appropria | | | | | | | te | | | | | | | legend | | | | | | | such as: | | | | | | | | | | | | | | *\"XYZ | | | | | | | Company | | | | | | | considers | | | | | | | this | | | | | | | material | | | | | | | to be | | | | | | | categoriz | | | | | | | ed | | | | | | | as Level | | | | | | | 1 or | | | | | | | Level 2 | | | | | | | per PPGTC | | | | | | | Jan1, | | | | | | | 2004 and | | | | | | | subject | | | | | | | to the | | | | | | | terms and | | | | | | | condition | | | | | | | s | | | | | | | defined | | | | | | | therein.\ | | | | | | | "* | | | | | | | | | | | | | | The | | | | | | | informati | | | | | | | on | | | | | | | required | | | | | | | by these | | | | | | | deliverab | | | | | | | les | | | | | | | should | | | | | | | exist in | | | | | | | some form | | | | | | | and that | | | | | | | informati | | | | | | | on | | | | | | | shall be | | | | | | | delivered | | | | | | | to FORD | | | | | | | in | | | | | | | acceptabl | | | | | | | e | | | | | | | electroni | | | | | | | c | | | | | | | format. | | | | | | | It shall | | | | | | | be | | | | | | | delivered | | | | | | | to, and | | | | | | | remain | | | | | | | protected | | | | | | | in good | | | | | | | faith by, | | | | | | | the | | | | | | | recipient | | | | | | | (a | | | | | | | designate | | | | | | | d | | | | | | | FORD EMC | | | | | | | Engineer) | | | | | | | , | | | | | | | for the | | | | | | | duration | | | | | | | of any | | | | | | | deliverab | | | | | | | le | | | | | | | review. | | | | | | | | | | | | | | The | | | | | | | recipient | | | | | | | shall | | | | | | | conduct | | | | | | | their | | | | | | | review | | | | | | | without | | | | | | | on-site | | | | | | | interfere | | | | | | | nce | | | | | | | from the | | | | | | | Supplier. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.16 | Present | X | N/A | X | X | | | UN/UP | | | | | | | Component | | | | | | | / | | | | | | | sub-syste | | | | | | | m | | | | | | | DVP EMC | | | | | | | Test | | | | | | | Result | | | | | | | Summary | | | | | | | within | | | | | | | | | | | | | | [5 | | | | | | | business | | | | | | | days]{.un | | | | | | | derline} | | | | | | | following | | | | | | | completio | | | | | | | n | | | | | | | of EMC | | | | | | | testing. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.17 | Present | X | N/A | X | X | | | UN | | | | | | | Component | | | | | | | / | | | | | | | sub-syste | | | | | | | m | | | | | | | DVP EMC | | | | | | | Test | | | | | | | Report | | | | | | | within | | | | | | | [30 | | | | | | | business | | | | | | | days]{.un | | | | | | | derline} | | | | | | | following | | | | | | | completio | | | | | | | n | | | | | | | of | | | | | | | testing | | | | | | | and no | | | | | | | later | | | | | | | than the | | | | | | | vehicle | | | | | | | program | | | | | | | scheduled | | | | | | | \< DCV | | | | | | | MRD \>. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.18 | Present | X | N/A | X | X | | | UP | | | | | | | Component | | | | | | | / | | | | | | | sub-syste | | | | | | | m | | | | | | | DVP EMC | | | | | | | Test | | | | | | | Report | | | | | | | within | | | | | | | [30 | | | | | | | business | | | | | | | days]{.un | | | | | | | derline} | | | | | | | following | | | | | | | completio | | | | | | | n | | | | | | | of | | | | | | | testing | | | | | | | and no | | | | | | | later | | | | | | | than 30 | | | | | | | days | | | | | | | before | | | | | | | the | | | | | | | vehicle | | | | | | | program | | | | | | | scheduled | | | | | | | \. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.19 | In the | X | N/A | X | X | | | event of | | | | | | | component | | | | | | | level | | | | | | | non-compl | | | | | | | iance(s), | | | | | | | the | | | | | | | Supplier | | | | | | | shall | | | | | | | provide | | | | | | | an EMC DV | | | | | | | Test | | | | | | | Failure | | | | | | | Analysis | | | | | | | or 8D | | | | | | | document | | | | | | | with the | | | | | | | formal | | | | | | | DVP EMC | | | | | | | Test | | | | | | | Report. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.20 | Provide | X | X | X | X | | | productio | | | | | | | n | | | | | | | represent | | | | | | | ative | | | | | | | (HW&SW) | | | | | | | modules | | | | | | | in order | | | | | | | to | | | | | | | support | | | | | | | scheduled | | | | | | | \ | | | | | | | Vehicle | | | | | | | EMC Test. | | | | | | | Surrogate | | | | | | | / | | | | | | | Non-produ | | | | | | | ction | | | | | | | represent | | | | | | | ative | | | | | | | modules | | | | | | | shall NOT | | | | | | | be | | | | | | | acceptabl | | | | | | | e. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.21 | Work with | X | X | X | X | | | EMC to | | | | | | | resolve | | | | | | | any | | | | | | | vehicle | | | | | | | level EMC | | | | | | | issue(s) | | | | | | | related | | | | | | | to the | | | | | | | Suppliers | | | | | | | Component | | | | | | | / | | | | | | | Sub-syste | | | | | | | m. | | | | | | | This | | | | | | | includes | | | | | | | the | | | | | | | delivery | | | | | | | and use | | | | | | | of all | | | | | | | pertinent | | | | | | | design | | | | | | | informati | | | | | | | on | | | | | | | necessary | | | | | | | to | | | | | | | resolve | | | | | | | the | | | | | | | issue. | | | | | | | Resultant | | | | | | | correctiv | | | | | | | e | | | | | | | actions | | | | | | | shall be | | | | | | | complete | | | | | | | by | | | | | | | \ | | | | | | | | | | | | | | Where the | | | | | | | Suppliers | | | | | | | Component | | | | | | | / | | | | | | | Sub-syste | | | | | | | m | | | | | | | has NOT | | | | | | | demonstra | | | | | | | ted | | | | | | | complianc | | | | | | | e | | | | | | | with | | | | | | | component | | | | | | | level | | | | | | | requireme | | | | | | | nts | | | | | | | and is | | | | | | | identifie | | | | | | | d | | | | | | | as the | | | | | | | root | | | | | | | cause, | | | | | | | the | | | | | | | Supplier | | | | | | | shall be | | | | | | | liable & | | | | | | | responsib | | | | | | | le | | | | | | | for | | | | | | | funding | | | | | | | subsequen | | | | | | | t | | | | | | | vehicle | | | | | | | level | | | | | | | investiga | | | | | | | tions | | | | | | | and | | | | | | | sign-off | | | | | | | tests for | | | | | | | the | | | | | | | associate | | | | | | | d | | | | | | | vehicle | | | | | | | level | | | | | | | failure. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ | EMCR 2.22 | Support | X | X | X | X | | | prototype | | | | | | | vehicle | | | | | | | EMC | | | | | | | sign-off | | | | | | | as | | | | | | | required. | | | | | +-----------+-----------+-----------+-----------+-----------+-----------+ +---------+---------+---------+---------+---------+---------+---------+ | **3.** | *L= | | | | | | | **Elect | Lead* | | | | | | | romagne | | | | | | | | tic | *E= | | | | | | | Compati | Execute | | | | | | | bility | * | | | | | | | Program | | | | | | | | Content | *S= | | | | | | | :** | Support | | | | | | | | * | | | | | | +=========+=========+=========+=========+=========+=========+=========+ | This | | | | | | | | section | | | | | | | | is | | | | | | | | structu | | | | | | | | red | | | | | | | | listing | | | | | | | | the | | | | | | | | specifi | | | | | | | | c | | | | | | | | program | | | | | | | | milesto | | | | | | | | nes | | | | | | | | by | | | | | | | | which | | | | | | | | tasks | | | | | | | | and | | | | | | | | deliver | | | | | | | | ables | | | | | | | | are to | | | | | | | | be | | | | | | | | accompl | | | | | | | | ished | | | | | | | | in | | | | | | | | order | | | | | | | | to | | | | | | | | support | | | | | | | | GPDS | | | | | | | | commodi | | | | | | | | ty | | | | | | | | & | | | | | | | | vehicle | | | | | | | | program | | | | | | | | s. | | | | | | | | | | | | | | | | All | | | | | | | | timing | | | | | | | | is | | | | | | | | approxi | | | | | | | | mate | | | | | | | | with | | | | | | | | specifi | | | | | | | | c | | | | | | | | dates | | | | | | | | for | | | | | | | | deliver | | | | | | | | ables | | | | | | | | being | | | | | | | | establi | | | | | | | | shed | | | | | | | | by the | | | | | | | | Supplie | | | | | | | | r | | | | | | | | on | | | | | | | | Board | | | | | | | | (SOB) | | | | | | | | date | | | | | | | | and the | | | | | | | | individ | | | | | | | | ual | | | | | | | | commodi | | | | | | | | ty | | | | | | | | work | | | | | | | | plan. | | | | | | | | This | | | | | | | | date is | | | | | | | | establi | | | | | | | | shed | | | | | | | | by the | | | | | | | | \ | | | | | | | | milesto | | | | | | | | ne | | | | | | | | for | | | | | | | | Under-b | | | | | | | | ody | | | | | | | | (UN) | | | | | | | | compone | | | | | | | | nts | | | | | | | | and | | | | | | | | \ | | | | | | | | for | | | | | | | | Upper-b | | | | | | | | ody | | | | | | | | (UP) | | | | | | | | compone | | | | | | | | nts. | | | | | | | | | | | | | | | | This | | | | | | | | table | | | | | | | | is | | | | | | | | formatt | | | | | | | | ed | | | | | | | | to | | | | | | | | identif | | | | | | | | y | | | | | | | | agreeme | | | | | | | | nt | | | | | | | | or | | | | | | | | exclusi | | | | | | | | on | | | | | | | | of | | | | | | | | Program | | | | | | | | Tasks | | | | | | | | and | | | | | | | | respons | | | | | | | | ibility | | | | | | | | for | | | | | | | | each | | | | | | | | task. | | | | | | | | Exclusi | | | | | | | | ons | | | | | | | | must be | | | | | | | | documen | | | | | | | | ted | | | | | | | | and | | | | | | | | justifi | | | | | | | | ed | | | | | | | | in | | | | | | | | Section | | | | | | | | 5. | | | | | | | +---------+---------+---------+---------+---------+---------+---------+ | No | \ | ibility | | | | | | | | / Task | | | | +---------+---------+---------+---------+---------+---------+---------+ | | TPS | TSC+3mt | Review | S/E | L | \- | | | | hs | program | | | | | | | | assumpt | | | | | | | | ions | | | | | | | | & | | | | | | | | cascade | | | | | | | | applica | | | | | | | | ble | | | | | | | | compone | | | | | | | | nt | | | | | | | | EMC | | | | | | | | require | | | | | | | | ments, | | | | | | | | & | | | | | | | | guideli | | | | | | | | nes | | | | | | | | to | | | | | | | | commodi | | | | | | | | ty | | | | | | | | supplie | | | | | | | | r. | | | | +---------+---------+---------+---------+---------+---------+---------+ | | | | *[Platf | | | | | | | | orm | | | | | | | | Develop | | | | | | | | ment | | | | | | | | and | | | | | | | | Under | | | | | | | | body | | | | | | | | Design | | | | | | | | Progres | | | | | | | | sion]{. | | | | | | | | underli | | | | | | | | ne}* | | | | +---------+---------+---------+---------+---------+---------+---------+ | | TSC | UN V1 | Review | L | S | E | | | | | Ford | | | | | | | | EMC | | | | | | | | require | | | | | | | | ments | | | | | | | | and | | | | | | | | Guideli | | | | | | | | nes. | | | | | | | | Identif | | | | | | | | y | | | | | | | | & | | | | | | | | clarify | | | | | | | | any | | | | | | | | conflic | | | | | | | | ts | | | | | | | | or | | | | | | | | ambigui | | | | | | | | ties. | | | | | | | | \[EMCR: | | | | | | | | 2.3\] | | | | +---------+---------+---------+---------+---------+---------+---------+ | | TSC | UN V0 | Review | L/E | S | S | | | | | content | | | | | | | | s | | | | | | | | of eSOW | | | | | | | | - EMC | | | | | | | | Attachm | | | | | | | | ent | | | | | | | | and | | | | | | | | agree | | | | | | | | content | | | | | | | |. | | | | | | | | Any | | | | | | | | conflic | | | | | | | | ts | | | | | | | | to be | | | | | | | | resolve | | | | | | | | d | | | | | | | | before | | | | | | | | TA\'s | | | | | | | | Signed | | | | | | | | / | | | | | | | | Supplie | | | | | | | | r | | | | | | | | on | | | | | | | | Board. | | | | | | | | | | | | | | | | (UN | | | | | | | | SEOBDS: | | | | | | | | Job\#1- | | | | | | | | 179 | | | | | | | | days) | | | | +---------+---------+---------+---------+---------+---------+---------+ | | UN V0 | UN V2 | Develop | L | S | E | | | | | HW | | | | | | | | DFMEA | | | | | | | | -- | | | | | | | | Identif | | | | | | | | y | | | | | | | | potenti | | | |