Survey and Cost Estimate Procedures
18 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the survey fee for the first three poles to be paid in advance?

  • Php 1,500.00
  • Php 5,000.00 (correct)
  • Php 10,000.00
  • Php 2,500.00
  • The approved cost estimates remain valid indefinitely regardless of any improvements in the area.

    False

    What additional fee is charged for each pole beyond the first three after the survey?

    Php 250.00

    The _____ must inform the requisitioner/consumer of the checklist of requirements based on their request.

    <p>District CWDO</p> Signup and view all the answers

    Which document must all requests have prepared?

    <p>Service Memo</p> Signup and view all the answers

    Match the following actions with their corresponding requirements:

    <p>Payment of Php 1,500.00 = Updated cost estimate without a new survey Service Memo preparation = District CWDO or IC3 Survey fee payment = First three poles Cost estimate forwarding = To the implementing office (ASD)</p> Signup and view all the answers

    Consumers are informed of the progress of their request by the CPD.

    <p>False</p> Signup and view all the answers

    What must the ASD secure before the release of the official cost estimate if additional payment is required?

    <p>Payment</p> Signup and view all the answers

    What is required for planned subdivisions?

    <p>Approved HLURB</p> Signup and view all the answers

    A government-issued ID is not required for the land owner of the Road Right of Way Title.

    <p>False</p> Signup and view all the answers

    What form is required to be signed for the Road Right of Way?

    <p>Road Right of Way Form</p> Signup and view all the answers

    The __________ shall evaluate the completeness of the requirements.

    <p>CPD</p> Signup and view all the answers

    What should the ASD submit for Transformer recommendation?

    <p>All of the above</p> Signup and view all the answers

    A tripartite agreement is needed if the establishment owner does not want to install a mother meter.

    <p>True</p> Signup and view all the answers

    What capacity percentage is generally recommended for transformer loading?

    <p>80%</p> Signup and view all the answers

    After the survey is conducted, the CPD shall prepare the __________ sheet.

    <p>staking</p> Signup and view all the answers

    Match each requirement with its description:

    <p>Letter of Intent = Indicates the consumer's request Signed Road Right of Way Form = Legal document for land use Photocopy of Land Title = Proof of ownership for the road Approved Electrical Plan = Document for electrical installation approval</p> Signup and view all the answers

    What should be included when applying for a multimeter installation?

    <p>Both A and C</p> Signup and view all the answers

    Study Notes

    ### Requesting Survey and Cost Estimate

    • All requests for survey and cost estimate require a Service Memo prepared by the District CWDO or IC3.
    • The District CWDO must inform the consumer of the following:
      • Checklist of requirements based on request
      • Approved HLURB for planned subdivisions
      • Survey fee of Php 5,000.00 (exclusive of VAT) for the first three poles, payable before the survey
      • Additional fee of Php 250.00 (exclusive of VAT) per pole if more than three poles are recommended
      • Approved cost estimates are valid only for the applied year unless improvements require a new survey
      • A service fee of Php 1,500.00 (exclusive of VAT) is required for an updated cost estimate within the applied year if no new survey is needed
    • The ASD forwards the completed Service Memo to the CPD once payment is secured.
    • The CPD evaluates the completeness of the requirements, schedules the survey, and updates the Service Memo Database.
    • The CPD prepares the staking sheet and cost estimate after the survey, and updates the Service Memo Database.
    • The CPD forwards the approved cost estimate to the ASD for implementation.
    • The ASD informs the consumer of the progress and collects any additional payment required.

    New Connections, Line Extensions, and Pole Replacement/Transfer/Removal

    • New connection, line extension, and pole replacement/transfer/removal requests require a Service Memo prepared by the District CWDO or IC3.
    • The District CWDO must inform the consumer of the following:
      • Checklist of requirements based on request
      • Letter of Intent or LGU Resolution
      • Signed Road Right of Way Form
      • Photocopy of Land Title for the Road Right of Way
      • Photocopy of one (1) government-issued ID of the land owner of the Road Right of Way Title
      • Photocopy of one (1) government-issued ID of the consumer (account owner of kWh meter or authorized representative for private organization and government agency)
      • Duly notarized Special Power of Attorney / Sworn Statement / Secretary’s Certificate / Appointment for authorized representatives
      • Approved Electrical Plan
      • Approved HLURB for planned subdivisions
    • The ASD forwards the completed Service Memo to the CPD.
    • The CPD evaluates the completeness of the requirements, schedules the survey, and updates the Service Memo Database.
    • The CPD prepares the staking sheet and cost estimate after the survey, and updates the Service Memo Database.
    • The CPD forwards the approved cost estimate to the implementing office (ASD/TSD) for implementation.
    • The ASD/TSD informs the consumer of the progress and updates the Service Memo Database with payment information.

    ### Transformer Recommendation Request

    • Requests for a transformer recommendation are submitted to the CPD and must include the following:
      • Service Memo
      • Approved House Wiring Inspection Report
      • Pictures of the vicinity
      • Pictures of the tapping pole/pole number
    • The CPD evaluates the electrical plan and load to determine the transformer requirement based on the following:
      • Transformer loading is generally recommended at 80% of its total capacity.
      • Primary metering is required for consumers with a total connected load of 190 amperes and above (computed at 240v secondary - three or single-phase load).
      • Secondary metering (three- or single-phase load) is used for consumers with a total connected load above 90 Amps and below 190 Amps.
    • The CPD forwards the approved Transformer Recommendation to the TSD for implementation.
    • The TSD informs the consumer of the progress.
    • The ASD updates the Service Memo Database with payment information.

    ### Multimeter Installation

    • If an establishment owner refuses to install a mother meter under their name, the occupant applying for the electric connection needs to execute a tripartite agreement. CPD recommends a mother meter if no agreement is submitted by the establishment owner.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    This quiz covers the procedures for requesting surveys and cost estimates, including the necessary documentation, fees, and processes involved. Learn about the roles of the District CWDO, ASD, and CPD in handling these requests. This is essential for understanding compliance in subdivision planning.

    More Like This

    Survey Follow-Up Procedures Quiz
    10 questions
    Regulation 9: Cargo Ship Radio Surveys
    10 questions
    Survey and Cost Estimate Procedures
    18 questions
    Survey Procedures in Nigeria
    50 questions
    Use Quizgecko on...
    Browser
    Browser