Engineering Surveys: Basic Procedures and Types
20 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

The process of obtaining data needed for the planning and design of an engineering project is known as ______

Design Data Surveys

A topographic survey is employed at the ______ stage to identify the topography of the site for multiple purposes

Design Data Surveys

Establishment of ______ is the process of setting horizontal and vertical controls

Controls

Control points are used as reference in establishing construction points on the ______ site

<p>project</p> Signup and view all the answers

A ______ survey is employed at the design data surveys stage to identify the topography of the site for multiple purposes

<p>topographic</p> Signup and view all the answers

RMA 9 Construction Surveys Layout or stakeout the construction points on the construction site. Layout line and grade for ______ surveys. As-built survey to determine the actual features of the construction compared to the design/plan.

<p>route</p> Signup and view all the answers

RMA 11 Route Surveys A route survey is a data collection operation to determine the route of a proposed roadway, railway or any linear ______.

<p>utilities</p> Signup and view all the answers

RMA 13 Route Surveys Cut and fill ______.

<p>surveys</p> Signup and view all the answers

RMA 14 Sewer Construction Sanitary Sewer Collects residential and industrial liquid waste Storm Sewer Collects runoff from ______.

<p>rainfall</p> Signup and view all the answers

RMA 18 Quantity and Final Survey As-built survey is conducted to document the actual and final result of the project and provide a check against the planned layout proposed in the project ______.

<p>design</p> Signup and view all the answers

The process of obtaining data needed for the planning and design of an engineering project is known as ______

<p>Design Data Surveys</p> Signup and view all the answers

Route Surveys Cut and fill ______.

<p>quantities</p> Signup and view all the answers

Route Surveys A route survey is a data collection operation to determine the route of a proposed roadway, railway or any linear ______.

<p>feature</p> Signup and view all the answers

Quantity and Final Survey As-built survey is conducted to document the actual and final result of the project and provide a check against the planned layout proposed in the project ______.

<p>design</p> Signup and view all the answers

Establishment of ______ is the process of setting horizontal and vertical controls

<p>Controls</p> Signup and view all the answers

RMA 8 Preliminary Surveys Land Use and Ownership Analysis Environmental Impact Assessment Regulatory Compliance Review Potential Risks Assessment Stakeholder engagement Utilities Assessment RMA 9 Construction Surveys Layout or stakeout the construction points on the construction site. Layout line and grade for route s. As-built ______ to determine the actual features of the construction compared to the design/plan. RMA 10 Types of Engineering Surveys Route Surveys Sewer Construction Highway Construction Pipeline Construction Bridge and Culvert Construction Building Construction Quantity and Final Survey RMA 11 Route Surveys A route ______ is a data collection operation to determine the route of a proposed roadway, railway or any linear utilities. RMA Source: https://jvrland______s.com/route-/ 12 Route Surveys Layout of horizontal and vertical curves Source: https://www.researchgate.net/figure/e-Relation-between-roadwayreverse-curve-L-C-S-and-roadside-spiraled-curve-roadway_fig5_325093750

<p>survey</p> Signup and view all the answers

<p>surveys</p> Signup and view all the answers

RMA 14 Sewer Construction Sanitary Sewer Collects residential and industrial liquid waste Storm Sewer Collects runoff from rainfall Source: https://www.plowmancraven.co.uk/services/line-and-level-______s/

<p>survey</p> Signup and view all the answers

RMA 15 Pipeline Construction Layout of proposed pipeline routes Source: https://www.rti.eu/en/civil-engineering/rohrleitungsbau/

<p>survey</p> Signup and view all the answers

RMA 16 Bridge and Culvert Construction Highest order of accuracy requirement for engineering survey layouts Preliminary survey covers boreholes drilled for foundation investigation Requires re-establishment of horizontal and vertical controls for final footing design Source: https://lahuriyaconstruction.com/canal-and-bridge-survey/

<p>surveys</p> Signup and view all the answers