Podcast
Questions and Answers
What is the survey fee for the first three poles?
What is the survey fee for the first three poles?
The approved cost estimates are valid for multiple years unless improvements in the area occur.
The approved cost estimates are valid for multiple years unless improvements in the area occur.
False
What must all requests for survey and cost estimates include?
What must all requests for survey and cost estimates include?
A SERVICE MEMO prepared by the District CWDO or IC3.
If a consumer requests an updated cost estimate within the applied year, the service fee is __________ exclusive of VAT.
If a consumer requests an updated cost estimate within the applied year, the service fee is __________ exclusive of VAT.
Signup and view all the answers
What is required for planned subdivisions?
What is required for planned subdivisions?
Signup and view all the answers
Match the following terms with their descriptions:
Match the following terms with their descriptions:
Signup and view all the answers
An additional fee of Php 250.00 per pole is charged when more than three poles are recommended after the survey.
An additional fee of Php 250.00 per pole is charged when more than three poles are recommended after the survey.
Signup and view all the answers
What must be forwarded to the CPD after securing the required payment?
What must be forwarded to the CPD after securing the required payment?
Signup and view all the answers
Which document is required for a land owner of the Road Right of Way Title?
Which document is required for a land owner of the Road Right of Way Title?
Signup and view all the answers
The CPD is responsible for conducting the survey of the requested requirements.
The CPD is responsible for conducting the survey of the requested requirements.
Signup and view all the answers
What is required from authorized representatives in addition to a government-issued ID?
What is required from authorized representatives in addition to a government-issued ID?
Signup and view all the answers
The approved _____ plan is essential for processing electrical installations.
The approved _____ plan is essential for processing electrical installations.
Signup and view all the answers
Match the required documents with their corresponding purpose:
Match the required documents with their corresponding purpose:
Signup and view all the answers
Which of the following actions is NOT part of the responsibilities of the TSD?
Which of the following actions is NOT part of the responsibilities of the TSD?
Signup and view all the answers
A tripartite agreement is needed if the establishment owner refuses to install a mother meter under their name.
A tripartite agreement is needed if the establishment owner refuses to install a mother meter under their name.
Signup and view all the answers
For consumers whose total connected load is below 90 Amps, what type of metering is implemented?
For consumers whose total connected load is below 90 Amps, what type of metering is implemented?
Signup and view all the answers
CPD shall forward the approved Transformer _____ to the implementing office for action.
CPD shall forward the approved Transformer _____ to the implementing office for action.
Signup and view all the answers
What is the general recommendation for transformer loading?
What is the general recommendation for transformer loading?
Signup and view all the answers
Study Notes
Requesting a Survey and Cost Estimate for Existing/Non-Existing Establishments
- Submit a SERVICE MEMO prepared by the District CWDO or IC3.
- Include a checklist of requirements based on your request.
- For planned subdivisions, an approved HLURB is required.
- Survey fee of Php 5,000.00, excluding VAT, for the first three poles must be paid before the survey starts.
- If more than three poles are recommended, an additional fee of Php 250.00, excluding VAT, per pole will be added to the total cost.
- Approved cost estimates are valid only for the current year unless there are changes that require a new survey.
- If an updated cost estimate within the same year is needed without a new survey, a service fee of Php 1,500.00 excluding VAT, needs to be paid.
Requesting a Survey and Cost Estimate for New Connections
- Submit a SERVICE MEMO prepared by the District CWDO or IC3.
- Include a checklist of requirements based on your request.
- Submit a Letter of Intent or LGU Resolution, a Signed Road Right of Way Form, a Photocopy of Land Title for the Road Right of Way, a Photocopy of One (1) Government-Issued ID of the Landowner of Road Right of Way Title, and a Photocopy of One (1) Government-Issued ID of the Consumer (Account Owner of kWh Meter or Authorized Representative for Private Organization and Government Agency).
- For authorized representatives, a duly notarized Special Power of Attorney/Sworn Statement/Secretary’s Certificate/Appointment is required.
- Include an approved Electrical Plan, and an approved HLURB for planned subdivisions is required.
- The ASD will forward the SERVICE MEMO and attached documents to the CPD for evaluation.
- The CPD will schedule the survey and update the Service Memo Database.
- After the survey, the CPD will prepare the staking sheet and cost estimate and update the Service Memo Database.
- The CPD will forward the GM's approved cost estimate to the implementation office, the ASD/TSD, for further action.
- The ASD/TSD will inform the consumer about the request's progress and update the Service Memo Database for payment.
Transformer Recommendations
- Submit the request with the attached documents for Transformer recommendation to the CPD. The documents must include: a copy of the blueprint electrical plan, the service memo, an approved House Wiring Inspection Report, pictures of the vicinity, pictures of the tapping pole/pole number.
- If the establishment owner refuses to install a mother meter, the occupant applying for the electric connection needs to execute a tripartite agreement. If no agreement is submitted, the CPD will automatically recommend a mother meter.
- The CPD will evaluate the approved electrical plan based on the declared load to calculate the transformer requirement. The general recommendation for transformer loading is 80% of its total capacity.
- Primary metering will be implemented for consumers with a total connected load of 190 Amps or above, calculated at 240v secondary (three or single-phase load).
- Secondary metering will be implemented for consumers with a total connected load between 90 Amps and 190 Amps (three or single-phase load).
- The CPD will forward the approved Transformer Recommendation to the implementation office, the TSD, for further action.
- The TSD will inform the consumer of the request's progress.
- The ASD will update the Service Memo Database for payment from the requisitioner/consumer as stated in the cost estimate.
- The TSD will update the Service Memo Database on the activity's progress.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
This quiz covers the procedures for requesting surveys and cost estimates for both existing and new establishments. Learn about the necessary documentation, fees involved, and requirements for planned subdivisions and connections. Understand how to navigate the approval and payment processes for a smooth application experience.