EASY What is the primary objective of the furnace purge during the startup of a steam boiler?
EASY What is the primary objective of the furnace purge during the startup of a steam boiler?
What is the recommended procedure for warming up a single boiler steam heating system according to ASME VI?
What is the recommended procedure for warming up a single boiler steam heating system according to ASME VI?
What is the purpose of opening the boiler steam outlet valve prior to firing the boiler during a simultaneous warm-up?
What is the purpose of opening the boiler steam outlet valve prior to firing the boiler during a simultaneous warm-up?
What is the recommended resource for guidelines on starting, warming, and cutting in steam boilers?
What is the recommended resource for guidelines on starting, warming, and cutting in steam boilers?
Signup and view all the answers
What is the primary concern when starting a steam boiler?
What is the primary concern when starting a steam boiler?
Signup and view all the answers
In a single power boiler plant, what type of valve is typically used at the outlet of the boiler?
In a single power boiler plant, what type of valve is typically used at the outlet of the boiler?
Signup and view all the answers
What is the term for the piping downstream of the header stop valve?
What is the term for the piping downstream of the header stop valve?
Signup and view all the answers
What is the purpose of warming up the steam lines and headers before placing a boiler in service?
What is the purpose of warming up the steam lines and headers before placing a boiler in service?
Signup and view all the answers
What should be done with steam traps when the steam lines are warmed up?
What should be done with steam traps when the steam lines are warmed up?
Signup and view all the answers
What should be done to the superheater drains or vents during boiler startup?
What should be done to the superheater drains or vents during boiler startup?
Signup and view all the answers
Why should the water column and gauge glass be blown down and tested?
Why should the water column and gauge glass be blown down and tested?
Signup and view all the answers
What should be done with the boiler until the operating control reaches its cut-out point?
What should be done with the boiler until the operating control reaches its cut-out point?
Signup and view all the answers
What is the purpose of the try lever and pop tests?
What is the purpose of the try lever and pop tests?
Signup and view all the answers
What is the primary purpose of a steam header in a steam system?
What is the primary purpose of a steam header in a steam system?
Signup and view all the answers
Why is it important to warm the steam header with the boiler stop, header stop, and drain valves open?
Why is it important to warm the steam header with the boiler stop, header stop, and drain valves open?
Signup and view all the answers
What happens to the steam entering the cold steam piping during warm-up?
What happens to the steam entering the cold steam piping during warm-up?
Signup and view all the answers
What is the purpose of low point drains in a steam system?
What is the purpose of low point drains in a steam system?
Signup and view all the answers
What is the recommended procedure for warming a steam boiler and its steam piping simultaneously?
What is the recommended procedure for warming a steam boiler and its steam piping simultaneously?
Signup and view all the answers
What is the purpose of opening the boiler drum vent during startup?
What is the purpose of opening the boiler drum vent during startup?
Signup and view all the answers
Why is it important to raise the water temperature and pressure slowly during startup?
Why is it important to raise the water temperature and pressure slowly during startup?
Signup and view all the answers
What should be done with the drum vent valve when the boiler pressure reaches 15 to 20 kPa?
What should be done with the drum vent valve when the boiler pressure reaches 15 to 20 kPa?
Signup and view all the answers
Why should the steam line low point drains be pinched back during startup?
Why should the steam line low point drains be pinched back during startup?
Signup and view all the answers
What should be done with the firing rate after the boiler has warmed up and is steaming?
What should be done with the firing rate after the boiler has warmed up and is steaming?
Signup and view all the answers
MEDIUM What should be done with the steam traps when the steam lines are warmed up?
MEDIUM What should be done with the steam traps when the steam lines are warmed up?
Signup and view all the answers
Why should the superheater drains or vents be kept open during boiler startup?
Why should the superheater drains or vents be kept open during boiler startup?
Signup and view all the answers
What should be done with the water column and gauge glass during boiler startup?
What should be done with the water column and gauge glass during boiler startup?
Signup and view all the answers
What should be done with the boiler during startup?
What should be done with the boiler during startup?
Signup and view all the answers
What is the purpose of performing the try lever and pop tests?
What is the purpose of performing the try lever and pop tests?
Signup and view all the answers
What is the primary purpose of the simultaneous warm-up procedure in a steam boiler?
What is the primary purpose of the simultaneous warm-up procedure in a steam boiler?
Signup and view all the answers
According to ASME VII, how can a high-pressure steam plant comprised of a single power boiler be warmed up?
According to ASME VII, how can a high-pressure steam plant comprised of a single power boiler be warmed up?
Signup and view all the answers
What is the purpose of preparing the steam piping system before starting a steam boiler?
What is the purpose of preparing the steam piping system before starting a steam boiler?
Signup and view all the answers
What is the name of the valve typically used at the outlet of a single power boiler?
What is the name of the valve typically used at the outlet of a single power boiler?
Signup and view all the answers
Why is it important to warm up the steam lines and headers before placing a boiler in service?
Why is it important to warm up the steam lines and headers before placing a boiler in service?
Signup and view all the answers
What is the term for the piping downstream of the header stop valve in a steam system?
What is the term for the piping downstream of the header stop valve in a steam system?
Signup and view all the answers
What resource is recommended for guidelines on starting, warming, and cutting in steam boilers?
What resource is recommended for guidelines on starting, warming, and cutting in steam boilers?
Signup and view all the answers
What should be done with the steam lines during the warm-up period of a steam boiler?
What should be done with the steam lines during the warm-up period of a steam boiler?
Signup and view all the answers
What is the primary objective of warming up the steam header with the boiler stop, header stop, and drain valves open?
What is the primary objective of warming up the steam header with the boiler stop, header stop, and drain valves open?
Signup and view all the answers
What is the purpose of opening the superheater vent during boiler preparation?
What is the purpose of opening the superheater vent during boiler preparation?
Signup and view all the answers
What should be done with the low point drains during the simultaneous warm-up procedure?
What should be done with the low point drains during the simultaneous warm-up procedure?
Signup and view all the answers
What is the recommended procedure for raising the water temperature and pressure during startup?
What is the recommended procedure for raising the water temperature and pressure during startup?
Signup and view all the answers
What should be done with the firing rate after the boiler has warmed up and is steaming?
What should be done with the firing rate after the boiler has warmed up and is steaming?
Signup and view all the answers
Why is it important to inspect the boiler frequently during the warm-up period?
Why is it important to inspect the boiler frequently during the warm-up period?
Signup and view all the answers
What should be done with the boiler control switch after the boiler has reached its operating pressure?
What should be done with the boiler control switch after the boiler has reached its operating pressure?
Signup and view all the answers
What is the purpose of opening the main steam shutoff valve during the simultaneous warm-up procedure?
What is the purpose of opening the main steam shutoff valve during the simultaneous warm-up procedure?
Signup and view all the answers
Why is it important to close the drum vent valve when the boiler pressure reaches 15 to 20 kPa?
Why is it important to close the drum vent valve when the boiler pressure reaches 15 to 20 kPa?
Signup and view all the answers
What should be done with the steam trap bypass lines during the simultaneous warm-up procedure?
What should be done with the steam trap bypass lines during the simultaneous warm-up procedure?
Signup and view all the answers
What is the purpose of blowing down the water column and gauge glass during boiler startup?
What is the purpose of blowing down the water column and gauge glass during boiler startup?
Signup and view all the answers
Why should the superheater drains or vents be kept open during boiler startup?
Why should the superheater drains or vents be kept open during boiler startup?
Signup and view all the answers
What should be done with the steam traps after the steam lines are warmed up?
What should be done with the steam traps after the steam lines are warmed up?
Signup and view all the answers
Why is it important to stay with the boiler until the operating control reaches its cut-out point?
Why is it important to stay with the boiler until the operating control reaches its cut-out point?
Signup and view all the answers
What is the purpose of performing the try lever and pop tests?
What is the purpose of performing the try lever and pop tests?
Signup and view all the answers
What is the primary purpose of ASME VI Recommended Rules for the Care and Operation of Heating Boilers?
What is the primary purpose of ASME VI Recommended Rules for the Care and Operation of Heating Boilers?
Signup and view all the answers
What is the primary advantage of simultaneous warm-up of a steam boiler and its steam piping system?
What is the primary advantage of simultaneous warm-up of a steam boiler and its steam piping system?
Signup and view all the answers
What is the primary concern when warming up a steam piping system?
What is the primary concern when warming up a steam piping system?
Signup and view all the answers
What is the purpose of the header stop valve in a steam system?
What is the purpose of the header stop valve in a steam system?
Signup and view all the answers
According to ASME VII, how can a high-pressure steam plant comprised of multiple power boilers be warmed up?
According to ASME VII, how can a high-pressure steam plant comprised of multiple power boilers be warmed up?
Signup and view all the answers
What is the primary purpose of preparing the steam piping system before starting a steam boiler?
What is the primary purpose of preparing the steam piping system before starting a steam boiler?
Signup and view all the answers
What is the recommended procedure for warming up a steam boiler and its steam piping system according to ASME VI?
What is the recommended procedure for warming up a steam boiler and its steam piping system according to ASME VI?
Signup and view all the answers
What is the primary purpose of warming up the steam lines and headers before placing a boiler in service?
What is the primary purpose of warming up the steam lines and headers before placing a boiler in service?
Signup and view all the answers
What is the primary purpose of opening the boiler drum vent during startup?
What is the primary purpose of opening the boiler drum vent during startup?
Signup and view all the answers
What is the recommended procedure for raising the water temperature and pressure during startup?
What is the recommended procedure for raising the water temperature and pressure during startup?
Signup and view all the answers
What is the purpose of the simultaneous warm-up procedure in a steam boiler?
What is the purpose of the simultaneous warm-up procedure in a steam boiler?
Signup and view all the answers
What should be done with the steam trap bypass lines during the simultaneous warm-up procedure?
What should be done with the steam trap bypass lines during the simultaneous warm-up procedure?
Signup and view all the answers
Why is it important to inspect the boiler frequently during the warm-up period?
Why is it important to inspect the boiler frequently during the warm-up period?
Signup and view all the answers
What is the purpose of the low point drains in a steam system?
What is the purpose of the low point drains in a steam system?
Signup and view all the answers
What should be done with the firing rate after the boiler has warmed up and is steaming?
What should be done with the firing rate after the boiler has warmed up and is steaming?
Signup and view all the answers
What is the purpose of preparing the steam plant auxiliaries before startup?
What is the purpose of preparing the steam plant auxiliaries before startup?
Signup and view all the answers
Why is it important to close the drum vent valve when the boiler pressure reaches 15 to 20 kPa?
Why is it important to close the drum vent valve when the boiler pressure reaches 15 to 20 kPa?
Signup and view all the answers
What should be done with the boiler control switch after the boiler has reached its operating pressure?
What should be done with the boiler control switch after the boiler has reached its operating pressure?
Signup and view all the answers
Study Notes
Safe Startup of a Steam Boiler
- Monitor all aspects of startup, including furnace purge, ignition, and main burner light off.
- Follow boiler manufacturer operating procedures and site-specific standard operating procedures.
Preparing Steam Piping System
- Warm up steam lines and headers before placing boilers in service to prevent water hammer.
- Consider how plant steam lines will be warmed up, then prepare the steam piping system to be warm, dry, and ready to go online.
Simultaneous Warm-Up
- Open boiler steam outlet valve prior to firing the boiler and keep it open during warm-up.
- Warm up steam header with boiler stop, header stop, and drain valves open.
- Condensate that forms will be removed by low point drains, steam traps, and steam trap bypass lines.
Independent Warm-Up
- Leave boiler stop valve closed until boiler reaches operating pressure.
- Open stop valve slowly and warm up header.
- Ensure trap bypasses, header drain valves, and other related drain valves are opened during this procedure.
Steam Boiler and Steam Piping Simultaneous Warm-Up Procedure
- Prepare steam plant auxiliaries, including boiler feed pump, condensate return system, and others.
- Check all steam system valves are correctly lined up.
- Open low point system drains to release condensate and open trap bypasses where they exist.
- Review manufacturer recommendations for burner and boiler startup.
- Open main steam shutoff valve and boiler drum vent.
- Ensure boiler control switch is in the “off” position and main disconnect switch is closed.
- Light pilot burner (if applicable) and open main test firing valve.
- Place boiler on low fire and turn boiler control switch to the “on” or “start” position.
- Raise water temperature and pressure slowly to prevent thermal shock and uneven expansion.
- Perform operating control and safety limit checks during warm-up.
- Inspect boiler frequently during warm-up and observe burner operation.
- Close drum vent valve when boiler pressure reaches 15 to 20 kPa.
- Close trap bypasses and place steam traps in service when steam lines are warmed up.
- Follow warm-up instructions of boiler manufacturer and site-specific procedures.
- Blow down water column and gauge glass to ensure connections are clear and level is correct.
- Test low water cut-offs by opening drains on water column and low water cut-off float cage.
- Stay with boiler until operating control reaches its cut-out point and shuts off burner at set pressure.
- Check safety valve for evidence of simmering and perform try lever and pop tests.
- Enter required information in the log book.
Safe Startup of a Steam Boiler
- Monitor all aspects of startup, including furnace purge, ignition, and main burner light off.
- Follow boiler manufacturer operating procedures and site-specific standard operating procedures.
Preparing Steam Piping System
- Warm up steam lines and headers before placing boilers in service to prevent water hammer.
- Consider how plant steam lines will be warmed up, then prepare the steam piping system to be warm, dry, and ready to go online.
Simultaneous Warm-Up
- Open boiler steam outlet valve prior to firing the boiler and keep it open during warm-up.
- Warm up steam header with boiler stop, header stop, and drain valves open.
- Condensate that forms will be removed by low point drains, steam traps, and steam trap bypass lines.
Independent Warm-Up
- Leave boiler stop valve closed until boiler reaches operating pressure.
- Open stop valve slowly and warm up header.
- Ensure trap bypasses, header drain valves, and other related drain valves are opened during this procedure.
Steam Boiler and Steam Piping Simultaneous Warm-Up Procedure
- Prepare steam plant auxiliaries, including boiler feed pump, condensate return system, and others.
- Check all steam system valves are correctly lined up.
- Open low point system drains to release condensate and open trap bypasses where they exist.
- Review manufacturer recommendations for burner and boiler startup.
- Open main steam shutoff valve and boiler drum vent.
- Ensure boiler control switch is in the “off” position and main disconnect switch is closed.
- Light pilot burner (if applicable) and open main test firing valve.
- Place boiler on low fire and turn boiler control switch to the “on” or “start” position.
- Raise water temperature and pressure slowly to prevent thermal shock and uneven expansion.
- Perform operating control and safety limit checks during warm-up.
- Inspect boiler frequently during warm-up and observe burner operation.
- Close drum vent valve when boiler pressure reaches 15 to 20 kPa.
- Close trap bypasses and place steam traps in service when steam lines are warmed up.
- Follow warm-up instructions of boiler manufacturer and site-specific procedures.
- Blow down water column and gauge glass to ensure connections are clear and level is correct.
- Test low water cut-offs by opening drains on water column and low water cut-off float cage.
- Stay with boiler until operating control reaches its cut-out point and shuts off burner at set pressure.
- Check safety valve for evidence of simmering and perform try lever and pop tests.
- Enter required information in the log book.
Safe Startup of a Steam Boiler
- Monitor all aspects of startup, including furnace purge, ignition, and main burner light off.
- Follow boiler manufacturer operating procedures and site-specific standard operating procedures.
Preparing Steam Piping System
- Warm up steam lines and headers before placing boilers in service to prevent water hammer.
- Consider how plant steam lines will be warmed up, then prepare the steam piping system to be warm, dry, and ready to go online.
Simultaneous Warm-Up
- Open boiler steam outlet valve prior to firing the boiler and keep it open during warm-up.
- Warm up steam header with boiler stop, header stop, and drain valves open.
- Condensate that forms will be removed by low point drains, steam traps, and steam trap bypass lines.
Independent Warm-Up
- Leave boiler stop valve closed until boiler reaches operating pressure.
- Open stop valve slowly and warm up header.
- Ensure trap bypasses, header drain valves, and other related drain valves are opened during this procedure.
Steam Boiler and Steam Piping Simultaneous Warm-Up Procedure
- Prepare steam plant auxiliaries, including boiler feed pump, condensate return system, and others.
- Check all steam system valves are correctly lined up.
- Open low point system drains to release condensate and open trap bypasses where they exist.
- Review manufacturer recommendations for burner and boiler startup.
- Open main steam shutoff valve and boiler drum vent.
- Ensure boiler control switch is in the “off” position and main disconnect switch is closed.
- Light pilot burner (if applicable) and open main test firing valve.
- Place boiler on low fire and turn boiler control switch to the “on” or “start” position.
- Raise water temperature and pressure slowly to prevent thermal shock and uneven expansion.
- Perform operating control and safety limit checks during warm-up.
- Inspect boiler frequently during warm-up and observe burner operation.
- Close drum vent valve when boiler pressure reaches 15 to 20 kPa.
- Close trap bypasses and place steam traps in service when steam lines are warmed up.
- Follow warm-up instructions of boiler manufacturer and site-specific procedures.
- Blow down water column and gauge glass to ensure connections are clear and level is correct.
- Test low water cut-offs by opening drains on water column and low water cut-off float cage.
- Stay with boiler until operating control reaches its cut-out point and shuts off burner at set pressure.
- Check safety valve for evidence of simmering and perform try lever and pop tests.
- Enter required information in the log book.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Description
Learn the essential steps to safely start up a steam boiler, including furnace purge, ignition, and main burner light off. Understand the ignition sequence and importance of following manufacturer and site-specific procedures.