Site Survey Report for MEI634
34 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the current status of the building for Electrical Interlocking (EI) and Interlocking Panel System (IPS)?

  • Completed
  • Not Applicable
  • Partially Completed
  • Under Construction (correct)
  • Will the railway use an existing room for Electrical Interlocking (EI) or a new room?

  • Existing Room
  • New Room (correct)
  • Both
  • None of the above
  • On which floor is the Electrical Interlocking (EI) room planned?

  • Ground Floor
  • Third Floor
  • Second Floor
  • First Floor (correct)
  • Is the electrical work inside the Electrical Interlocking (EI) room, such as installing lights, switchboards, exhaust fans, and sealing fans, completed?

    <p>Pending (A)</p> Signup and view all the answers

    What is the current status of the Relay Room in terms of completion?

    <p>Under Construction (C)</p> Signup and view all the answers

    What is the employee code of the person who conducted the site survey?

    <p>912194 (A)</p> Signup and view all the answers

    What is the name of the station being surveyed?

    <p>VINDHYACHAL (D)</p> Signup and view all the answers

    Which zone does the station VINDHYACHAL belong to?

    <p>NCR (B)</p> Signup and view all the answers

    What is the availability of storage space for equipment at the site?

    <p>NOT AVAILABILITY (C)</p> Signup and view all the answers

    Who is the contact person from the railway side?

    <p>RAVI KUMAR (B)</p> Signup and view all the answers

    What type of labor is available at the site for unloading?

    <p>LABOUR (B)</p> Signup and view all the answers

    What is the mobile number of the contractor's contact person?

    <p>8789309764 (A)</p> Signup and view all the answers

    Are the SM room and Relay room in the same building?

    <p>No (D)</p> Signup and view all the answers

    What type of installation is being discussed?

    <p>Distributed (C)</p> Signup and view all the answers

    What is the status of the FTOT / CT rack erection?

    <p>Not completed (B)</p> Signup and view all the answers

    What is the status of the 110V DC supply extension from Central to Goomty?

    <p>Not applicable (B)</p> Signup and view all the answers

    What is the current status of the outdoor trenching and cable laying work?

    <p>On hold (C)</p> Signup and view all the answers

    What is the status of the signal foundation works?

    <p>In progress (A)</p> Signup and view all the answers

    What is the estimated time to complete the outdoor works?

    <p>Not confirmed (C)</p> Signup and view all the answers

    Where is the 110V DC supply extended to?

    <p>Goomty (A)</p> Signup and view all the answers

    Which of the following is mentioned as a concern with the outdoor works?

    <p>Signal cable not reaching the building (C)</p> Signup and view all the answers

    What is the proposed number of earth pits required according to the plan?

    <p>12 NOS (C)</p> Signup and view all the answers

    What type of earthing arrangement is mentioned in the document?

    <p>Ring Earth (B)</p> Signup and view all the answers

    Which cables' layout is still undecided between the Relay Room and SM Room?

    <p>Redundant U/G OFC (C)</p> Signup and view all the answers

    What additional information regarding the building is specified in the document?

    <p>Complete building measurements (B)</p> Signup and view all the answers

    What is mentioned about the photos related to the site in the document?

    <p>All required photos are available and attached (D)</p> Signup and view all the answers

    What is the minimum height requirement for the Relay room as stated?

    <p>2700 mm (D)</p> Signup and view all the answers

    Which of the following measurements is incorrect for the Relay room's height?

    <p>Minimum height is exactly 2700 mm (D)</p> Signup and view all the answers

    What type of diagram must be drawn for the Relay room?

    <p>A line diagram with dimensions (D)</p> Signup and view all the answers

    What is required alongside the diagram for the Lightning arrester?

    <p>Required quantity and placements (C)</p> Signup and view all the answers

    How many Lightning arresters are required based on the information provided?

    <p>2 (B)</p> Signup and view all the answers

    What is essential to note about obstructions in the Relay room's height measurement?

    <p>All obstructions must be removed before measurement. (D)</p> Signup and view all the answers

    Which rooms need to be included in the line diagram of floor plans?

    <p>Relay room, IPS room, and Total Building plan (C)</p> Signup and view all the answers

    What additional structural feature must be measured alongside room dimensions?

    <p>Height from floor to roof (B)</p> Signup and view all the answers

    Study Notes

    Site Survey Report for MEI634

    • Employee Code: 912194
    • Employee Name: MANEESH KUMAR SONI
    • Designation: SERVICE ENGINEER
    • Date of Survey: 02/01/2025
    • Station Name: VINDHYACHAL
    • Station Code: BDL
    • Division: PRAYAGRAJ
    • Zone: NCR

    Site Details

    • Railway Contact Person: RAVI KUMAR (9794830059)
    • Contractor Contact Person: SOUKAT ALI (8789309764)
    • Storage Space: Availability not specified
    • Equipment Unloading: Labour availability unknown
    • Existing/Proposed Medha El Installations: None nearby
    • SM Room and Relay Room: Located in the same building (Ground Floor)
    • Building Status (El & IPS): Under construction
    • Relay Room Use: Existing relay room not used for El, new room to be used
    • SM Room Status: New room
    • El Room Floor: 1st Floor
    • Relay Room Completion Status: Under construction
    • Electrical Work Completion: Pending
    • Electricity Availability: Pending for relay room (centralized), distributed to goomtys
    • Track View: Front side
    • FTOT/CT Rack Erection: Not completed
    • Outdoor Trenching and Cable Laying Status: Pending
    • Time to Complete Outdoor Works: Unknown
    • Outdoor Contractor: SOUKAT ALI (8789309764)
    • Contractor Name: THAKUR INTERPRIZES

    Floor Plans

    • Room Dimensions: Measured accurately, including windows, pillars, doors, and ventilation
    • Line Diagrams: Floor plans for Relay room, IPS room, Battery room, SM room, MT room, and total building, along with measurements, drawn and attached
    • FTOT/CT Rack Placement: Located in Relay room floor plan, drawn and attached
    • Lightning Arrester: 2 required
    • Relay Room to IPS Distance: Both on 1st floor, within a short distance
    • Relay Room Height: > 2634mm (with obstructions measured), 2634mm (CIU, Double ladder)

    Other Details

    • Earthing: Ring earthing possible
    • Signaling Cable Distance & Soil Details: Distance from proposed earth pit locations and soil type are unknown
    • Number of Earthing Pits: 12
    • Redundant U/G OFC and Power Cables: Not decided
    • Complete Building Measurements: Length, width, and height are needed
    • Photos of Site: Available, and attached (Relay, IPS, Battery, SM, MT rooms, lightening arrester placement, and earthing locations)

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    BIROHE Site Survey Report PDF

    Description

    This report details the site survey conducted for MEI634 at the Vindhyachal station on February 1, 2025. It includes information on personnel, building status, and electrical work completion. Key contacts and installation details are also provided to assist in further planning.