Summary

This document is a site survey report for a project, likely in the engineering field. It details station information, contact persons, equipment availability, and construction progress, along with specific questions about the site.

Full Transcript

Sheet2 SITE SURVEY REPORT FOR MEI634 Emp Code: 912194 Emp Name: MANEESH KUMAR SONI Designation: SERVICE ENGINEER Date of Survey:02/01/2025 SL.NO...

Sheet2 SITE SURVEY REPORT FOR MEI634 Emp Code: 912194 Emp Name: MANEESH KUMAR SONI Designation: SERVICE ENGINEER Date of Survey:02/01/2025 SL.NO DESCRIPTION DETAILS REMARKS STATION DETAILS -------- -------- 1 STATION NAME VINDHYACHAL 2 STATION CODE BDL 3 DIVISION NAME PRAYAGRAJ 4 ZONE NAME NCR SITE DETAILS -------- -------- 5 Details of contact person from Railways side (Name & Mobile number) RAVI KUMAR(RAILWAY) 9794830059 SOUKAT ALI(THAKUR 6 Details of contact person from Contractor (Name & Mobile number) 8789309764 INTERPRIZES) 7 Availability of storage space for the equipment NOT AVAILABILITY 8 Possibility for unloading our system (Availability of labour or Crane ) LABOUR 9 Nearby stations where Medha EI is installed / being installed / expected to be installed NO Only Ground Whether SM room and Relay room are in same building. FLOOR S.M 10 SAME BUILDING If not then mention the distance between SM & Relay room ROOM & Duty Room 11 Status of building for EI & IPS (under construction or completed) Under Construction 12 Confirm whether railway will use existing relay room for EI or New room NEW ROOM 13 Confirm whether panel room (SM room) is new room or existed room NEW ROOM 14 EI room is planned in which floor (like ground floor or above) 1ST FLOOR Relay room floor is completed or pending. 15 Under Construction (if pending then Confirm the time of completion) Electrical work (lights, switch board, exhaust fans, sealing fans) inside EI room is completed or 16 pending ALL PENDIG (if pending Confirm the time of completion) 17 Confirm availability of electricity to relay room (If centralized) & End Goomtys (if distributed). DISTRIBUTED 18 Position of tracks with reference to the SM - Front side viewing or Back side viewing FRONT SIDE VIEWING 19 FTOT / CT Rack erection was completed or not NOT COMPLETED 20 If distributed type of installation then check for below points -------- -------- a) 110V DC Supply extended from Central to Goomty (or) NA b) Individual IPS provided at Goomty NA OUT DOOR WORKS DETAILS -------- -------- SIGNAL YET CABLE NOT FOUNDATION REACHED TO AND 21 Status of outdoor trenching and cable laying work and signal foundations works BUILDING, TRUCHING TRUCHING ALSO PENDING WORK UNDER PROCESS 22 Time to be taken to complete the out door works NOT CONFIRM SOUKAT ALI(THAKUR 23 Outdoor contractor name and details with contact number. 8789309764 INTERPRIZES) FLOOR PLANS WITH DIMENSION DETAILS -------- -------- Room dimensions to be measured accurately (including window, pillar, doors and ventilation 24 MEASURED points, trenching works if any) 25 Draw a line diagram of floor plan and give all measurements for Relay room, IPS DRAWN ATTACHED room, Battery room, SM room, MT room and Total Building plan ATTACHED, BUT FTOT 26 Draw a line diagram of floor plan for Relay room by locating the placements of FTOT / CT rack DRAWN RACK PLACEMENT NOT DRAWN Lightning arrester placement possibility with diagram along with required quantity of Lightning 27 2 NOS L/A REQUIRED arrester BOTH ARE 1ST FLOOR 28 Distance from Relay room to IPS room AND NEAR Measure the Relay room height (Floor to roof) it should be more than 2700mm. No obstructions 29 of roof beams should be there. MORE THAN =2634MM (CIU height 2224mm + Double ladder height 410mm = 2634mm). 30 Possibility for Earthing arrangements – (Ring / Perimetric Earth) RING EARTH Distance of the Signaling cables running U/G from proposed Earth pit locations & Soil details 31 BACK SIDE OF BUILDING (Made up soil / Platform) 32 No. of Earth Pits required and draw a line diagram of Earthing plan 12 NOS 33 Possibility of laying redundant U/G OFC and Power cables between Relay Room and SM Room NOT DECIDED 34 Complete building measurements (length width & height) Page 1 Sheet2 PHOTOS OF SITE -------- -------- 35 Photos of the Relay, IPS, Battery, SM & MT rooms AVAILABLE ATTACHED 36 Photos of building slab where the lightening arrester has to be placed and height from ground AVAILABLE ATTACHED 37 Photo of the place provided for earthing. AVAILABLE ATTACHED OTHER INFORMATION -------- -------- 38 39 SF-5716 (02) Page 2

Use Quizgecko on...
Browser
Browser