What must be done before starting work on the Laststufenschalter?
What must be done before starting work on the Laststufenschalter?
The maintenance training for the Laststufenschalter is not necessary.
The maintenance training for the Laststufenschalter is not necessary.
False
What is the purpose of the safety instructions provided in the manual?
What is the purpose of the safety instructions provided in the manual?
To prevent personal injuries and equipment damage.
The manual emphasizes the need for ________ personnel when performing work.
The manual emphasizes the need for ________ personnel when performing work.
Signup and view all the answers
Match the part names with their respective item's purpose or note:
Match the part names with their respective item's purpose or note:
Signup and view all the answers
What is the part number for the Reedkontakt?
What is the part number for the Reedkontakt?
Signup and view all the answers
What is the release date for the magnet?
What is the release date for the magnet?
Signup and view all the answers
What is the maximum allowable abbrand for the contact piece made of Wolfram?
What is the maximum allowable abbrand for the contact piece made of Wolfram?
Signup and view all the answers
Which statement is true regarding the supply of parts?
Which statement is true regarding the supply of parts?
Signup and view all the answers
The contact piece is made of copper.
The contact piece is made of copper.
Signup and view all the answers
The flexible line set M __________ is scheduled for replacement every 150,000.
The flexible line set M __________ is scheduled for replacement every 150,000.
Signup and view all the answers
Match the following terms with their definitions:
Match the following terms with their definitions:
Signup and view all the answers
What is the minimum measurement for the excenternocke for OLTC Type M until the delivery date of 31.03.2001?
What is the minimum measurement for the excenternocke for OLTC Type M until the delivery date of 31.03.2001?
Signup and view all the answers
What should be measured to check the excenternocke condition?
What should be measured to check the excenternocke condition?
Signup and view all the answers
What is the required measurement for the excenternocke for OLTC Type M starting from the delivery date of 01.04.2001?
What is the required measurement for the excenternocke for OLTC Type M starting from the delivery date of 01.04.2001?
Signup and view all the answers
What is the acceptable offset between the upper edge of the excenternocke and the upper edge of the pressure roll?
What is the acceptable offset between the upper edge of the excenternocke and the upper edge of the pressure roll?
Signup and view all the answers
Which of the following actions should be taken if the measured deflection is less than 1.3 mm?
Which of the following actions should be taken if the measured deflection is less than 1.3 mm?
Signup and view all the answers
What should be documented in the service report regarding deflection?
What should be documented in the service report regarding deflection?
Signup and view all the answers
What should be checked at the upper gear stage during maintenance?
What should be checked at the upper gear stage during maintenance?
Signup and view all the answers
What is the general inspection for the energy storage unit?
What is the general inspection for the energy storage unit?
Signup and view all the answers
The resting stroke must be at least 1 mm.
The resting stroke must be at least 1 mm.
Signup and view all the answers
What should be done before removing the load level switch cover?
What should be done before removing the load level switch cover?
Signup and view all the answers
What must be documented in the service report?
What must be documented in the service report?
Signup and view all the answers
The maximum wear on the block must be ≤ ______ mm.
The maximum wear on the block must be ≤ ______ mm.
Signup and view all the answers
Big shield rings must be inspected at every maintenance.
Big shield rings must be inspected at every maintenance.
Signup and view all the answers
What is the required measurement for the coupling when adjusting the resting stroke?
What is the required measurement for the coupling when adjusting the resting stroke?
Signup and view all the answers
The tightening torque for the M10 x 289 bolt is ______ Nm.
The tightening torque for the M10 x 289 bolt is ______ Nm.
Signup and view all the answers
What is the purpose of measuring the recess stroke?
What is the purpose of measuring the recess stroke?
Signup and view all the answers
What should be measured at both sides of the load switching device?
What should be measured at both sides of the load switching device?
Signup and view all the answers
The bolts used during coupling must be checked at every maintenance.
The bolts used during coupling must be checked at every maintenance.
Signup and view all the answers
The required thickness of the coating must be between ___ mm and ___ mm.
The required thickness of the coating must be between ___ mm and ___ mm.
Signup and view all the answers
What must be done if the coating measure is outside the required values?
What must be done if the coating measure is outside the required values?
Signup and view all the answers
What is the minimum outer diameter for the guide rods?
What is the minimum outer diameter for the guide rods?
Signup and view all the answers
The inner diameter of the bushings should be greater than 10.5 mm.
The inner diameter of the bushings should be greater than 10.5 mm.
Signup and view all the answers
What should be used to measure the distance between the latch and the switch crank?
What should be used to measure the distance between the latch and the switch crank?
Signup and view all the answers
What is the required distance from the upper edge of the roller to the lower edge of the rivet?
What is the required distance from the upper edge of the roller to the lower edge of the rivet?
Signup and view all the answers
What must the top edge of the eccentric cam be in relation to the top edge of the pressure roller?
What must the top edge of the eccentric cam be in relation to the top edge of the pressure roller?
Signup and view all the answers
What should be observed when replacing the pressure rollers?
What should be observed when replacing the pressure rollers?
Signup and view all the answers
What is the further procedure if the overlap measured is ≥ 1.0 mm?
What is the further procedure if the overlap measured is ≥ 1.0 mm?
Signup and view all the answers
What should be done when the overlap is between 1.0 mm and 0.5 mm?
What should be done when the overlap is between 1.0 mm and 0.5 mm?
Signup and view all the answers
What further procedure is required if the overlap is < 0.5 mm?
What further procedure is required if the overlap is < 0.5 mm?
Signup and view all the answers
What is the further action required if there is 1 loose bushing?
What is the further action required if there is 1 loose bushing?
Signup and view all the answers
What should be done if there are 2 loose bushings in the same sector?
What should be done if there are 2 loose bushings in the same sector?
Signup and view all the answers
What should be done if there are more than 2 loose bushings in the same sector?
What should be done if there are more than 2 loose bushings in the same sector?
Signup and view all the answers
What is the procedure for checking for cracks in the bushing area?
What is the procedure for checking for cracks in the bushing area?
Signup and view all the answers
The provided instructions can be ignored if one is experienced.
The provided instructions can be ignored if one is experienced.
Signup and view all the answers
What are the potential consequences of not following safety guidelines during work?
What are the potential consequences of not following safety guidelines during work?
Signup and view all the answers
The instruction manual requires knowledge corresponding to a training at MR for _____ on the switch.
The instruction manual requires knowledge corresponding to a training at MR for _____ on the switch.
Signup and view all the answers
What is the date of the document regarding replacement parts?
What is the date of the document regarding replacement parts?
Signup and view all the answers
Which item is required for the Stufenschalter type M?
Which item is required for the Stufenschalter type M?
Signup and view all the answers
Match the following parts with their corresponding identifiers:
Match the following parts with their corresponding identifiers:
Signup and view all the answers
Which of the following is an item included in the spare parts for the M 500/600?
Which of the following is an item included in the spare parts for the M 500/600?
Signup and view all the answers
The contact piece has a maximum burn-off of 2 mm.
The contact piece has a maximum burn-off of 2 mm.
Signup and view all the answers
What is the significance of protecting the components with shielding plates?
What is the significance of protecting the components with shielding plates?
Signup and view all the answers
The contact piece for M(S) 300 consists of _____ pieces.
The contact piece for M(S) 300 consists of _____ pieces.
Signup and view all the answers
Match the following items with their descriptions:
Match the following items with their descriptions:
Signup and view all the answers
What should be prepared for the exchange of guide plates for switches made before 2002?
What should be prepared for the exchange of guide plates for switches made before 2002?
Signup and view all the answers
What is the recommended maximum wear on the block during maintenance?
What is the recommended maximum wear on the block during maintenance?
Signup and view all the answers
What must be checked regarding the fastening screws during maintenance?
What must be checked regarding the fastening screws during maintenance?
Signup and view all the answers
What is the required tightening torque for fastening screws of movable switching and auxiliary contacts?
What is the required tightening torque for fastening screws of movable switching and auxiliary contacts?
Signup and view all the answers
The maximum impermissible play for the bushings in the pull-in slide is 1 mm.
The maximum impermissible play for the bushings in the pull-in slide is 1 mm.
Signup and view all the answers
Which components must be checked for a proper fit and break during maintenance?
Which components must be checked for a proper fit and break during maintenance?
Signup and view all the answers
What is the required range for the rest stroke during maintenance?
What is the required range for the rest stroke during maintenance?
Signup and view all the answers
The tightening torque for the tension bolt M10 x 289 is _____ Nm.
The tightening torque for the tension bolt M10 x 289 is _____ Nm.
Signup and view all the answers
What should be ensured before removing the last stage switch cover?
What should be ensured before removing the last stage switch cover?
Signup and view all the answers
What must be checked regarding the energy storage components?
What must be checked regarding the energy storage components?
Signup and view all the answers
What flaw must be documented if it occurs during maintenance inspections?
What flaw must be documented if it occurs during maintenance inspections?
Signup and view all the answers
What should be the role of the technician regarding the large shielding rings during maintenance?
What should be the role of the technician regarding the large shielding rings during maintenance?
Signup and view all the answers
What is the minimum required length of the eccentric cam (Maß X) for OLTC type M until delivery date 31.03.2001?
What is the minimum required length of the eccentric cam (Maß X) for OLTC type M until delivery date 31.03.2001?
Signup and view all the answers
What should the length of the eccentric cam (Maß X) be for OLTC type M after the delivery date of 01.04.2001?
What should the length of the eccentric cam (Maß X) be for OLTC type M after the delivery date of 01.04.2001?
Signup and view all the answers
What is the maximum offset allowable between the top edge of the eccentric cam and the top edge of the pressure roller?
What is the maximum offset allowable between the top edge of the eccentric cam and the top edge of the pressure roller?
Signup and view all the answers
What further measures should be taken if the deflection (Durchfederung) is less than 1.3 mm?
What further measures should be taken if the deflection (Durchfederung) is less than 1.3 mm?
Signup and view all the answers
What actions should be taken if the deflection is less than 0.5 mm?
What actions should be taken if the deflection is less than 0.5 mm?
Signup and view all the answers
What is the required measurement procedure for measuring the deflection of the DHK?
What is the required measurement procedure for measuring the deflection of the DHK?
Signup and view all the answers
What is the material number for the exchange contact blade for DHK type M500/600?
What is the material number for the exchange contact blade for DHK type M500/600?
Signup and view all the answers
Match the following DHK actions with their conditions:
Match the following DHK actions with their conditions:
Signup and view all the answers
The _____ must be installed for restricted operation when the deflection is less than 0.5 mm.
The _____ must be installed for restricted operation when the deflection is less than 0.5 mm.
Signup and view all the answers
What is the overlap measurement in mm for no necessary actions?
What is the overlap measurement in mm for no necessary actions?
Signup and view all the answers
What action should be taken if the overlap is between 1.0 and 0.5 mm?
What action should be taken if the overlap is between 1.0 and 0.5 mm?
Signup and view all the answers
If the overlap is less than 0.5 mm, what is the recommended action?
If the overlap is less than 0.5 mm, what is the recommended action?
Signup and view all the answers
It is unnecessary to take action if there is one loose bushing.
It is unnecessary to take action if there is one loose bushing.
Signup and view all the answers
What should be done if there are two loose bushings in the same sector?
What should be done if there are two loose bushings in the same sector?
Signup and view all the answers
What should you do if there are more than two loose bushings in the same sector?
What should you do if there are more than two loose bushings in the same sector?
Signup and view all the answers
What is the first check to perform if cracks are found in the threaded bushings?
What is the first check to perform if cracks are found in the threaded bushings?
Signup and view all the answers
What should be used to check if threaded bushings are loose?
What should be used to check if threaded bushings are loose?
Signup and view all the answers
The required overlay must be between _____ mm and _____ mm.
The required overlay must be between _____ mm and _____ mm.
Signup and view all the answers
What is the minimum outer diameter for guide rods?
What is the minimum outer diameter for guide rods?
Signup and view all the answers
What is the maximum inner diameter for the bushings?
What is the maximum inner diameter for the bushings?
Signup and view all the answers
The overlay measurement can be adjusted by using different diameters of pressure rolls.
The overlay measurement can be adjusted by using different diameters of pressure rolls.
Signup and view all the answers
What should be done if the overlay measurement is not within specified limits?
What should be done if the overlay measurement is not within specified limits?
Signup and view all the answers
What should the distance between the pin and switch arm be measured with?
What should the distance between the pin and switch arm be measured with?
Signup and view all the answers
What will happen if the specified overlay is not achievable by replacing the pressure rolls?
What will happen if the specified overlay is not achievable by replacing the pressure rolls?
Signup and view all the answers
What color should bushings be according to the delivery date between 01.04.2001 and 31.10.2006?
What color should bushings be according to the delivery date between 01.04.2001 and 31.10.2006?
Signup and view all the answers
How often should the pressure rolls be renewed?
How often should the pressure rolls be renewed?
Signup and view all the answers
The distance from the upper edge of the roller to the lower edge of the rivet must be at least _____ mm.
The distance from the upper edge of the roller to the lower edge of the rivet must be at least _____ mm.
Signup and view all the answers
For delivery after 01.11.2006, the roller diameter must be provided as a _____ mm measurement.
For delivery after 01.11.2006, the roller diameter must be provided as a _____ mm measurement.
Signup and view all the answers
Parts from different versions of pressure devices can be combined.
Parts from different versions of pressure devices can be combined.
Signup and view all the answers
It is safe for unqualified personnel to perform the maintenance work on the Laststufenschalter.
It is safe for unqualified personnel to perform the maintenance work on the Laststufenschalter.
Signup and view all the answers
Which of the following must be heeded before beginning work on the Laststufenschalter?
Which of the following must be heeded before beginning work on the Laststufenschalter?
Signup and view all the answers
What is essential to read completely before starting maintenance on the Laststufenschalter?
What is essential to read completely before starting maintenance on the Laststufenschalter?
Signup and view all the answers
What is the purpose of the 'Entlüftungsschraube' in the parts list?
What is the purpose of the 'Entlüftungsschraube' in the parts list?
Signup and view all the answers
What type of seal is used between the Stufenschalter head and oil vessel flange?
What type of seal is used between the Stufenschalter head and oil vessel flange?
Signup and view all the answers
Which of the following items is listed as a spare part for the Stufenschalter?
Which of the following items is listed as a spare part for the Stufenschalter?
Signup and view all the answers
What is the start date for the Reedkontakt?
What is the start date for the Reedkontakt?
Signup and view all the answers
What is the protection tube for the M500 / 600?
What is the protection tube for the M500 / 600?
Signup and view all the answers
What type of contact is used for the M(S) 300 / 350?
What type of contact is used for the M(S) 300 / 350?
Signup and view all the answers
What materials are the contact pieces made from?
What materials are the contact pieces made from?
Signup and view all the answers
What is the maximum burn-off length for the Wolfram contact piece?
What is the maximum burn-off length for the Wolfram contact piece?
Signup and view all the answers
Which of the following components is included in the reserve contact set for M I 301/351?
Which of the following components is included in the reserve contact set for M I 301/351?
Signup and view all the answers
The Gießharzkontaktschale has been in use since 1975.
The Gießharzkontaktschale has been in use since 1975.
Signup and view all the answers
The part number for the 1 Satz Kontaktträger M500 is ______.
The part number for the 1 Satz Kontaktträger M500 is ______.
Signup and view all the answers
What is the noted lifespan of a new contact shell?
What is the noted lifespan of a new contact shell?
Signup and view all the answers
Match the following components to their specifications:
Match the following components to their specifications:
Signup and view all the answers
What is required for switching leading plates for switches made before 2002?
What is required for switching leading plates for switches made before 2002?
Signup and view all the answers
What is the required range for the overhang measurement?
What is the required range for the overhang measurement?
Signup and view all the answers
Which of the following dimensions are required for the outer diameter of guide rods? (Select all that apply)
Which of the following dimensions are required for the outer diameter of guide rods? (Select all that apply)
Signup and view all the answers
Which components need to be renewed if the desired overhang measurement is not achievable? (Select all that apply)
Which components need to be renewed if the desired overhang measurement is not achievable? (Select all that apply)
Signup and view all the answers
Excenternocke and adjustable rollers can be combined regardless of construction versions if they fit dimensionally.
Excenternocke and adjustable rollers can be combined regardless of construction versions if they fit dimensionally.
Signup and view all the answers
What must be checked if the measurement of the distance from the upper edge of the roller to the lower edge of the rivet on the winding sled does not meet the requirement?
What must be checked if the measurement of the distance from the upper edge of the roller to the lower edge of the rivet on the winding sled does not meet the requirement?
Signup and view all the answers
The height of the Excenternocke should be ___ mm lower than the upper edge of the adjustable roller.
The height of the Excenternocke should be ___ mm lower than the upper edge of the adjustable roller.
Signup and view all the answers
What must be done when exchanging adjustable rollers?
What must be done when exchanging adjustable rollers?
Signup and view all the answers
Match the following parts with their required values:
Match the following parts with their required values:
Signup and view all the answers
What should be done when the overlap between the arc chamber and the groove of the lower guiding plate is equal to 1.0 mm or greater?
What should be done when the overlap between the arc chamber and the groove of the lower guiding plate is equal to 1.0 mm or greater?
Signup and view all the answers
What action should be taken if the overlap is less than 0.5 mm?
What action should be taken if the overlap is less than 0.5 mm?
Signup and view all the answers
How many loose bushings require replacement of the guiding plate during the next maintenance?
How many loose bushings require replacement of the guiding plate during the next maintenance?
Signup and view all the answers
If there is one loose bushing, no measures are necessary.
If there is one loose bushing, no measures are necessary.
Signup and view all the answers
The recommended action for more than 2 loose bushings in the same sector is _____ for a maximum of 6 months.
The recommended action for more than 2 loose bushings in the same sector is _____ for a maximum of 6 months.
Signup and view all the answers
What should you ensure if cracks are present in the area of the threaded bushings?
What should you ensure if cracks are present in the area of the threaded bushings?
Signup and view all the answers
Match the following criteria with their recommended actions:
Match the following criteria with their recommended actions:
Signup and view all the answers
What should be checked for the upper gear stage during maintenance?
What should be checked for the upper gear stage during maintenance?
Signup and view all the answers
What are the general checks for energy storage?
What are the general checks for energy storage?
Signup and view all the answers
It is necessary to ensure voltage-free conditions before removing the load tap switch cover.
It is necessary to ensure voltage-free conditions before removing the load tap switch cover.
Signup and view all the answers
The residual stroke must be at least _____ during maintenance.
The residual stroke must be at least _____ during maintenance.
Signup and view all the answers
What is the maximum wear on the block allowed during maintenance?
What is the maximum wear on the block allowed during maintenance?
Signup and view all the answers
Which of the following requires inspection at every maintenance?
Which of the following requires inspection at every maintenance?
Signup and view all the answers
What dimensions should the upper gear stage pin bearing have?
What dimensions should the upper gear stage pin bearing have?
Signup and view all the answers
Ensure the fastening of the switching and auxiliary contacts is _____ during maintenance.
Ensure the fastening of the switching and auxiliary contacts is _____ during maintenance.
Signup and view all the answers
What must be documented in the service report during maintenance?
What must be documented in the service report during maintenance?
Signup and view all the answers
Match the maintenance tasks with their corresponding requirements:
Match the maintenance tasks with their corresponding requirements:
Signup and view all the answers
What is the minimum measure X for OLTC Type M with the pushing device until the delivery date of 31.03.2001?
What is the minimum measure X for OLTC Type M with the pushing device until the delivery date of 31.03.2001?
Signup and view all the answers
What is the minimum measure X for OLTC Type M after the delivery date of 01.04.2001?
What is the minimum measure X for OLTC Type M after the delivery date of 01.04.2001?
Signup and view all the answers
What is the acceptable offset between the top edge of the excenter cam and the top edge of the pushing roller?
What is the acceptable offset between the top edge of the excenter cam and the top edge of the pushing roller?
Signup and view all the answers
To adjust the height of the excenter, you can add or remove ________ under and above the excenter.
To adjust the height of the excenter, you can add or remove ________ under and above the excenter.
Signup and view all the answers
If the spring deflection is less than 1.3 mm, what additional measures should be followed?
If the spring deflection is less than 1.3 mm, what additional measures should be followed?
Signup and view all the answers
What should be documented in the service report about the minimum spring deflection?
What should be documented in the service report about the minimum spring deflection?
Signup and view all the answers
What material is needed for the renewal of fasteners for the lead contact housing?
What material is needed for the renewal of fasteners for the lead contact housing?
Signup and view all the answers
Match the inspections to their required actions:
Match the inspections to their required actions:
Signup and view all the answers
Study Notes
Introduction
- Emphasizes the risk of personal injury, damages, or functional failures due to insufficiently trained personnel.
- Stresses the importance of adhering to safety, hazard, and operational guidelines specific to the MR control switch type.
- Requires complete reading of the instruction manual before commencing work.
- Assumes prior training from MR on maintenance tasks for the specified load step switch type.
Spare Parts for Step Switches
- A detailed parts list is provided with specific items categorized under Type M.
- Each entry includes a description, part number, quantity, and additional remarks.
Key Spare Parts and Their Specifications
- Vent Screw: 1 piece, part number 401823:00.
- Pressure Relief Valve: 1 piece, part number 090373:02; retrofitting possible starting from 11/84.
- Plyamid Gaskets: Various types listed with specific part numbers for different applications.
- O-Rings: Essential for sealing, with multiple options based on size and application introduced from July 1993.
- Storage Springs: Different specifications for varying sectors, with force values ranging from 221N to 577N depending on configuration.
Assembly Components
- Sliding Components: Include items like spring slides and drive shafts, with specific tolerances noted for optimal operation.
- Mounting and Connection: Include O-rings for joins, flanges, and potted components, ensuring secure electrical connections.
Maintenance and Inspection Kits
- An assortment of small parts for switch inspection and repair is acknowledged for proper maintenance protocol.
- Recommendations for specific kits structured by model variations (M, MD).
Miscellaneous Components
- Adapts to industry standards (DIN 34) preserving all rights for technical documentation.
- Replacement contact wires with note on operational longevity and recommendations for service.
Final Notes
- Warranty terms are influenced by proper usage and installation.
- The instruction emphasizes the importance of recognizing when parts should be replaced or upgraded based on manufacturing dates and designs.### Replacement Parts for Step Switches
- Contact Piece (Tungsten) compatible with M 500, max erosion of 4mm, 1 set consists of 16 pieces.
- Contact Piece (Copper) compatible with M (S) 300, 1 set consists of 16 pieces.
- Set of contact carriers M500 and M300, each set consists of 1 sector and made with a tab, valid till 11.12.95.
- Contact rail consists of 2 pieces (1 set) designed for 3 sectors.
Components and Sectors
- Replacement parts include screws, disc springs, and securing plates, all necessary for contact changes.
- Set includes shielding plates and cover plates, differing between M300/350 and M500/600 types, with 3 sets required for 3 sectors.
- Resin contact bowl introduced for service in 1975; contact shells for M-D require replacement after specific use cycles.
Wiring and Connectors
- Flexible leads for M350/500 are changed every 800,000 cycles and must have crimp connections without busbars.
- Long flexible leads and connection cables included in the assembly, requiring replacement based on operational cycles.
- The reserve contacts set for models M I 301/351 consists of both copper and tungsten options with associated wiring components.
Maintenance and Inspections
- Regular maintenance is crucial for equipment longevity; includes both visual inspections and detailed checks of wear.
- Specific inspections include checking bearing tightness, energy storage system components, switch segments, and general condition reviews.
- Ensure voltage is disconnected before any inspections or maintenance procedures.
Special Instructions and Tools
- Detailed instructions for replacing guide plates for switches manufactured before 2002.
- Important tools include drill templates, stripping tools, and crimping pliers for effective component replacement.
- Essential documentation stresses secure practices, especially regarding voltage safety during alterations to switch components.
Final Notes
- Adhere to DIN regulations concerning technical documentation and rights preservation.
- Safety warnings emphasize assessing for electrical hazards, particularly before accessing or modifying electrical devices.### Voltage-Free Status Verification Before Removing Cover
- Ensure voltage-free status by measuring at all six terminal connections against ground potential (chassis) using a digital multimeter in AC and DC modes.
- Open the cover of the terminal box by loosening four screws.
Maintenance of Shield Rings (for > 170 kV)
- Check shield rings during every maintenance session and document findings in the service report.
- Large shield rings are used in load changeover applications with a minimum of > 123 kV insulation distance.
- Inspect attachment points for damages like cracks or breaks, and report any findings with photographs to specified email.
Marking and Installing Guide Rods
- Mark the guide rods of the spring and tension sleds using a center punch on the side A of the load switch insert.
- Apply identical markings at the energy storage housing height consistent with the guide rods.
- Reinstall guide rods in the exact position and orientation during reassembly.
Wear and Play Measurement for Guide Rods and Bushings
- Measure wear and play in guide rods and bushings using calipers; record values in the service report.
- Established diameter threshold values:
- Outer diameter of guide rods must be ≥ 13.5 mm (energy storage) and ≥ 9.5 mm (tension sled).
- Inner diameter of bushings must be ≤ 14.5 mm (tension sled) and ≤ 10.5 mm (spring sled).
- Maximum play allowed in bushings and guide rods is 1 mm.
Special Note on Bushings
- Bushings labeled with Tenifer 5 (dark silver-gray) installed in spring sleds between 01.12.1998 and 10.05.2001 must be replaced during every maintenance.
- Bushings delivered beyond this period should only be replaced if they exceed the specified wear limits.
Setting the Remaining Stroke
- Measure the remaining stroke on both sides using calipers; it must be at least 1 mm.
- Process involves turning the drive shaft until the trigger fits the latch, without activating the latch.
Measuring Block Wear
- Maximum wear at the block must not exceed 0.6 mm, determined by comparing reference measures.
- For OILTAP® R, RM, and T types, the greatest wear from both sides should be assessed regardless of operation mode.
Overrun Measurement for OILTAP® M
- Overrun should be maintained between 0.7 mm and 2.2 mm; adjust by replacing pressure rollers if outside of the required range.
- Ensure correct positioning and adjustments through specified tooling during measurement.
Special Tools for Overrun Measurement
- Tools needed include:
- Feeler gauge (Material number: 110510:75)
- Adjustment device (Material number: 63079700)
General Maintenance Guidelines
- If adjusting overrun does not meet target after roller replacement, prioritize replacing guide rods and bushings to minimize play before recalibrating with suitable rollers.
- Document all measurements and installations meticulously for maintenance records.
Introduction
- Emphasizes the risk of personal injury, damages, or functional failures due to insufficiently trained personnel.
- Stresses the importance of adhering to safety, hazard, and operational guidelines specific to the MR control switch type.
- Requires complete reading of the instruction manual before commencing work.
- Assumes prior training from MR on maintenance tasks for the specified load step switch type.
Spare Parts for Step Switches
- A detailed parts list is provided with specific items categorized under Type M.
- Each entry includes a description, part number, quantity, and additional remarks.
Key Spare Parts and Their Specifications
- Vent Screw: 1 piece, part number 401823:00.
- Pressure Relief Valve: 1 piece, part number 090373:02; retrofitting possible starting from 11/84.
- Plyamid Gaskets: Various types listed with specific part numbers for different applications.
- O-Rings: Essential for sealing, with multiple options based on size and application introduced from July 1993.
- Storage Springs: Different specifications for varying sectors, with force values ranging from 221N to 577N depending on configuration.
Assembly Components
- Sliding Components: Include items like spring slides and drive shafts, with specific tolerances noted for optimal operation.
- Mounting and Connection: Include O-rings for joins, flanges, and potted components, ensuring secure electrical connections.
Maintenance and Inspection Kits
- An assortment of small parts for switch inspection and repair is acknowledged for proper maintenance protocol.
- Recommendations for specific kits structured by model variations (M, MD).
Miscellaneous Components
- Adapts to industry standards (DIN 34) preserving all rights for technical documentation.
- Replacement contact wires with note on operational longevity and recommendations for service.
Final Notes
- Warranty terms are influenced by proper usage and installation.
- The instruction emphasizes the importance of recognizing when parts should be replaced or upgraded based on manufacturing dates and designs.### Replacement Parts for Step Switches
- Contact Piece (Tungsten) compatible with M 500, max erosion of 4mm, 1 set consists of 16 pieces.
- Contact Piece (Copper) compatible with M (S) 300, 1 set consists of 16 pieces.
- Set of contact carriers M500 and M300, each set consists of 1 sector and made with a tab, valid till 11.12.95.
- Contact rail consists of 2 pieces (1 set) designed for 3 sectors.
Components and Sectors
- Replacement parts include screws, disc springs, and securing plates, all necessary for contact changes.
- Set includes shielding plates and cover plates, differing between M300/350 and M500/600 types, with 3 sets required for 3 sectors.
- Resin contact bowl introduced for service in 1975; contact shells for M-D require replacement after specific use cycles.
Wiring and Connectors
- Flexible leads for M350/500 are changed every 800,000 cycles and must have crimp connections without busbars.
- Long flexible leads and connection cables included in the assembly, requiring replacement based on operational cycles.
- The reserve contacts set for models M I 301/351 consists of both copper and tungsten options with associated wiring components.
Maintenance and Inspections
- Regular maintenance is crucial for equipment longevity; includes both visual inspections and detailed checks of wear.
- Specific inspections include checking bearing tightness, energy storage system components, switch segments, and general condition reviews.
- Ensure voltage is disconnected before any inspections or maintenance procedures.
Special Instructions and Tools
- Detailed instructions for replacing guide plates for switches manufactured before 2002.
- Important tools include drill templates, stripping tools, and crimping pliers for effective component replacement.
- Essential documentation stresses secure practices, especially regarding voltage safety during alterations to switch components.
Final Notes
- Adhere to DIN regulations concerning technical documentation and rights preservation.
- Safety warnings emphasize assessing for electrical hazards, particularly before accessing or modifying electrical devices.### Voltage-Free Status Verification Before Removing Cover
- Ensure voltage-free status by measuring at all six terminal connections against ground potential (chassis) using a digital multimeter in AC and DC modes.
- Open the cover of the terminal box by loosening four screws.
Maintenance of Shield Rings (for > 170 kV)
- Check shield rings during every maintenance session and document findings in the service report.
- Large shield rings are used in load changeover applications with a minimum of > 123 kV insulation distance.
- Inspect attachment points for damages like cracks or breaks, and report any findings with photographs to specified email.
Marking and Installing Guide Rods
- Mark the guide rods of the spring and tension sleds using a center punch on the side A of the load switch insert.
- Apply identical markings at the energy storage housing height consistent with the guide rods.
- Reinstall guide rods in the exact position and orientation during reassembly.
Wear and Play Measurement for Guide Rods and Bushings
- Measure wear and play in guide rods and bushings using calipers; record values in the service report.
- Established diameter threshold values:
- Outer diameter of guide rods must be ≥ 13.5 mm (energy storage) and ≥ 9.5 mm (tension sled).
- Inner diameter of bushings must be ≤ 14.5 mm (tension sled) and ≤ 10.5 mm (spring sled).
- Maximum play allowed in bushings and guide rods is 1 mm.
Special Note on Bushings
- Bushings labeled with Tenifer 5 (dark silver-gray) installed in spring sleds between 01.12.1998 and 10.05.2001 must be replaced during every maintenance.
- Bushings delivered beyond this period should only be replaced if they exceed the specified wear limits.
Setting the Remaining Stroke
- Measure the remaining stroke on both sides using calipers; it must be at least 1 mm.
- Process involves turning the drive shaft until the trigger fits the latch, without activating the latch.
Measuring Block Wear
- Maximum wear at the block must not exceed 0.6 mm, determined by comparing reference measures.
- For OILTAP® R, RM, and T types, the greatest wear from both sides should be assessed regardless of operation mode.
Overrun Measurement for OILTAP® M
- Overrun should be maintained between 0.7 mm and 2.2 mm; adjust by replacing pressure rollers if outside of the required range.
- Ensure correct positioning and adjustments through specified tooling during measurement.
Special Tools for Overrun Measurement
- Tools needed include:
- Feeler gauge (Material number: 110510:75)
- Adjustment device (Material number: 63079700)
General Maintenance Guidelines
- If adjusting overrun does not meet target after roller replacement, prioritize replacing guide rods and bushings to minimize play before recalibrating with suitable rollers.
- Document all measurements and installations meticulously for maintenance records.
Introduction
- Emphasizes the risk of personal injury, damages, or functional failures due to insufficiently trained personnel.
- Stresses the importance of adhering to safety, hazard, and operational guidelines specific to the MR control switch type.
- Requires complete reading of the instruction manual before commencing work.
- Assumes prior training from MR on maintenance tasks for the specified load step switch type.
Spare Parts for Step Switches
- A detailed parts list is provided with specific items categorized under Type M.
- Each entry includes a description, part number, quantity, and additional remarks.
Key Spare Parts and Their Specifications
- Vent Screw: 1 piece, part number 401823:00.
- Pressure Relief Valve: 1 piece, part number 090373:02; retrofitting possible starting from 11/84.
- Plyamid Gaskets: Various types listed with specific part numbers for different applications.
- O-Rings: Essential for sealing, with multiple options based on size and application introduced from July 1993.
- Storage Springs: Different specifications for varying sectors, with force values ranging from 221N to 577N depending on configuration.
Assembly Components
- Sliding Components: Include items like spring slides and drive shafts, with specific tolerances noted for optimal operation.
- Mounting and Connection: Include O-rings for joins, flanges, and potted components, ensuring secure electrical connections.
Maintenance and Inspection Kits
- An assortment of small parts for switch inspection and repair is acknowledged for proper maintenance protocol.
- Recommendations for specific kits structured by model variations (M, MD).
Miscellaneous Components
- Adapts to industry standards (DIN 34) preserving all rights for technical documentation.
- Replacement contact wires with note on operational longevity and recommendations for service.
Final Notes
- Warranty terms are influenced by proper usage and installation.
- The instruction emphasizes the importance of recognizing when parts should be replaced or upgraded based on manufacturing dates and designs.### Replacement Parts for Step Switches
- Contact Piece (Tungsten) compatible with M 500, max erosion of 4mm, 1 set consists of 16 pieces.
- Contact Piece (Copper) compatible with M (S) 300, 1 set consists of 16 pieces.
- Set of contact carriers M500 and M300, each set consists of 1 sector and made with a tab, valid till 11.12.95.
- Contact rail consists of 2 pieces (1 set) designed for 3 sectors.
Components and Sectors
- Replacement parts include screws, disc springs, and securing plates, all necessary for contact changes.
- Set includes shielding plates and cover plates, differing between M300/350 and M500/600 types, with 3 sets required for 3 sectors.
- Resin contact bowl introduced for service in 1975; contact shells for M-D require replacement after specific use cycles.
Wiring and Connectors
- Flexible leads for M350/500 are changed every 800,000 cycles and must have crimp connections without busbars.
- Long flexible leads and connection cables included in the assembly, requiring replacement based on operational cycles.
- The reserve contacts set for models M I 301/351 consists of both copper and tungsten options with associated wiring components.
Maintenance and Inspections
- Regular maintenance is crucial for equipment longevity; includes both visual inspections and detailed checks of wear.
- Specific inspections include checking bearing tightness, energy storage system components, switch segments, and general condition reviews.
- Ensure voltage is disconnected before any inspections or maintenance procedures.
Special Instructions and Tools
- Detailed instructions for replacing guide plates for switches manufactured before 2002.
- Important tools include drill templates, stripping tools, and crimping pliers for effective component replacement.
- Essential documentation stresses secure practices, especially regarding voltage safety during alterations to switch components.
Final Notes
- Adhere to DIN regulations concerning technical documentation and rights preservation.
- Safety warnings emphasize assessing for electrical hazards, particularly before accessing or modifying electrical devices.### Voltage-Free Status Verification Before Removing Cover
- Ensure voltage-free status by measuring at all six terminal connections against ground potential (chassis) using a digital multimeter in AC and DC modes.
- Open the cover of the terminal box by loosening four screws.
Maintenance of Shield Rings (for > 170 kV)
- Check shield rings during every maintenance session and document findings in the service report.
- Large shield rings are used in load changeover applications with a minimum of > 123 kV insulation distance.
- Inspect attachment points for damages like cracks or breaks, and report any findings with photographs to specified email.
Marking and Installing Guide Rods
- Mark the guide rods of the spring and tension sleds using a center punch on the side A of the load switch insert.
- Apply identical markings at the energy storage housing height consistent with the guide rods.
- Reinstall guide rods in the exact position and orientation during reassembly.
Wear and Play Measurement for Guide Rods and Bushings
- Measure wear and play in guide rods and bushings using calipers; record values in the service report.
- Established diameter threshold values:
- Outer diameter of guide rods must be ≥ 13.5 mm (energy storage) and ≥ 9.5 mm (tension sled).
- Inner diameter of bushings must be ≤ 14.5 mm (tension sled) and ≤ 10.5 mm (spring sled).
- Maximum play allowed in bushings and guide rods is 1 mm.
Special Note on Bushings
- Bushings labeled with Tenifer 5 (dark silver-gray) installed in spring sleds between 01.12.1998 and 10.05.2001 must be replaced during every maintenance.
- Bushings delivered beyond this period should only be replaced if they exceed the specified wear limits.
Setting the Remaining Stroke
- Measure the remaining stroke on both sides using calipers; it must be at least 1 mm.
- Process involves turning the drive shaft until the trigger fits the latch, without activating the latch.
Measuring Block Wear
- Maximum wear at the block must not exceed 0.6 mm, determined by comparing reference measures.
- For OILTAP® R, RM, and T types, the greatest wear from both sides should be assessed regardless of operation mode.
Overrun Measurement for OILTAP® M
- Overrun should be maintained between 0.7 mm and 2.2 mm; adjust by replacing pressure rollers if outside of the required range.
- Ensure correct positioning and adjustments through specified tooling during measurement.
Special Tools for Overrun Measurement
- Tools needed include:
- Feeler gauge (Material number: 110510:75)
- Adjustment device (Material number: 63079700)
General Maintenance Guidelines
- If adjusting overrun does not meet target after roller replacement, prioritize replacing guide rods and bushings to minimize play before recalibrating with suitable rollers.
- Document all measurements and installations meticulously for maintenance records.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
This quiz focuses on the crucial safety guidelines and warnings provided in the introduction section. Understanding these guidelines is essential for preventing personal injuries and damages during operations. Participants will learn about the importance of following safety protocols and the risks involved with neglecting them.