Production Planning and Control in Operations Management
9 Questions
0 Views

Production Planning and Control in Operations Management

Created by
@ReliableWoodland

Podcast Beta

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary focus of motion study?

  • Determining the best way to perform a task through motion analysis (correct)
  • Setting production standards and cost controls
  • Emphasizing wage incentives for workers
  • Training workers on various equipment and tools
  • What distinguishes time study from motion study?

  • Time study focuses more on methods and equipment rather than motions directly. (correct)
  • Time study involves more physical movements than motion study.
  • Time study is solely based on motion analysis.
  • Time study emphasizes training workers to follow determined methods.
  • What is essential before proceeding with time study?

  • Establishing wage incentives for workers
  • Setting production standards for cost control
  • Training workers on various tools and equipment
  • Standardizing the method and conditions of work (correct)
  • Why is the measurement of human effort considered a difficult job?

    <p>It requires a combination of scientific methods and industrial experience.</p> Signup and view all the answers

    What is necessary to eliminate in order to measure the time required to perform a job?

    <p>Standardizing other variables connected with the job</p> Signup and view all the answers

    Which aspect of a job must be standardized before proceeding with time study?

    <p>Method and conditions of work</p> Signup and view all the answers

    What does the use of scientific method in time study involve?

    <p>Experimentation, measurement, and elimination of variables in a job</p> Signup and view all the answers

    What is emphasized in time study as related to production standards?

    <p>Setting standards for cost purposes</p> Signup and view all the answers

    What are the variables connected with a job that need to be eliminated for time measurement?

    <p>Method of manufacture, tools and equipment, material, working conditions, worker concerned</p> Signup and view all the answers

    More Like This

    Planejamento Estratégico da Produção
    10 questions
    Planejamento Estratégico da Produção
    10 questions
    Gestion de production - Concepts clés
    31 questions
    Use Quizgecko on...
    Browser
    Browser