8.4 Product Requirement

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Which method is interested in capturing all the features of the system in the beginning?

  • Both methods
  • None of the methods
  • Iterative method
  • Waterfall method (correct)

What is the main reason for the requirement gathering phase?

  • To limit the freedom of choice of the designer
  • To obtain customer preferences
  • To reduce the cost and time required for product development
  • To avoid 'creeping featurism' (correct)

What are goals in the context of product requirement gathering?

  • Aspects of customer requirements which limit the freedom of choice of the system designer
  • Customer preferences to be considered so that the product can function within the given constraints
  • Additional information from the customer apart from product requirement description
  • Aspects of customer requirement which guide the system designer where freedom of choice exists (correct)

What are constraints in the context of product requirement gathering?

<p>Aspects of customer requirements which limit the freedom of choice of the system designer (B)</p> Signup and view all the answers

What should be avoided in the list of goals and constraints?

<p>Contradiction (B)</p> Signup and view all the answers

Flashcards are hidden until you start studying

More Like This

MOD 8.4
30 questions

MOD 8.4

HardierMeadow avatar
HardierMeadow
8.4
10 questions

8.4

EyeCatchingFoxglove avatar
EyeCatchingFoxglove
8.4 ALL WEATHER OPERATIONS
40 questions

8.4 ALL WEATHER OPERATIONS

GleefulPrairieDog1504 avatar
GleefulPrairieDog1504
8.4 ALL WEATHER OPERATIONS - Quiz
48 questions
Use Quizgecko on...
Browser
Browser