What is the priority for the provision of power factor improvement capacitors at traction substations?

  • Substations with the highest power consumption
  • Substations located near urban areas
  • Substations feeding large marshalling yards and where penalties for low power factor apply (correct)
  • Substations with the most recent technology
  • How is the average monthly power factor calculated?

  • By multiplying KWh and KVAh over a month
  • By subtracting KVAh from KWh and then averaging over a month
  • As the ratio of KWh to KVAh over a month (correct)
  • By dividing KVAh by total energy consumption over a month
  • What should be considered when planning the selection of KVAr rating for capacitors?

  • The distance of the substation from the central grid
  • The age of the existing transformers
  • The power factor trend observed over the past years
  • The guidelines issued by RDSO (correct)
  • What is required when total shut-down of EHV and 25 Kv supply becomes unavoidable?

    <p>Advance notice to Sr.DEE/DEE(TRD) with reasons for the shut-down</p> Signup and view all the answers

    What key aspect should be included in the operating instructions for grid and traction substations?

    <p>Procedure for carrying out switching operations</p> Signup and view all the answers

    What charge is applied when the power factor falls below a specified value?

    <p>Penalty for low power factor</p> Signup and view all the answers

    How is the Excess Energy calculated according to the given formula?

    <p>Excess Energy = TU (1 - CD/MD)</p> Signup and view all the answers

    What does the Minimum Guarantee typically represent in an agreement with the SEB?

    <p>A percentage of the capital cost invested by SEB</p> Signup and view all the answers

    What factor does the Billing Demand typically relate to?

    <p>Contract demand or actual maximum demand</p> Signup and view all the answers

    In case of excess over Contract Demand, what implication does it have for the units of energy charged?

    <p>They are charged at a higher tariff excluding FAC.</p> Signup and view all the answers

    What is the role of the Fuel Adjustment Charge (FAC)?

    <p>To account for variations in fuel costs and calorific values.</p> Signup and view all the answers

    What happens if the actual Maximum Demand exceeds the Contract Demand for a short period?

    <p>Proportionate units for the entire month are charged at a penal rate.</p> Signup and view all the answers

    What is the maximum allowable individual harmonic voltage distortion (Vn) at the point of supply?

    <p>3%</p> Signup and view all the answers

    What should be ensured regarding the Maximum Demand charged?

    <p>The addition of both trivector meters should not be taken as MD.</p> Signup and view all the answers

    What is the required action if the accuracy of the single set of meters is in doubt?

    <p>The Railway is entitled to ask for testing and certification.</p> Signup and view all the answers

    How should billing figures be determined when two sets of meters are provided?

    <p>Based on the average readings of both sets of meters.</p> Signup and view all the answers

    What is the minimum load factor often specified in agreements with SEBs?

    <p>30%</p> Signup and view all the answers

    Who should participate in taking the monthly meter readings?

    <p>Supply Authority representatives and Railway representatives.</p> Signup and view all the answers

    What additional information should be obtained during visits to grid sub-stations?

    <p>Daily maximum demand, power factor, and load factor.</p> Signup and view all the answers

    How often should the tariff charged for traction be reviewed?

    <p>Periodic reviews are necessary.</p> Signup and view all the answers

    What should be done with the meter card and printomaxigraph chart readings after taking meter readings?

    <p>They must be initialed by both parties' representatives.</p> Signup and view all the answers

    What is the role of harmonic analysis in voltage supply?

    <p>To ensure harmonic voltage distortion does not exceed specified limits.</p> Signup and view all the answers

    What is the formula used to calculate harmonic voltage distortion (Vn)?

    <p>$ rac{(V2)^2 + (V3)^2 + ... + (V13)^2}{V} \times 100$</p> Signup and view all the answers

    What is essential for the power supply for electric traction before it is actually utilized?

    <p>An agreement with the concerned Supply Authority</p> Signup and view all the answers

    What is the effect of emergency working on the maximum demand at sub-stations?

    <p>It may temporarily increase the maximum demand</p> Signup and view all the answers

    What methodological change has been agreed upon by the Central Electricity Authority regarding traction power charging?

    <p>Charging based on simultaneous maximum demand of connected sub-stations</p> Signup and view all the answers

    What factor should be carefully considered to minimize energy costs in Electric Traction?

    <p>The tariff structures of various state Electricity Boards</p> Signup and view all the answers

    How should contract demand for each sub-station be stipulated?

    <p>According to expected actual maximum demand to avoid extra charges</p> Signup and view all the answers

    What should be the notice period for altering Contract Demand according to the ideal agreement?

    <p>4 to 6 weeks</p> Signup and view all the answers

    Which statement about the tariff for electric traction is accurate?

    <p>Some states employ a complex tariff structure based on various parameters.</p> Signup and view all the answers

    What is one of the primary purposes of scrutinizing the Supply Authorities' bills?

    <p>To identify energy consumption discrepancies.</p> Signup and view all the answers

    Which item is NOT listed as part of the checks to be conducted before passing the bills?

    <p>Energy source verification</p> Signup and view all the answers

    What should be done if the minimum charge exceeds actual energy consumption?

    <p>Inform the Chief Electrical Engineer and operating Department.</p> Signup and view all the answers

    What is the purpose of the time schedule established with the Accounts Department?

    <p>To achieve prompt payment for rebate eligibility.</p> Signup and view all the answers

    Which of the following should be analyzed for significant departures?

    <p>Each new bill compared to earlier ones</p> Signup and view all the answers

    What must be correctly indicated on the bill according to the agreement?

    <p>The payee's full particulars</p> Signup and view all the answers

    Which practice is NOT recommended regarding panel charges?

    <p>Cutting panel charges during peak usage</p> Signup and view all the answers

    What must be confirmed about the maximum demand computation for billing?

    <p>It follows agreed method and does not include temporary increases.</p> Signup and view all the answers

    If there is a significant change in billing amounts, what should happen?

    <p>Analyze the new bill against previous records.</p> Signup and view all the answers

    What aspect of the billing process should be clearly documented?

    <p>Jointly issued detailed instructions before passing bills.</p> Signup and view all the answers

    What precaution should be taken to avoid a leading power factor when using power factor correcting equipment?

    <p>Use switched capacitors judiciously.</p> Signup and view all the answers

    In the event of an unavoidable shut-down of traction supply, who should the reasons for the shut-down be communicated to?

    <p>The operating department for scheduling.</p> Signup and view all the answers

    What is necessary for the planning of power factor improvement capacitors at traction substations?

    <p>Prioritize substations with low power factor costs.</p> Signup and view all the answers

    What is the expected approach for maintenance shutdowns at substations to avoid total interruptions?

    <p>Ensure sufficient backup systems are always available.</p> Signup and view all the answers

    What should be included in the detailed operating instructions for grid substations?

    <p>A comprehensive guide for switching operations.</p> Signup and view all the answers

    What is the significance of maintaining traction voltage between 25 KV and 27.5 KV at feeding posts?

    <p>It ensures the reliability of the power supply.</p> Signup and view all the answers

    Which of the following actions is recommended to enhance the reliability of the power supply for traction?

    <p>Conducting periodic meetings with Supply Authorities.</p> Signup and view all the answers

    When should the traction load be treated as essential according to the recommendations?

    <p>At all times to prevent disconnection.</p> Signup and view all the answers

    What is the recommended maximum frequency range that should be maintained in the supply system for traction?

    <p>48.5 Hz to 51.5 Hz</p> Signup and view all the answers

    What must be done regarding periodic reviews of power supply interruptions?

    <p>Causes should be ascertained and reported at the Divisional level.</p> Signup and view all the answers

    What is the role of effective liaison between Railway and Supply Authorities?

    <p>To ensure continuity and reliability of power supply.</p> Signup and view all the answers

    What is a key factor that can negatively impact railway traffic with respect to power supply?

    <p>Inconsistent liaison with power supply authorities.</p> Signup and view all the answers

    What should be done if there is no specific Agreement with the Supply Authority regarding power supply for electric traction?

    <p>Take urgent action to finalize the Agreement</p> Signup and view all the answers

    What action should be taken when emergency working leads to a temporary increase in maximum demand?

    <p>Negotiate with Supply Authorities to ignore the increase</p> Signup and view all the answers

    The method agreed upon by the Central Electricity Authority for charging Railways for traction power is based on which criteria?

    <p>Simultaneous maximum demand of contiguous substations</p> Signup and view all the answers

    What is a primary goal when stipulating contract demand for each sub-station?

    <p>Avoiding unnecessary payments for minimum guarantees</p> Signup and view all the answers

    Which factor should not be considered when evaluating tariffs charged for electric traction?

    <p>Annual fixed costs associated with maintenance</p> Signup and view all the answers

    Ideal notice period for altering contract demand should be set at?

    <p>4 to 6 weeks</p> Signup and view all the answers

    What variation in tariff structures is observed among different state Electricity Boards for electric traction?

    <p>Some states use a simplified flat rate, others opt for complex structures</p> Signup and view all the answers

    What is a critical aspect of measuring maximum demand for billing at traction substations?

    <p>Recording simultaneous maximum demand in contiguous substations</p> Signup and view all the answers

    Which of the following statements about emergency working at traction sub-stations is inaccurate?

    <p>It mandates an immediate review of the contrast agreement</p> Signup and view all the answers

    What is a necessary step before passing the bills from the Supply Authorities?

    <p>Checking that the maximum demand computation aligns with the billing amount</p> Signup and view all the answers

    Which of the following actions should be taken if the minimum charge exceeds actual energy consumption?

    <p>Immediately contact the CEE and the operating Department for remedial action</p> Signup and view all the answers

    What is the main objective of establishing a time schedule for scrutinizing bills?

    <p>To ensure prompt payment for discounts and rebates related to usage</p> Signup and view all the answers

    Which aspect should not be included in the checklist for scrutinizing bills?

    <p>Verification of the contract duration with previous agreements</p> Signup and view all the answers

    When discrepancies in billing amounts occur, what should be the immediate course of action?

    <p>Investigate the reasons for significant departures compared to earlier bills</p> Signup and view all the answers

    What essential detail regarding billing must be clear as per the agreement?

    <p>The exact payee's details as stipulated in the agreement</p> Signup and view all the answers

    Which of the following is an important reason for conducting a thorough billing scrutiny?

    <p>To ensure that accurate energy consumption metrics are utilized</p> Signup and view all the answers

    What should be done if panel charges are levied incorrectly?

    <p>Carefully scrutinize and implement remedial measures to prevent recurrence</p> Signup and view all the answers

    What should be done with each new bill before passing it?

    <p>It should be compared with previous bills to understand significant changes</p> Signup and view all the answers

    What should local instructions include regarding the checking of bills?

    <p>Explicit directives on arithmetical checks and meter readings</p> Signup and view all the answers

    What is the method for calculating the total harmonic voltage distortion (Vn)?

    <p>$ rac{(V2^2 + V3^2 + V4^2 + ... + V13^2)}{V} imes 100$</p> Signup and view all the answers

    Under what condition can the Railway request testing of the meter for accuracy?

    <p>If accuracy is in doubt at any point of time</p> Signup and view all the answers

    What percentage of harmonic voltage distortion is allowed for the individual harmonic at the point of supply?

    <p>1% and 3% respectively for different conditions</p> Signup and view all the answers

    What should the billing figures be based on when two sets of meters are provided?

    <p>The average readings of the two sets of meters</p> Signup and view all the answers

    When should the monthly meter readings be taken?

    <p>On an agreed date each month jointly by both parties</p> Signup and view all the answers

    What additional information should be obtained during visits to grid sub-stations?

    <p>Daily maximum demand, power factor, and voltage variations</p> Signup and view all the answers

    What should be ensured regarding the tariff for traction?

    <p>It should be reviewed periodically with the SEB</p> Signup and view all the answers

    What is necessary for readings to be accepted for billing purposes?

    <p>They must be jointly recorded and initialed by both parties</p> Signup and view all the answers

    What action should be taken if the maximum demand computation for billing is incorrect?

    <p>Follow the stated procedure to confirm the accuracy</p> Signup and view all the answers

    What is a primary purpose of conducting harmonic analysis?

    <p>To assess compliance with voltage distortion limits</p> Signup and view all the answers

    Study Notes

    Power Supply for Traction

    • Single-phase 50 Hz power for electric traction is obtained from a 220/132/110/66 kV extra high voltage 3-phase grid system via step-down transformers.
    • Duplicate 2-phase feeders are run from the nearest grid substation.
    • A schematic diagram of the traction substation and feeding post is provided (Fig 1.01).
    • The 25 kV single-phase conventional system is described in Chapter 2 of Volume I. This system is used on Indian Railways.

    Liaison with Power Supply Authorities

    • Effective liaison between railway and supply authorities is crucial for reliable power supply.
    • Periodic meetings at various levels should be established.
    • Traction voltage (25-27.5 kV) and frequency (48.5-51.5 Hz) must be maintained.
    • Traction load is considered essential and should not be disconnected or reduced.
    • Periodic reviews of power supply interruptions should occur at the divisional level.
    • An agreement between the railway and supply authority is needed before power supply is initiated.
    • Temporary increases in maximum demand at substations due to feeding from adjacent stations should be ignored by supply authorities for billing purposes.
    • Railways should be charged for traction power based on the simultaneous maximum demand of serviced substations.

    Typical Traction Power Supply Arrangement

    • Diagram (Figure 1.01) illustrates the typical arrangement.
    • The diagram shows incoming high voltage supply, transformers, circuit breakers, lightning arresters, and other components for 25 kV supply.

    Power Tariff for Traction

    • Energy costs are significant in electric traction.
    • Tariffs vary between simple flat rates and complex structures.
    • Contract demand for each substation should be stipulated relative to expected maximum demand.
    • Avoid penal charges for exceeding or insufficient contract demand.
    • Short notice periods for contract demand alterations are preferable.
    • Key tariff parameters to minimize energy bill include maximum demand charge (Rs/KVA/month), energy charge (paise/kWh), fuel adjustment charges (FAC).
    • Penalty for low power factor.
    • Billing demand should be the higher of the actual maximum demand (MD) or a certain percentage of the contract demand.
    • Excess over contract demand results in higher tariffs.
    • Minimum guarantee clauses exist for power supply.
    • Harmonic voltage distortion limits are also specified.

    Monthly Meter Readings

    • Monthly meter readings should be jointly taken by representatives from both railway and supply authorities.
    • Initialed meter cards and printouts of maximum demand data are needed.
    • Supervisory officials should collect data on maximum demand, power factor, load factor, etc.

    Shut-downs of Traction Supply Planning

    • Pre-planning of shutdowns and giving adequate notice to the Supply Authorities is crucial.
    • Multiple EHV feeders and transformers at substations are preferred to avoid complete shutdown.

    Statistical Data Regarding Energy Consumption

    • Divisional offices should record monthly energy consumption data (e.g., kWh, KVA).
    • Power factor, monthly average load factor, payments, and other factors are also part of the data required to be maintained.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    Description

    This quiz explores the power supply systems used in electric traction for Indian Railways, specifically the 25 kV single-phase system. It covers the connection with extra high voltage grids, the role of step-down transformers, and essential liaison with power supply authorities for maintaining traction voltage and frequency. Understand the importance of these systems for reliable railway operations.

    More Like This

    TRACCION ELECTRICA
    7 questions

    TRACCION ELECTRICA

    NicestSavannah avatar
    NicestSavannah
    Power Supply Arrangements at Sub-Stations
    82 questions
    Railway Electric Traction Specifications
    82 questions
    Power Supply Arrangements at Sub-Stations
    82 questions
    Use Quizgecko on...
    Browser
    Browser