Office Operations and Field Management Quiz
39 Questions
1 Views

Office Operations and Field Management Quiz

Created by
@NiftyZombie8372

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Which grid coordinates should be used to derive the grid azimuth for the Cadastral Project?

  • WGS84
  • PRS92 (correct)
  • GNSS 92
  • PR92
  • What term best describes the establishment of political boundary monuments along the boundary lines of a city or municipality?

  • Elevating
  • Defining (correct)
  • Hiding
  • Adjusting
  • Which law governs the guidelines on conducting bidding and awarding of cadastral survey project contracts?

  • RA 9184 (correct)
  • RA 7630
  • RA 8560
  • RA 9183
  • What type of survey must be submitted for independent political boundary projects?

    <p>Boundary Survey</p> Signup and view all the answers

    What is the specified projection below the ground for political boundary monuments?

    <p>90 centimeters</p> Signup and view all the answers

    What must all properties covered by approved surveys be reflected on?

    <p>Cadastral Map</p> Signup and view all the answers

    Which committee is responsible for the recommendation of the Survey Order in a cadastral project?

    <p>Regional Bids and Awards Committee</p> Signup and view all the answers

    What form should political boundary monuments take, according to specifications?

    <p>Square base frustum</p> Signup and view all the answers

    What type of software should personnel be knowledgeable in for office operations?

    <p>AutoCAD</p> Signup and view all the answers

    Which task is NOT described under Field Operations?

    <p>Cartographic activities</p> Signup and view all the answers

    Which document is required to list all personnel involved in the project?

    <p>Geographic Work Plan</p> Signup and view all the answers

    What must be forwarded to NAMRIA prior to project commencement?

    <p>Work Plan</p> Signup and view all the answers

    What is included in the Financial Plan of the project?

    <p>Activity costing and bill of materials</p> Signup and view all the answers

    According to DAO No. 2007-29, which section pertains to the registration of surveying instruments?

    <p>23</p> Signup and view all the answers

    Which diagram is NOT mentioned as a method for expressing the estimated duration of the project?

    <p>Gantt Chart</p> Signup and view all the answers

    Which component is NOT part of the Geodetic Control Work Plan?

    <p>Survey Plan</p> Signup and view all the answers

    Who must give approval for any changes to the Project Control Work Plan?

    <p>RTD</p> Signup and view all the answers

    What dimensions must the survey office signboard be for an independent survey project?

    <p>70 x 120</p> Signup and view all the answers

    What must be included in the Network Design or Scheme?

    <p>Scale</p> Signup and view all the answers

    What is conducted to assess if amendments are necessary for control points in Network Design?

    <p>Reconnaissance</p> Signup and view all the answers

    When using a combination of GNSS and Total Station, which mode can geodetic engineers switch to?

    <p>ETS</p> Signup and view all the answers

    What must the survey team establish if the Survey Control is an independent project?

    <p>A survey office with proper identification</p> Signup and view all the answers

    What serves as a guide in conducting the actual ground survey?

    <p>The Network Design or Scheme</p> Signup and view all the answers

    What type of project control method requires long observation periods but does not need a line of sight?

    <p>GNSS method</p> Signup and view all the answers

    What type of circuit or loop traverse is used to determine Longitude starting from reference points of known geographic positions?

    <p>Closed</p> Signup and view all the answers

    Which method can be used to determine elevation starting from bench marks of known elevation?

    <p>Elevation</p> Signup and view all the answers

    From which point shall the survey lines be reckoned as zero direction when calculating azimuth?

    <p>South</p> Signup and view all the answers

    What designation is given to surveys with special instructions that cannot be subject to titling?

    <p>Special Work Order (Swo)</p> Signup and view all the answers

    Which Act governs the conduct of mineral land surveys as per the procedures set by the Mines and Geosciences Bureau?

    <p>Philippine Mining Act of 1993</p> Signup and view all the answers

    After what enactment can the conduct of a survey proceed, according to the assessment/delineation of forestland boundary?

    <p>Final report of the Regional Assessment and Delineation Team</p> Signup and view all the answers

    What type of representatives must make up the Survey Party tasked with conducting the survey?

    <p>At least two members of the RADT and a representative of NAMRIA</p> Signup and view all the answers

    Which of the following correctly refers to the maps drawn on a cadastral map size drafting film?

    <p>Case/Barangay Border and Index Maps (BBIM)</p> Signup and view all the answers

    What type of surveys must be drawn on the LMB prescribed format when used for administrative or judicial registration?

    <p>Cadastral</p> Signup and view all the answers

    Which color should the vertical and horizontal center lines of plane coordinates be inked in?

    <p>Blue</p> Signup and view all the answers

    What line is drawn horizontally from left to right on the drawing plan?

    <p>Latitude</p> Signup and view all the answers

    The scale for which type of surveys depends on the difference in extreme coordinates?

    <p>Cadastral</p> Signup and view all the answers

    When parcels are subdivided into many small lots, what should be used to prepare plans?

    <p>Multiple sheets on a uniform scale</p> Signup and view all the answers

    Which type of survey would use the biggest scale mentioned in the guidelines?

    <p>Subdivision</p> Signup and view all the answers

    What should be indicated on the plan when plotting the portions of subdivisions?

    <p>The numbers of the sheets used</p> Signup and view all the answers

    Study Notes

    Project Offices and Operations

    • Various project offices include Project Main Office, Project Headquarters, Head Office, and Project Head Office.
    • Office Operations involve data research, computations, and mapping with computer-literate personnel knowledgeable in GNSS, GE Surv, AutoCAD, and NMAX software.
    • Field Operations focus on reconnaissance, control point setting, observations, and related activities.

    Personnel and Work Plans

    • A comprehensive list of personnel must be included in the proposed Geodetic Control Work Plan.
    • The Geodetic Control Survey Project requires licensed geodetic engineers such as Chief of Party, Assistant Chief of Party, and instrument observers.
    • The Work Plan encompasses Project Management and Technical Plans, submitted for NAMRIA approval prior to project initiation.

    Financial and Equipment Plans

    • The Financial Plan details activity costing and material bills for office and field operations, including miscellaneous expenses like photocopying and certification fees.
    • The project must specify equipment allocations for different phases, ensuring that all surveying instruments comply with DAO No. 2007-29 regulations.

    Project Duration and Adjustments

    • Project duration, expressed in days, should be presented through graphs, PERT-CPM charts, etc., considering terrain and physiographic features.
    • Any changes to the approved Project Control Work Plan require prior approval from the Regional Technical Director for Lands.

    Survey Control and Identifications

    • When conducting independent Survey Control projects, a survey office must be established with specified signboard dimensions.
    • Network Design involves plotting control networks and preparing maps with appropriate scale and distance from the poblacion for effective ground survey guidance.

    Boundary and Political Surveys

    • Political Boundary Surveys establish monuments defining city/municipality boundaries, necessitating comprehensive survey procedures.
    • Surveys must adhere to DAO 2008-14 guidelines, with Survey Orders issued by the Regional Executive Director upon recommendations from the Regional Bids and Award Committee.

    Survey Authority and Team Composition

    • For independent political boundary surveys, geodetic engineers must submit resolutions from local councils and obtain corresponding Survey Authority from the RTD for Lands.
    • The Survey Party consists of Geodetic Engineers, members from the Regional Assessment and Delimitation Team, and representatives from relevant government agencies.

    Survey Planning and Execution

    • Cadastral maps and index maps must be drawn according to LMB prescribed formats for administrative or judicial purposes.
    • Accurate plotting of coordinates with clearly defined northing and latitudinal lines is required for survey plans.

    Special Work Orders and Standards

    • Surveys not covered in the manual will follow special instructions reflecting tertiary accuracy, designated as "Special Work Orders."
    • Conducting mineral land surveys is bound by standards set by the Mines and Geosciences Bureau under the Philippine Mining Act.

    Documentation and Compliance

    • All plots of cadastral surveys must comply with LMB formats, requiring authority clearance for computerized methods.
    • Proper documentation through diagrams, elevation lines, and azimuth direction plays a crucial role in effective surveying practice.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge on various office operations and field activities essential for data research and project management. This quiz covers topics such as processing software and field reconnaissance tasks. Enhance your understanding of essential skills in an office and field setting.

    More Like This

    Front Office Operations Quiz
    5 questions
    Front Office Operations Quiz
    5 questions

    Front Office Operations Quiz

    LuxuryChrysoprase8253 avatar
    LuxuryChrysoprase8253
    Front Office Operations Quiz
    5 questions

    Front Office Operations Quiz

    GlimmeringWilliamsite avatar
    GlimmeringWilliamsite
    Use Quizgecko on...
    Browser
    Browser