14 Questions
What must personnel do before any transfer procedures?
Perform Safety and Initial Inspection and Preparation procedures
What should personnel do to prevent overpressure and overfilling during an LNG transfer?
Monitor flow rates, liquid levels, and tank pressures
Which tanks are the following procedures for LNG transfer to?
Tanks 1-3 only
Who is allowed to perform transfers into Tank 4?
Experienced operators
What must operators not do during the transfer?
All of the above
When can the truck engine be restarted during the transfer?
After all hazardous gas vapors have dissipated from the area
What should personnel monitor during the transfer to prevent overpressure and filling?
Flow rates, liquid levels, and tank pressures
Which tanks are covered by the procedures described in the text?
Tanks 1-3
Who can perform transfers into Tank 4 without IGU assistance?
IGU personnel only
What should be done before the transfer to pressurize the hose from the valve to the transport?
Open valve V-902 fully on the APE hose
What should be done if the target tank being filled will become full before the transport empties?
Open the top fill valve of another storage tank
What should be done after the transport is empty?
Crack the transfer and APE hose connection at the transport
What should the operator do before leaving the storage site?
Ensure that all storage tank, transfer and transport valves are returned to their desired open or closed positions
What should be done for transfer to Tank 4?
Refer to SOP S1-6244
Study Notes
Procedures for LNG Transfer to Tanks 1-3
- Before starting the transfer, perform all Safety and Initial Inspection and Preparation procedures.
- Personnel must monitor flow rates, liquid levels, and tank pressures during the transfer to prevent overpressure and filling.
- These procedures are only for LNG transfer to Tanks 1-3. Refer to SOP S1-6244 for transfer to Tank 4.
- Contracted LNG drivers cannot perform transfers into Tank 4 without IGU assistance.
- To prepare the transport for transfer, set chocks, connect ground, and connect LNG transfer hose to the liquid out pipe of the transport.
- Inside the control building, start all necessary paperwork and determine which tank to fill.
- To pressurize the hose from the valve to the transport, slowly open valve V-902 fully on the APE hose.
- Purge the transfer hose and piping before the transfer.
- If the target tank being filled will become full before the transport empties, open the top fill valve of another storage tank before the target tank is full.
- After the transport is empty, crack the transfer and APE hose connection at the transport to allow the remaining trapped gas and liquid vapor to escape while the connection is still attached.
- Before leaving the storage site, the operator must check that all storage tank, transfer and transport valves are returned to their desired open or closed positions as indicated by this procedure.
- The operator must also ensure that all transport and man gates are locked, all pressure indicating controllers are at standard settings, and the transfer data checklist sheet is complete and left at the site.
Test your knowledge on LNG transfer procedures with this quiz! Learn about the pressure transfer method and safety inspection process involved in transferring LNG to Tanks 1-3. From purging transfer hoses to monitoring flow rates, this quiz covers all the essential steps to ensure safe and efficient LNG transfer. Take the quiz now and see how much you know!