LNG Discharging Process Quiz
3 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the purpose of a pre-discharge meeting between the terminal operator and the ship's crew?

  • To discuss the discharge plan and safety procedures (correct)
  • To transfer the LNG to the storage tanks
  • To prepare the terminal for the arrival of the LNG ship
  • To manage the boil-off gas

What is boil-off gas and how is it managed during the LNG transfer process?

  • The gas used to fuel the transfer process, which is stored in the terminal's tanks
  • The gas produced during the pre-discharge planning phase, which is vented into the atmosphere
  • The gas created when the LNG warms up and vaporizes, which must be managed to prevent safety hazards (correct)
  • The gas that is created when the LNG is cooled, which is used to power the ship's engines

Who should be in charge of discharging an LNG ship?

  • Qualified personnel with appropriate training and experience (correct)
  • Any terminal or ship crew member
  • The CEO of the terminal company
  • The captain of the ship

More Like This

LNG Transfer Procedures Quiz
14 questions

LNG Transfer Procedures Quiz

ImpeccableCarnelian4634 avatar
ImpeccableCarnelian4634
LNG Storage Safety
9 questions

LNG Storage Safety

ImpeccableCarnelian4634 avatar
ImpeccableCarnelian4634
LNG 1400A Neutralisation
71 questions

LNG 1400A Neutralisation

FresherHyperbolic avatar
FresherHyperbolic
LNG Value Chain Overview Quiz
40 questions
Use Quizgecko on...
Browser
Browser