23 Questions
What is described as everything else, apart from what customers would be willing to pay for?
Non-value adding
What is one of the benefits of cellular manufacturing?
Less WIP and less administration required
Why is stock present in traditional 'push' production systems?
To buffer the unevenness of work and breaks in the chain
What is Takt time related to?
Lead time analysis
What is the main goal of lead time analysis?
To analyze the time it takes to complete a production process
What is the advantage of cellular manufacturing regarding quality control?
It reduces the need for rework
What is the main objective of the VA/NVA ratios?
To raise the ratio of Value Added operations to Non-value Added
What initiates the use of KPIs in a company?
Both company-specific quality and customer complaints
What is an example of a Value Added process?
Designing
What is the first step in identifying the Seven Wastes?
Observe and map the process
What is the purpose of the VA/NVA ratios?
To optimize the ratio of Value Added to Non-value Added operations
What is an example of a Non-value Added process?
Part movement
What happens when a link in the chain breaks?
The chain stops
What is the primary purpose of Pull and Visual Management?
To manage the flow of production and customer demand
What are the characteristics of a good Poka Yoke device?
Simple, cheap, and part of the process
What is the primary benefit of Error Proofing?
Preventing mistakes and providing feedback for correction
What is the main idea behind the 'Pull' concept in production?
Matching production with customer demand
What is the result when the Customer does not pull from the end of the production chain?
The production process stops
What is the main concept behind the Toyota concept of the 7 Wastes?
Identifying areas of inefficiency in the supply chain
What is the primary goal of the 5S technique in lean supply chain management?
Organizing and standardizing the workplace
What is the main objective of Kanban stock control systems?
Managing inventory levels to meet demand
What is the purpose of SMED in lean supply chain management?
Reducing production changeover times
What is the goal of Poka-Yoke in lean supply chain management?
Preventing errors and defects
Learn the basics of lean supply chain management planning, including the 7 wastes concept, and techniques such as 5S, Total Productive Maintenance, and Problem Solving.
Make Your Own Quizzes and Flashcards
Convert your notes into interactive study material.
Get started for free