Kalidindi Village Drainage Issues
16 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the main issue highlighted in the letter regarding kalidindi village?

  • Too many buildings are being constructed.
  • There is a shortage of clean water.
  • The roads are in poor condition.
  • The drainage system is inadequate. (correct)

Which road is specifically mentioned as having a broken drainage system?

  • Water Tank road
  • R&B road (correct)
  • Peta Kalidindi road
  • Internal CC roads

What effect is being caused due to the increase in road levels in kalidindi village?

  • Increased likelihood of flooding in homes (correct)
  • Improved drainage of flood water
  • Better road safety for villagers
  • Enhanced structural integrity of buildings

How often is infrastructure forced to be rebuilt due to the current conditions?

<p>Every 10 to 20 years (C)</p> Signup and view all the answers

What environmental challenge is exacerbated during the monsoon season in kalidindi village?

<p>Water stagnation (C)</p> Signup and view all the answers

What complaint was made to the Kalidindi Panchayat and District Collector?

<p>Road construction at unnecessary elevated levels (B)</p> Signup and view all the answers

Who is the author of the letter addressed to?

<p>The Deputy Chief Minister (C)</p> Signup and view all the answers

What is one proposed cause for the absence of drainage in kalidindi village?

<p>Neglect of village infrastructure (D)</p> Signup and view all the answers

What issue is impacting the environment in the micro village?

<p>Delays in road inspection (C)</p> Signup and view all the answers

Which grievance number was filed and subsequently closed?

<p>ELR202411044625 (C)</p> Signup and view all the answers

What was one of the recommendations given to the Panchayat?

<p>Observe and execute roads with optimum levels (C)</p> Signup and view all the answers

What action did the DEE, Mandavalli take regarding the construction of the roads?

<p>Instructed to stop the construction (D)</p> Signup and view all the answers

What comprehensive planning strategy was suggested for infrastructure development?

<p>Implement holistic rural planning (C)</p> Signup and view all the answers

What measure was suggested to improve the construction process of the roads?

<p>Conduct thorough inspections (B)</p> Signup and view all the answers

Which official's disregard for instructions is highlighted in the grievances?

<p>Local AE (C)</p> Signup and view all the answers

What type of environmental issues are caused by increased road levels?

<p>Flooding in areas (D)</p> Signup and view all the answers

Flashcards

Drainage System Absence

The absence of a comprehensive drainage system, leading to water stagnation in various areas of the village, especially during monsoon.

Elevated Constructions

The practice of constructing new roads and buildings at higher levels than existing structures, contributing to water accumulation in lower areas.

Lowline Areas

The phenomenon where buildings and infrastructure become lower than the surrounding road level due to elevated constructions, resulting in water flooding these areas.

Frequent Infrastructure Replacement

The repeated need to rebuild roads and infrastructure due to the combined effects of water damage caused by drainage issues and elevated constructions.

Signup and view all the flashcards

Water Stagnation

The increased frequency of water stagnation in the village, particularly on main roads, internal roads and in the village interiors.

Signup and view all the flashcards

Elevated Roads and Flooding

The impact of elevated roads on water flow, leading to water accumulating in lower areas and potentially flooding houses.

Signup and view all the flashcards

Increased Plinth Level

The need to raise the floor level of buildings to avoid water stagnation, potentially causing a mismatch in levels with neighboring structures.

Signup and view all the flashcards

Reduction in Building Lifespan

The detrimental effect of water stagnation on the lifespan of existing structures, leading to frequent repairs and replacements.

Signup and view all the flashcards

What is a PGRS grievance?

A complaint filed with the District Collector through a public grievance system (PGRS).

Signup and view all the flashcards

What does "ELR20241015266" represent?

This is a reference to a specific PGRS grievance number, ELR20241015266, recorded on October 15, 2024.

Signup and view all the flashcards

What does it mean when a grievance is "closed"?

A public grievance is considered "closed" when it has been addressed and resolved.

Signup and view all the flashcards

What does "reopened and continuing" mean for a grievance?

This refers to a grievance number, ELR20241119190, which was initially closed but has been reopened and is still being addressed.

Signup and view all the flashcards

What is a Panchayat?

A Panchayat is a local governing body in rural India.

Signup and view all the flashcards

Who is a DEE?

DEE stands for "Divisional Executive Engineer" who is a senior official responsible for overseeing infrastructure projects.

Signup and view all the flashcards

What are "roads being executed with many technical incompetencies and increasing road levels"?

This refers to a specific type of construction where roads are built with an incorrect level or elevation, leading to problems.

Signup and view all the flashcards

How does road construction cause "environmental issues in a micro village environment"?

This refers to the negative environmental impact caused by the construction of roads, particularly in a small village setting.

Signup and view all the flashcards

Study Notes

Kalidindi Village Drainage Issues

  • Drainage system in Kalidindi village is deficient
  • Water stagnation is frequent, especially during monsoon
  • New roads and buildings are constructed at higher levels than necessary
  • Existing buildings and infrastructure are now at lower levels than the roads, leading to flooding
  • Road and infrastructure repairs are needed more often due to the water damage
  • Roads are being built on existing roads at higher levels, which is exacerbating the problem.

Grievances and Action Required

  • Several grievances (ELR numbers) have been filed with the District Collector
  • Local officials are not addressing the issues despite instructions
  • Road construction lacks proper planning and execution
  • Drainage, water supply, and other infrastructure must be developed in tandem with the roads.
  • The current execution of the projects needs to be halted.
  • Inspection and impact studies are necessary to address the issue.

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

Related Documents

Description

Explore the drainage problems facing Kalidindi village, where inadequate systems and poorly planned construction exacerbate water stagnation and flooding. Learn about the grievances filed with local authorities and the urgent need for improved infrastructure management. This quiz addresses the challenges and required actions for sustainable solutions.

More Like This

Use Quizgecko on...
Browser
Browser