What is the primary objective of the Gati Shakti National Master Plan?

  • To improve the efficiency of the Indian Railways.
  • To increase the number of airports in India.
  • To create a single platform for multimodal infrastructure connectivity. (correct)
  • To promote the growth of specific industrial sectors.
  • Which of the following is NOT a key focus area under the Gati Shakti Plan?

  • Marketing (correct)
  • Financing
  • Planning
  • Technology
  • Which Ministry is NOT involved in the Gati Shakti Master Plan?

  • Ministry of Petroleum and Natural Gas
  • Ministry of Railways
  • Ministry of Human Resource Development (correct)
  • Ministry of Tourism
  • What is the role of the Logistic Division in the Ministry of Commerce?

    <p>To develop and maintain the National Logistic Information Portal.</p> Signup and view all the answers

    Which organization is responsible for developing the Digital Master Plan under Gati Shakti?

    <p>BISAG-N (Bhaskaracharya National Institute for Space Applications and Geoinformatics)</p> Signup and view all the answers

    What is the primary source of data for the dynamic mapping of infrastructure projects?

    <p>Satellite imagery from ISRO</p> Signup and view all the answers

    Which of the following best describes the approach to collaboration under the Gati Shakti framework?

    <p>Ministries collaborate and coordinate their efforts under a common umbrella.</p> Signup and view all the answers

    What is the role of the Cabinet Secretary in relation to the Gati Shakti Master Plan?

    <p>To oversee the overall implementation of the plan.</p> Signup and view all the answers

    Which of these is NOT a characteristic of the Gati Shakti National Master Plan?

    <p>Focus on promoting only private sector investment in infrastructure.</p> Signup and view all the answers

    What is the primary goal of the Gati Shakti Master Plan in terms of economic development?

    <p>To increase the flow of goods and services, thereby boosting economic activity.</p> Signup and view all the answers

    What is the fee for the online application to DRM?

    <p>Rs. 20,000</p> Signup and view all the answers

    How long does it take to receive In Principle Approval (IPA) after submission?

    <p>20 days</p> Signup and view all the answers

    What must happen within 4 weeks of receiving IPA?

    <p>Submit the project details and Engineering Scale Plan</p> Signup and view all the answers

    What is the term used for charges related to GCT on sharing?

    <p>Terminal fees</p> Signup and view all the answers

    What is the consequence of failing to commence construction within six months of approval?

    <p>Approval may be put in abeyance</p> Signup and view all the answers

    Who is responsible for the joint survey and feasibility report concerning private land applications?

    <p>SrDOM</p> Signup and view all the answers

    Which of the following is true regarding the siding owner's discount?

    <p>They receive a 10% discount for investment</p> Signup and view all the answers

    What percentage of the estimated cost is required as the earnest money deposit (EMD)?

    <p>10%</p> Signup and view all the answers

    What condition applies to assets located within Railway boundaries?

    <p>They are maintained by the Railways</p> Signup and view all the answers

    What timeframe is allowed for the completion of construction after obtaining approval?

    <p>24 months</p> Signup and view all the answers

    Which committee role reports directly to the DRM?

    <p>SrDCM</p> Signup and view all the answers

    What is the maximum duration specified for the ESP approval by CE/P&D?

    <p>2 weeks</p> Signup and view all the answers

    What rebate does GCT offer for the investment in loading 1 MT in a calendar year?

    <p>10% rebate</p> Signup and view all the answers

    What must an applicant do if construction does not commence or is not completed in the specified time frames?

    <p>Risk having approval put in abeyance</p> Signup and view all the answers

    In tender applications for full or partially railway land, which of the following determines the minimum infrastructure facilities?

    <p>Division</p> Signup and view all the answers

    Which batch includes the Senior Den/Co in the committee structure?

    <p>SG/JAG/SS/JS</p> Signup and view all the answers

    How long does the feasibility report take to complete after application submission?

    <p>15 days</p> Signup and view all the answers

    What is the primary objective of the EOI in the land acquisition process?

    <p>Identify prospective operators</p> Signup and view all the answers

    Which type of land ownership is specified as being only leased for connectivity purposes?

    <p>Railway land</p> Signup and view all the answers

    Who serves as the chairperson of the committee involved in the land sharing process?

    <p>DRM</p> Signup and view all the answers

    What is the primary purpose of the Gati Shakti Multi Model Cargo Terminal (GCT)?

    <p>To boost investment from industry in terminal development</p> Signup and view all the answers

    How many new GCTs are proposed to be commissioned in the next three years?

    <p>100</p> Signup and view all the answers

    What significant action must existing terminals take to migrate under the new policy?

    <p>Withdraw all pending arbitration/court cases</p> Signup and view all the answers

    Which of the following states has the highest number of proposed GCTs?

    <p>Maharashtra</p> Signup and view all the answers

    What role does the Technical Support Unit (TSU) play in the logistics division?

    <p>Provides domain expertise and support</p> Signup and view all the answers

    What entity is primarily responsible for the oversight of the GCT operation?

    <p>Development Regional Manager</p> Signup and view all the answers

    What distinguishes the GCT from the previous Private Freight Terminal (PFT) policy?

    <p>Unification and replacement of existing policies</p> Signup and view all the answers

    What is the significant benefit expected from the establishment of GCTs?

    <p>Reduction in rail cargo handling time</p> Signup and view all the answers

    What is the role of the Network Planning Division in relation to GCT?

    <p>Coordinating infrastructure connectivity</p> Signup and view all the answers

    Which of the following is NOT a requirement for GCT migration?

    <p>Demolishing existing infrastructure</p> Signup and view all the answers

    Which of the following best describes the integrated planning approach of the Gati Shakti plan?

    <p>A synchronized approach combining databases to align ongoing and future projects across diverse sectors.</p> Signup and view all the answers

    What is the primary function of the National Logistics Information Portal within the Gati Shakti framework?

    <p>To act as a single platform for access to consolidated and regularly updated data from various ministries.</p> Signup and view all the answers

    What is the significance of the 'Gati Shakti Umbrella' in the context of inter-ministerial coordination?

    <p>It signifies the collaborative approach where Ministries and Departments break from silos and work in coordination.</p> Signup and view all the answers

    Which aspect of infrastructure project management does the dynamic mapping under the Gati Shakti plan aim to enhance?

    <p>Real time tracking and updating of project status and geographic information.</p> Signup and view all the answers

    What is the primary role of BISAG-N (Bhaskaracharya National Institute for Space Applications and Geoinformatics) in the Gati Shakti initiative?

    <p>To develop and maintain the Digital Master Plan using mapping and GIS tools.</p> Signup and view all the answers

    Which elements are prominently used in creating the dynamic mapping for the Gati Shakti plan?

    <p>Satellite imagery from ISRO and Survey of India base maps.</p> Signup and view all the answers

    Which of these best categorizes the types of economic zones mapped under the Gati Shakti plan?

    <p>A broad spectrum including textile parks, pharmaceutical clusters, and agricultural zones.</p> Signup and view all the answers

    How will the Gati Shakti plan specifically enhance cost efficiency in infrastructure projects?

    <p>By minimizing disruptions and expediting project work through integrated planning and clear data.</p> Signup and view all the answers

    Under the Gati Shakti framework, what is the significance of the MEGHRAJ - GOI Cloud platform?

    <p>A cloud service to host the dynamic infrastructure project maps and data.</p> Signup and view all the answers

    Who is designated as the convenor of the Gati Shakti framework at the highest level?

    <p>A special secretary.</p> Signup and view all the answers

    Which of the following best describes the role of Empowered Secretaries Group (ESOG) in the context of the Gati Shakti Plan?

    <p>To ensure compliance with the Master Plan requirements and coordinate activities, including Network Planning Division.</p> Signup and view all the answers

    According to the provided information, what is the main difference in the feasibility assessment between a Private Freight Terminal (PFT) and a Gati Shakti Multi-Modal Cargo Terminal (GCT)?

    <p>PFTs require detailed Project Reports (DPR), whereas these are abolished for GCTs.</p> Signup and view all the answers

    Based on the data provided, which of these states has the second highest number of proposed Gati Shakti Multi-Modal Cargo Terminals (GCTs)?

    <p>Maharashtra</p> Signup and view all the answers

    If an existing Private Siding/Private Freight Terminal wishes to migrate to a Gati Shakti Cargo Terminal (GCT), which requirement does NOT apply?

    <p>An environmental clearance certificate needs to be newly filed and approved.</p> Signup and view all the answers

    What is the primary function of the Technical Support Unit (TSU) within the context of the Gati Shakti Plan?

    <p>To provide expertise from various domains with the aim to support the Logistics Division.</p> Signup and view all the answers

    In the context of the Gati Shakti Multi-Modal Cargo Terminal (GCT), who is designated as the Nodal Officer at the divisional level?

    <p>The Divisional Railway Manager (DRM).</p> Signup and view all the answers

    Based on the provided data, how many Gati Shakti Multi-Modal Cargo Terminals (GCTs) have been commissioned so far?

    <p>6</p> Signup and view all the answers

    Which of these elements is a key component that defines the Gati Shakti Multi-Modal Cargo Terminal (GCT) policy according to the details provided?

    <p>It unifies the policies for private sidings and private freight terminals.</p> Signup and view all the answers

    What is the significance of the 'FM Master Circular, Dt.15.12.2021' in the context of Gati Shakti Multi Modal Cargo Terminals (GCTs)?

    <p>It serves as a guideline for the development of additional terminals.</p> Signup and view all the answers

    How many subject matter experts with 15-20 years of experience, are part of the Technical Support Unit (TSU)?

    <p>14</p> Signup and view all the answers

    Which of the following best describes the financial relationship between the GCT and railway land usage?

    <p>GCTs lease land for connectivity purposes only, with terminal charges applying to shared land.</p> Signup and view all the answers

    In the committee structure for GCTs, which individual from the operating department reports directly to the Divisional Railway Manager (DRM)?

    <p>Chief Engineer (CPM)</p> Signup and view all the answers

    According to the process for establishing GCTs on private land, what is the duration specified for joint survey and feasibility report completion after a land application is submitted?

    <p>15 days</p> Signup and view all the answers

    Following submission of an application for a GCT on private land, before the ESP approval by CE/P&D, which of the following must be submitted by the applicant?

    <p>Land ownership details, EIMWB, Cargo handling mechanism, Standard Layout and Alignment</p> Signup and view all the answers

    In the context of GCT implementation, what is the key role of the Expression of Interest (EOI) phase in the tender process for Railway Land?

    <p>To identify prospective operators for the GCT on railway land</p> Signup and view all the answers

    Which role forms a part of the core tender committee and is primarily responsible for financial oversight of the GCT process?

    <p>Senior Divisional Finance Manager (SrDFM)</p> Signup and view all the answers

    Within the committee structure for GCT, which sub-group falls under Senior Administrative Grade (SAG) level?

    <p>SAG – 2 Batches</p> Signup and view all the answers

    What is the stipulated timeline for the CE/P&D to approve the ESP after an applicant has submitted a full GCT proposal?

    <p>2 Weeks</p> Signup and view all the answers

    What is the primary objective of the two-packet system used in tenders for GCTs on railway land?

    <p>To ensure transparency by evaluating technical and financial proposals separately</p> Signup and view all the answers

    If a GCT applicant applies for railway land and is successful, what does the 'land for connectivity' aspect of the agreement entail?

    <p>A renewable lease only for the land used for access.</p> Signup and view all the answers

    If an applicant receives In Principle Approval (IPA), what specific action must they undertake within the subsequent 4 weeks?

    <p>Provide the Engineering Scale Plan (ESP) for the project accompanied by CE/P&amp;D approval details.</p> Signup and view all the answers

    According to the provided information, what constitutes the maintenance responsibilities for assets within a railway boundary in the context of siding construction?

    <p>The railway maintains the assets, excluding certain elements outlined as siding responsibility.</p> Signup and view all the answers

    In the context of a siding project, what happens if the applicant fails to either start construction within 6 months or complete it within 24 months of receiving approval?

    <p>The Railways reserve the right to put approval in abeyance, potentially affecting connectivity rights.</p> Signup and view all the answers

    What is the fundamental difference between a Siding/Dedicated Goods Siding (SDG) and a Gati Shakti Cargo Terminal (GCT) regarding ownership of assets?

    <p>Assets for SDGs remain with the siding owner, whereas GCT assets located on railway land belong to the Railways.</p> Signup and view all the answers

    What specific discount arrangement is provided for siding owners as an incentive for their investment within a railway boundary?

    <p>A 10% discount on total costs related to the siding investment</p> Signup and view all the answers

    What is the specified purpose of the feasibility report during the online application process to the DRM?

    <p>To evaluate the financial viability of the proposed siding project and its connectivity for operational approval.</p> Signup and view all the answers

    What is the maintenance responsibility for OHE (Overhead Equipment) from the take-off point to a Gati Shakti Cargo Terminal (GCT)?

    <p>Maintenance is to be provided by railway authorities.</p> Signup and view all the answers

    What does 'non-EOL' signify in the context of staff allocation as per the provided information?

    <p>One staff member will handle duties outside of end-of-line (EOL) operations.</p> Signup and view all the answers

    What is the timeline provided for the completion of engineering scale plan (ESP) approval by CE/P&D after IPA?

    <p>Within 4 weeks of receiving IPA.</p> Signup and view all the answers

    What specific incentive is GCT offered for investment related to loading capacity?

    <p>A fixed rebate of 10% on the investment for loading 1 MT in a calendar year.</p> Signup and view all the answers

    Which of the following best describes the intended scope of the 'single platform' in the Gati Shakti plan?

    <p>A comprehensive database for multi-modal infrastructure connectivity</p> Signup and view all the answers

    What is the primary aim of mapping existing and proposed economic zones under the Gati Shakti plan?

    <p>To support the development of a national supply chain</p> Signup and view all the answers

    Which of these options is most accurate about the Gati Shakti plan's approach to project execution?

    <p>Ensuring faster implementation through coordinated work and cost efficiencies</p> Signup and view all the answers

    Which of the following is a key focus area emphasized as a 'growth engine' under the Gati Shakti plan?

    <p>Logistics infrastructure</p> Signup and view all the answers

    Apart from ministries, which other central government entities are stakeholders according to the Gati Shakti plan?

    <p>Central government departments</p> Signup and view all the answers

    What specific role does the Ministry of Commerce play within the Gati Shakti framework?

    <p>Formulating national logistic policy and promoting inter-ministerial coordination</p> Signup and view all the answers

    What is the main objective of creating a 'Digital Master Plan' in the context of Gati Shakti?

    <p>To integrate all project information for efficient planning</p> Signup and view all the answers

    Which technology primarily facilitates the dynamic mapping of infrastructure projects under the Gati Shakti Plan?

    <p>GIS (Geographic Information System) technology</p> Signup and view all the answers

    What is the significance of 'MEGHRAJ' in the Gati Shakti plan?

    <p>A cloud platform for hosting and sharing master plan data</p> Signup and view all the answers

    In the Gati Shakti framework, who is designated as the convenor at the highest level of decision making?

    <p>A special secretary</p> Signup and view all the answers

    Which entity does not have direct representatives in the Logistics Division?

    <p>Economic zones stakeholders</p> Signup and view all the answers

    What is the target number of Gati Shakti Multi-Modal Cargo Terminals (GCT) to be commissioned within 3 years?

    <p>100</p> Signup and view all the answers

    Under the GCT policy, what is a requirement for an existing terminal to migrate?

    <p>Clearing all dues; withdrawal of all pending arbitration/court cases</p> Signup and view all the answers

    Which state is targeted to have the highest number of GCT's in the plan?

    <p>Maharashtra</p> Signup and view all the answers

    What is the Technical Support Unit's (TSU) primary function relative to the Logistics Division?

    <p>Providing domain expertise and support</p> Signup and view all the answers

    What is generally the main distinction between a GCT and a Private Siding/Private Freight Terminal (PFT)?

    <p>GCTs unify and replace the previous PFT policy</p> Signup and view all the answers

    What is one of the ways GCTs are expected to positively impact the logistics process?

    <p>Boosting investment from the industry</p> Signup and view all the answers

    Which statement is correct regarding the differences between the roles of a CTPM and DRM in the context of GCT and SDG/PFT?

    <p>DRM is the nodal officer for GCT, whilst CTPM is for SDG/PFT</p> Signup and view all the answers

    What has been abolished in the GCT process, compared with the Private Siding/PFT policy?

    <p>The Detailed Project Report (DPR).</p> Signup and view all the answers

    What is the stated function of the Network Planning Group (NPG)

    <p>To address connectivity infrastructure aspects</p> Signup and view all the answers

    What is the specified duration for the feasibility report after submitting an online application to DRM?

    <p>15 days</p> Signup and view all the answers

    What timeframe is given to an applicant after receiving In Principle Approval (IPA) to submit project details and the Engineering Scale Plan (ESP)?

    <p>4 weeks</p> Signup and view all the answers

    If an applicant fails to start construction within six months of approval, what action does the Railways reserve the right to take?

    <p>Put the approval in abeyance</p> Signup and view all the answers

    What is the standard duration for the joint survey and feasibility report on private land applications?

    <p>15 days</p> Signup and view all the answers

    For a siding owner, what discount is offered regarding their capital investment?

    <p>10% discount for the investment</p> Signup and view all the answers

    Which of these roles is NOT part of the GCT units' committee?

    <p>CSTE (Chief Signal and Telecommunication Engineer)</p> Signup and view all the answers

    What is the maintenance responsibility of the siding owner within their siding?

    <p>Track and S&amp;T signalling equipment within the siding.</p> Signup and view all the answers

    What does 'ESP' stand for in the context of GCT land applications?

    <p>Engineering Site Plan</p> Signup and view all the answers

    For a tender involving railway land, what is the first step the division is responsible for?

    <p>Identifying spareable land and determining minimum infrastructure</p> Signup and view all the answers

    What rebate does a GCT offer for investments towards loading 1 MT of cargo within a calendar year?

    <p>10% rebate for their investment in loading 1 MT</p> Signup and view all the answers

    What is the process for selecting operators for a GCT on Railway Land?

    <p>Open tenders with a two-packet system</p> Signup and view all the answers

    Which assets, on private land & leased railway land related to GCT's, are transferred to Railways?

    <p>All assets on private land &amp; railway land leased to the GCTO</p> Signup and view all the answers

    What is the maximum time allowed to complete the construction of a railway project?

    <p>24 months from the grant of approval.</p> Signup and view all the answers

    Who serves as the accepting authority for the Engineering Site Plan (ESP)?

    <p>DRM/ADRM</p> Signup and view all the answers

    Who from the committee has a Finance role?

    <p>Sr.DFM</p> Signup and view all the answers

    Who is responsible for the maintenance of the Overhead Equipment (OHE) from the take-off point to a serving station in a GCT project?

    <p>Railways</p> Signup and view all the answers

    What is the required number of staff specified for non-EOL operations by GCT?

    <p>One staff</p> Signup and view all the answers

    How many weeks are allocated for the applicant to submit an ESP?

    <p>4 weeks</p> Signup and view all the answers

    What is the relationship between the CPM and DRM?

    <p>CPM reports to DRM</p> Signup and view all the answers

    What is the purpose of the EOI in the tender process for land?

    <p>To identify prospective operators</p> Signup and view all the answers

    Study Notes

    Gati Shakti National Master Plan

    • Launched on October 21, 2021, aimed at multi-modal infrastructure connectivity.
    • Seeks to create a single platform for ongoing and future projects across various ministries and states.
    • Includes mapping existing and proposed economic zones, including textile parks, pharmaceutical clusters, defense corridors, electronic parks, industrial corridors, fishing clusters, and agri-food zones.
    • Aims for integrated planning for the movement of people, goods, and services.
    • Focuses on easing business, minimizing disruptions, and expediting work with cost-efficiency.

    Growth Engines

    • Key sectors for growth include railways, roads, ports, waterways, airports, mass transport, and logistics infrastructure.
    • Each sector's focus involves planning, financing, technology, and faster implementation.

    Stakeholders

    • Sixteen key stakeholders are identified, including railways, road transport and highways, ports, shipping & waterways, civil aviation, petroleum and natural gas, mines, tourism, steel, commerce and industry, telecommunications expenditure, electronics and information technology, coal, agriculture and farmer welfare, housing and urban affairs, chemicals and petrochemicals, food and PDS, fertilizers, fisheries, animal husbandry, and dairying.
    • NITI Aayog is also listed as a stakeholder.

    Formulation

    • A dedicated Logistic Division led by a Special Secretary was created within the Ministry of Commerce to support the Master Plan.
    • Developed a national logistics information portal for regular updates from ministries.
    • Aims to break down silos within ministries/departments and establish coordinated efforts under Gati Shakti.
    • Implemented a digital master plan leveraging BISAG-N (Bhaskaracharya National Institute for Space Applications and Geoinformatics) and GIS (Geographic Information System) for dynamic mapping of infrastructure projects with real-time updating.
    • Utilizes satellite imagery from ISRO and Survey of India to create base maps for the digital platform (MEGHRAJ - GOI Cloud).

    Framework

    • A framework involves the head of the Cabinet Secretary, responsible for coordinating with empowered secretaries (ESOG), Network Planning Group (NPG), and Technical Support Unit (TSU) in the logistic division.
    • The framework includes a Network Planning Division in charge of infrastructure connectivity.
    • Key stakeholders, representing various ministries, will interact with the Logistic Division.
    • Includes 7 representatives from diverse ministries with 15-20 years of domain experience.

    GCT - Gati Shakti Multi Model Cargo

    • Aims at boosting investments from industries for developing additional rail cargo terminals.
    • Seeks to replace and unify existing private siding/private freight terminal policies, focusing on all new, under-construction, and under-approval private sidings/PFTs.
    • Allows existing terminals to migrate by clearing pending dues, and withdrawing any arbitration/court cases.

    Proposed/Identified GCTs

    • 100 GCTs are targeted to be set up within three years.
    • 74 projects have been proposed.
    • Six units have already been commissioned across various states. Specific states and the number of units proposed/commissioned in each state are listed.

    GCT - SCR

    • Indian Oil siding (Nakkanadoddi/GTL Divn) has been commissioned.
    • Dates for several projects (NTPC/RDM, JVR-OC/SATHUPALLI, VARALAXMI/OPL) are provided with specific dates; other projects and their respective times are listed.

    SDG/PFT vs. DRM vs. GCT (Differences)

    • Process details regarding survey, approval, inspection, and timeline for starting work are described, referencing timelines for each step.
    • DPR elimination, online applications, fees, and feasibility report deadlines are outlined.
    • Details of principle approval and applicant's obligations are listed.
    • Construction deadlines and consequences for non-compliance are elaborated, including specific timeline differences between the models.

    SDG/PFT vs. GCT (Differences)

    • Capital Costs: different take-off points for sidings, discounts to owners.
    • Common User Facilities: serving stations, rebates.
    • Mid-section take-offs: assets within boundaries.
    • Maintenance: track and signalling for mainline stations.

    SDG/PFT vs. GCT (Differences): Staff Costs, Revenue Sharing, Land, Railway Land

    • Staff costs and revenue sharing details differ across various types of projects/models.
    • Clear land acquisition and permitting procedures are outlined; in GCT, land cost is associated with benchmark traffic.
    • Railway land ownership scenarios are differentiated. Ownership, construction, and payment responsibilities are clearly stated, with differences in the models of acquisition and ownership.

    Committee

    • Chairperson, Convenor, and Members with their specific roles and responsibilities defined for each GCT unit; each unit's location is also included.

    Application (Private Land) & Tender (Full/Partially Railway Land)

    • Process details for applications on private land and tenders concerning railway land are provided; outlines for each step of the application and tender processes.
    • Components include feasibility reports, selection through open bids, responsibilities, timelines, and minimum/maximum percentage participation.

    GCT Advantages

    • Land value correlates to Bench Mark Traffic in NTKM, in tiers (e.g., up to 10 Cr corresponds to 200 Million, etc.).
    • Committed traffic and improved commodity basket are advantages. Specific benchmark traffic figures are detailed.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    Description

    Test your knowledge of the Gati Shakti National Master Plan, a framework aimed at enhancing infrastructure development in India. This quiz covers its objectives, key focus areas, and roles of various ministries and organizations involved in the plan.

    More Like This

    Use Quizgecko on...
    Browser
    Browser