Development Permissions Quiz
23 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Who is required to sign plans for construction projects?

  • Any qualified individual
  • Only licensed personnel/architect
  • Both the owner and licensed personnel/architect (correct)
  • Only the owner
  • What color is used to represent existing streets on plans?

  • Blue
  • Green (correct)
  • Yellow
  • Red
  • Who can be granted licenses by the Commissioner?

  • Anyone with a degree in construction management
  • Surveyors, engineers, and architects
  • Anyone who applies
  • Surveyors, engineers, structural engineers, and supervisors with specific qualifications (correct)
  • What color is used to represent permissible buildings on plans?

    <p>Thick Dotted Black</p> Signup and view all the answers

    Which type of constructions by listed organizations are exempted from DCPR 2034 regulations?

    <p>Certain operational constructions</p> Signup and view all the answers

    What type of repairs and renovations of existing installations of buildings used for operational purposes are exempted?

    <p>All repairs and renovations</p> Signup and view all the answers

    What color is used to represent proposed work on plans?

    <p>Red filled in</p> Signup and view all the answers

    What must be included in the building plans for high rise or special buildings along with other mandatory documents?

    <p>Access to fire appliances/vehicles and details of vehicular turning circle</p> Signup and view all the answers

    What power does the Commissioner have over plans and specifications?

    <p>The power to sanction, refuse, or modify plans and specifications</p> Signup and view all the answers

    What color is used to represent water supply work on plans?

    <p>Blue Dotted thin</p> Signup and view all the answers

    What type of repair works to existing Tolerated structures do not require permission?

    <p>Tenantable repair works</p> Signup and view all the answers

    Which type of buildings have mandatory scrutiny by the Chief Fire Officer?

    <p>High-rise buildings and Special buildings</p> Signup and view all the answers

    What happens if there is no response to a notice within 60 days?

    <p>The plans are automatically sanctioned</p> Signup and view all the answers

    What types of constructions have specific requirements for permission?

    <p>Both solar panels and internal light weight partitions/cabins</p> Signup and view all the answers

    What color is used to represent deviations on plans?

    <p>Red Hatched</p> Signup and view all the answers

    What governs development permission granted in the past?

    <p>Section 48 of the MR&amp;TP Act, 1966</p> Signup and view all the answers

    What color is used to represent open spaces on plans?

    <p>No Color</p> Signup and view all the answers

    How often must a development permission/commencement certificate be renewed?

    <p>Every year for four years</p> Signup and view all the answers

    What must the owner/developer provide self-certification regarding?

    <p>Payment of taxes</p> Signup and view all the answers

    Under what conditions may ongoing partially completed works continue?

    <p>Only if they have obtained development permission and a commencement certificate</p> Signup and view all the answers

    What is required for a development permission/commencement certificate?

    <p>Payment of scrutiny fees, charges, premiums, and cess</p> Signup and view all the answers

    What must construction be in accordance with?

    <p>Regulations</p> Signup and view all the answers

    Who is responsible for scrutinizing plans for high-rise and special buildings?

    <p>The Chief Fire Officer</p> Signup and view all the answers

    Study Notes

    • Development permission and a commencement certificate are required for building or altering any structure.
    • Certain operational constructions by listed organizations are exempted from regulations, but must still meet essential service requirements.
    • Repairs and renovations of existing installations of buildings used for operational purposes are exempted.
    • No permission is required for tenantable repair works to existing buildings or for safety grills to windows/ventilators.
    • Solar panels and internal light weight partitions/cabins have specific requirements for permission.
    • Development permission granted in the past is governed by section 48 of the MR&TP Act, 1966.
    • Ongoing partially completed works may continue under certain conditions.
    • DCPR 2034 applies to further development of plots/ layouts/buildings if the owner/developer seeks it.
    • The Municipal Commissioner may formulate a policy to address transitional proposals.
    • Certain listed constructions are not exempted from regulations.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Description

    Test your knowledge on building regulations and permissions with this informative quiz! From development permission to exemptions for operational constructions, this quiz covers all the important aspects of building and altering structures. Discover the specific requirements for solar panels and internal partitions, as well as the rules governing ongoing partially completed works. Learn about section 48 of the MR&TP Act, 1966 and the relevance of DCPR 2034 to further development. Take the quiz to see how well you understand building regulations and permissions!

    More Like This

    Android App Permissions Declaration
    22 questions
    Land Use Regulations Quiz
    40 questions

    Land Use Regulations Quiz

    InstrumentalSandDune avatar
    InstrumentalSandDune
    Use Quizgecko on...
    Browser
    Browser