Questions and Answers

What is a requirement for block instruments concerning their physical structure?

  • They must be of robust construction and approved type. (correct)
  • They must be made only of plastic components.
  • They should be easily accessible for maintenance.
  • They must be made of lightweight materials.
  • What must be included in block instrument installations in areas with induced AC voltages?

  • Wind turbines for energy efficiency.
  • Suitable block instruments with protective measures. (correct)
  • Solar panels to power the instruments.
  • Dismantling capabilities for quick repairs.
  • Which feature must block instruments include to prevent unauthorized manipulation during the Station Master's absence?

  • A locking or other device. (correct)
  • An elaborate alarm system.
  • A user manual.
  • Remote access capabilities.
  • Regarding lightning protection, what is required for block instruments?

    <p>Lightning dischargers must be installed on both wires if a return line wire is used. (A)</p> Signup and view all the answers

    What should not be possible regarding the access to the internal mechanism of block instruments?

    <p>There should be no openings allowing unauthorized operation. (B)</p> Signup and view all the answers

    Which locking feature is implemented in the doors of the block instruments?

    <p>A double lock with shared key custody. (B)</p> Signup and view all the answers

    What is the ideal location for isolating the telephone circuit from the block instrument circuit?

    <p>Within the instrument or in an inaccessible location. (D)</p> Signup and view all the answers

    What type of functionality does a bell push button or plunger provide in block instruments?

    <p>It enables the exchange of bell codes. (B)</p> Signup and view all the answers

    What type of power supply should be used for line circuits of each block instrument?

    <p>Isolated DC-DC Converter (A)</p> Signup and view all the answers

    What visual indication should be displayed when the instruments are normal and no train is in the block section?

    <p>Line Closed (A)</p> Signup and view all the answers

    Which indication must be shown when line clear is granted for a train to leave the block station in the rear?

    <p>Train Coming From (C)</p> Signup and view all the answers

    Which of the following is a necessary feature of the VDU for Embedded type Block working?

    <p>Block Indication display with hot standby (A)</p> Signup and view all the answers

    What must occur before a Station Master can grant line clear to release a token?

    <p>Complete multiple moving operations on the instrument (C)</p> Signup and view all the answers

    What is the purpose of the current indicator on the block instruments?

    <p>To indicate incoming and outgoing line currents (D)</p> Signup and view all the answers

    Which of the following is not a requirement for the power supply housing?

    <p>It should accommodate multiple circuit connections (D)</p> Signup and view all the answers

    What cooperation is necessary when handling 'Train going to' and 'Train coming from' operations?

    <p>Cooperation of the Station Master at the other end (A)</p> Signup and view all the answers

    Which condition must be met before restoring the instruments to normal after a 'Line Closed' setting?

    <p>The cooperative features must be engaged as per para 18.1.2(c). (C)</p> Signup and view all the answers

    What is a requirement for the operation of the 'Line Clear' mechanism?

    <p>Only one of the mechanisms can be in operation at a time. (A)</p> Signup and view all the answers

    What is the sequence of operations after the arrival of a train at the receiving station?

    <p>Restore 'Line Closed' to the last operated instrument. (D)</p> Signup and view all the answers

    When can a token be extracted from the instrument?

    <p>Only when it's set to 'Train Going To'. (D)</p> Signup and view all the answers

    What is a key requirement for the placement of tokens in block instruments?

    <p>Tokens should not be allowed in adjacent section instruments. (A)</p> Signup and view all the answers

    What additional indication must single line tokenless block instruments provide?

    <p>Indication of 'Train on Line' when a train enters the block section. (D)</p> Signup and view all the answers

    How are single line tokenless block instruments designed to mitigate interference?

    <p>They are immune through coded impulse systems. (C)</p> Signup and view all the answers

    What essential feature must tokens display for identification?

    <p>Engraved code names of stations and a serial number. (B)</p> Signup and view all the answers

    What function does an automatic device serve in relation to the Block section?

    <p>It can replace the manual closing of the Block section. (A)</p> Signup and view all the answers

    Which condition is NOT indicated by the visual indicators for the Up and Down Lines?

    <p>Train Approaching (C)</p> Signup and view all the answers

    What is a requirement for the operation of the instrument before granting Line Clear?

    <p>The Station Master must perform definite moving operations. (C)</p> Signup and view all the answers

    What audible indicator function is specified for the receiving station?

    <p>To indicate when the train enters the block section at the sending station. (C)</p> Signup and view all the answers

    What is the purpose of the shunting key in relation to the Block instrument?

    <p>It serves as authority for shunting behind the Last Stop Signal. (C)</p> Signup and view all the answers

    What must the Station Master do in addition to operating the bell plunger before setting the instrument to 'Train Coming From'?

    <p>Perform one or more definite operations on the instrument (C)</p> Signup and view all the answers

    What does the term 'Train on Line' refer to?

    <p>Automatic setting of the instruments when a train enters the block section (D)</p> Signup and view all the answers

    What happens when the instruments are set to 'Line Closed'?

    <p>No further operation to 'Train Going To' or 'Train Coming From' can occur until restored (B)</p> Signup and view all the answers

    Which statement best describes the operation of the Push Button Tokenless Block Instruments for 'Train Going To'?

    <p>A button in addition to the bell button must be operated (B)</p> Signup and view all the answers

    How is the 'Train on Line' indication maintained?

    <p>Until the train has completely cleared the block section (B)</p> Signup and view all the answers

    What additional requirement is there for the instruments to be restored to normal?

    <p>Cooperative features must be activated as outlined (C)</p> Signup and view all the answers

    What does the operation of the bell plunger indicate in the instrument's functionality?

    <p>It operates alongside other definite movements on the instrument (B)</p> Signup and view all the answers

    What is the purpose of having a button for 'Line Closed' conditions?

    <p>To prevent operations until the instruments are set to normal (C)</p> Signup and view all the answers

    Flashcards

    Robust Block Instrument Construction

    Block instruments must be built strong and be of an approved design.

    AC Voltage Protection

    Block instruments need special protection when near power lines to prevent damage from induced AC voltage.

    Block Instrument Working Mediums

    Block instruments can operate on physical conductors or radio/optical fibers, with extra security features for fiber use.

    Lightning Discharger Necessity

    All block instruments require a lightning discharger, with additional requirements if the system uses a return line wire.

    Signup and view all the flashcards

    Preventing Unauthorized Instrument Access

    Instruments must have features to stop unauthorized adjustments or manipulations during any user absence.

    Signup and view all the flashcards

    Locking and Sealing Block Instruments

    Locking and sealing mechanisms are required to secure block instruments, with access restricted using double locks.

    Signup and view all the flashcards

    Telephone Circuit Isolation

    Telephone instruments must be connected with block instruments using isolation methods, with components inside the instrument to prevent external interference.

    Signup and view all the flashcards

    Bell Push Functionality

    Block instruments should have a button for signaling and exchanging codes between different stations.

    Signup and view all the flashcards

    Isolated power supply for block instruments

    A separate power supply (battery or DC-DC converter) for each block instrument, preventing power issues from impacting other systems. It only powers that specific instrument. This is crucial for reliability.

    Signup and view all the flashcards

    Metallic return circuits for block instruments

    Block instruments that use physical conductors (wires) should use metal return paths for the signal current. This guarantees proper signal flow, enabling reliable operation.

    Signup and view all the flashcards

    Embedded Block Working

    Block working built into electronic interlocking systems. Visual displays of block status are available on workstations used by the Assistant Station Master.

    Signup and view all the flashcards

    Block indicator display with hot standby

    The block status is displayed on the workstation, even when the main workstation is not available. This ensures continuous monitoring.

    Signup and view all the flashcards

    Fixed indications for instruments

    The instruments should have visible lights that clearly show the train's presence or absence and line status, e.g., "Line Closed" or "Train Coming From".

    Signup and view all the flashcards

    Line current polarity indicator

    An instrument should show the direction of current flowing in the line (incoming or outgoing).

    Signup and view all the flashcards

    Co-operation required for line clear

    Getting permission from another station for a train to move requires action by both stations. There are steps the master at each station have to take on the equipment.

    Signup and view all the flashcards

    Single-Line Token Block Instruments

    Instruments with fixed indications, current direction indicators and detailed interaction procedures for operating these instruments and granting line clears to each other.

    Signup and view all the flashcards

    Train on Line Indication

    Block instruments automatically switch to "Train on Line" when a train enters a block section. They stay in this state until the train leaves the section.

    Signup and view all the flashcards

    Train Going To/Coming From

    Block instruments are manually set to "Train Going To" or "Train Coming From" by the Station Master. They require a specific operation to change.

    Signup and view all the flashcards

    Line Closed Condition

    Both block instruments are set to "Line Closed" when a section is closed for maintenance. They need cooperation from both Station Masters to return to normal.

    Signup and view all the flashcards

    Station Master Co-operation

    Both Station Masters at the ends of a block section must work together to manipulate the block instruments to specific states.

    Signup and view all the flashcards

    Button Operation

    Push-button block instruments use buttons in addition to the bell button for signal operations. This eliminates the need for Station Master co-operation.

    Signup and view all the flashcards

    Line Closed Operation

    The receiving Station Master uses a button to set both block instruments to the "Line Closed" state. This is a unique feature of push-button systems.

    Signup and view all the flashcards

    Train on Line Automatic Indication

    Push-button block instruments still automatically display "Train on Line" when a train enters a block section.

    Signup and view all the flashcards

    Bell Plunger

    The bell plunger is used with both types of instruments. It operates the bell, which provides an audio signal for communication.

    Signup and view all the flashcards

    Line Clear and Receiving/Granting

    The mechanism that allows a 'Line Clear' signal to be sent and received should be designed to prevent both actions from happening simultaneously. This stops accidental train movements.

    Signup and view all the flashcards

    Tokenless Block Instruments

    Block instruments without physical tokens must have audible indicators to alert receiving stations when a train enters a block section at the sending station or when the train passes the home signal at the receiving station.

    Signup and view all the flashcards

    Double Line Block Indicators

    Double Line Block instruments require separate visual indicators for Up and Down lines to show "Line Closed", "Line Clear", and "Train On Line" statuses.

    Signup and view all the flashcards

    Block Instrument Operation Before Granting Line Clear

    Station masters must perform specific actions on the instrument before granting a 'Line Clear' signal, such as moving levers or working a bell, to ensure deliberate and intentional actions.

    Signup and view all the flashcards

    Audible Indicators in Double Line

    Double Line Block instruments can use audible indicators to warn receiving stations when a train passes the Home Signal and sending stations when a train passes the Last Stop Signal.

    Signup and view all the flashcards

    Line Closed State

    Both instruments at the ends of a block section must be returned to 'Line Closed' before any further train movement operations can occur. This prevents conflicting train movements.

    Signup and view all the flashcards

    Cooperative Line Clear

    Restoring 'Line Closed' requires cooperation between both stations. Neither station can independently return to 'Line Closed' without the other's participation.

    Signup and view all the flashcards

    Line Clear Receiving and Granting

    The mechanism receiving a 'Line Clear' signal and the mechanism granting a 'Line Clear' signal cannot be active simultaneously. This ensures that only one signal is active at a time.

    Signup and view all the flashcards

    Train Going To

    The instrument set to 'Train Going To' initiates a train movement and must be the first to return to 'Line Closed' after the train arrives at the receiving station.

    Signup and view all the flashcards

    Token Extraction

    A token can only be extracted when the instrument is set to 'Train Going To'. Changing the 'Train Going To' condition to 'Line Closed' requires that a token is already inserted in another instrument.

    Signup and view all the flashcards

    Token Placement

    Tokens must be placed in the designated instrument of their respective block sections. They should not be mismatched or placed in the wrong section.

    Signup and view all the flashcards

    Token Engraving

    Tokens are engraved with the station names at both ends of the block section and a serial number. This helps identify the token and its intended block.

    Signup and view all the flashcards

    Fixed Indications

    These instruments use fixed visual indications to show 'Train on Line', 'Line Closed', and other status signals at both sending and receiving stations.

    Signup and view all the flashcards

    Study Notes

    Block Instruments: General Requirements

    • All instruments must be robust, approved, and of an appropriate type
    • Sections with AC voltage may require protective measures per Section standards
    • Instruments are typically used with physical conductors but can use Radio/Optical Fibre Cable when needed, with security measures
    • Lightning dischargers are required and placed on both wires when applicable
    • Access to the interior mechanism must be prevented to avoid irregular operation
    • Block instruments need locking and sealing facilities with keys held by appropriate staff
    • Unauthorized operation prevention measures are mandatory
    • Telephone instruments should be integrated with block instruments ensuring proper isolation of the telephone circuits
    • A bell push/plunger is needed for bell code exchange
    • Isolated power supply (battery/DC-DC converter) is necessary for each line circuit
    • Isolated power supplies only feed the block instrument and not other circuits; Housing is locked and sealed if within the SM's room. Integrated power supplies use DC-DC converter modules for each block.
    • Instruments worked on metallic return circuits

    Special Requirements of Single Line Token Block Instruments

    • Visual indicators are required to show the status of the line; When normal and no train, “Line Closed” at stations; When line clear for a train “Train Coming From” at receiving station; When line clear for a train to leave a station “Train Going To” at sending station
    • An instrument indicating current polarity is needed (incoming/outgoing)
    • Cooperation with staff on the other end of the section is needed when operating
    • Instruments need to be restored to "Line Closed" before changing between "Train Going To"/"Train Coming From" operations
    • "Line Clear" receiving and granting operations can't happen simultaneously
    • Token extraction should only be possible when set to "Train Going To"; Cannot change "Train Going To" conditions until token inserted

    Special Requirements of Single Line Tokenless Block Instruments

    • Visual indicators showing "Train on Line" at both stations when a train enters the block section
    • Instruments to be immune to extraneous currents
    • Cooperation with staff is still needed before changing to “Train Going To” or “Train Coming From” operational states
    • "Train on Line" status should be automatic and maintained until the train leaves the section
    • Instruments need to be restored to "Line Closed" before other operational changes

    Operations: Push Button Tokenless Block Instruments

    • "Train Going To" and "Train Coming From" operations may use cooperation from the other end’s station master
    • A button in addition to the bell button is necessary for “Going To” position
    • "Train on Line" status is automatic, initiated by the train, and maintained until it leaves the section; Additional indications are required
    • Locking and sealing of the instrument housing and "Line Closed" restoration before operations are required

    Special Requirements of Double Line Block Instruments

    • Separate indicators for upward and downward lines are needed to display "Line Closed", "Line Clear", and "Train On Line" conditions
    • Current indicators can also function as current monitors
    • Operation to grant/receive "Line Clear" requires specific procedures
    • Audible indicators warn receiving and sending stations when the train passes the Home/Last Stop signals

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    Description

    Test your knowledge on the general requirements for block instruments. This quiz covers the essential specifications, safety measures, and operational guidelines necessary for effective use. Ensure you understand the electrical standards and installation protocols to prevent unauthorized operations.

    More Like This

    Block Instruments and Safety Measures Quiz
    98 questions
    Block Instruments Safety Standards
    95 questions
    Train Operations Manual Chapter I
    85 questions
    Double Line Block Instruments Overview
    80 questions
    Use Quizgecko on...
    Browser
    Browser