Week 8 Parts 2 - DMP - Y4 PDF

Document Details

StreamlinedRuby

Uploaded by StreamlinedRuby

International Maritime College Oman

2024

Hamid Reza Soltani

Tags

marine power plant ship machinery diesel engine maritime engineering

Summary

This document details procedures for preparing ship machinery before departure, categorized by differing timeframes (24 hours, 6 hours, 1 hour, and 15 minutes) prior to departure. It covers various checks and procedures involving oil levels, pumps, and other critical systems.

Full Transcript

Marine Power Plant (DMARPOWER) Prepared by : Chief Eng. Hamid Reza Soltani Semester-1 2023-2024 LESSON 1...

Marine Power Plant (DMARPOWER) Prepared by : Chief Eng. Hamid Reza Soltani Semester-1 2023-2024 LESSON 14 Marine power plant (deck officer) - diesel engine operating systems- part 6- preparation Marine Diesel Engine Objectives By the end of the lesson, students will be able to: -discuss procedure to prepare the ship main machineries ready before departure -discuss the items or equipment need to check after starting and running the main engine Things to do 24 hours notice prior to departure for the first time -Check the oil level or sound the bunker tanks to measure level and make sure that the temperature is maintained to about 40 degrees or as per analysis report by opening steam. This is done for the transfer of oil from bunker tank to settling tank. If the oil is kept cold the pump might get damaged due to very high viscosity. -Check the jacket water header tank for level and fill accordingly. ( Mohit, 2021) Things to do at 6 hours notice period -Check the oil level in the main engine sump, turbocharger tank. -The duty engineer will start the lubricating oil pump and the cross head pump (generally in sulzer engines) and turbocharger pump. -Check the oil flow through the sight glass of turbocharger outlet. ( Mohit, 2021) Things to do at 6 hours notice period -Check the pressure of lube oil pump and turbocharger pump and cross head pumps. -Start the shaft bearing pumps and check the level of header tank. -Generally in UMS there is a program for starting all these pumps in sequence. This program is started after taking the engine room rounds and the levels are checked. ( Mohit, 2021) Things to do at 1 hour notice period -A quick round of engine room is taken and chief engineer has to be reported regarding the departure. -Check oil level, header tank level, cylinder oil daily tank level. -Check the pressure of fuel oil pump, booster pump, lube oil pump etc. -Check sump oil level in air compressor. ( Mohit, 2021) Things to do at 1 hour notice period -Drain air bottles for any water inside. -Check that the turnning gear is out. -Check parameters of the running machinery. -Start an additional generator so as to supply for additional demand of power from winches and thrusters. ( Mohit, 2021) Things to do at 1 hour notice period -Start exhausts gas boiler water circulating pump. -Check the telegraph for functioning in conjunction with deck officer on watch. -Telegraph is checked for local and remote panels. ( Mohit, 2021) Things to do at 1 hour notice period -Emergency telephones to be checked for functioning. -When the chief engineer is present in control room, go to the steering gear and check for any leaks and port to starboard movement. -Check the functioning of limit switches in steering gear. -Check gyro reading in steering gear and cross check with reading on the bridge. ( Mohit, 2021) Things to do at 15 minutes notice -Open the main air starting valve for main engine. -Ensure all air compressors are in auto and air bottles are full. -Main engine is blown with open indicator cocks with air to check for any water ingress in main engine. -If no leaks or ingress is found chief engineer is reported and the indicator cocks are closed. ( Mohit, 2021) Things to do at 15 minutes notice -Close the turbocharger drain valves. -Chief engineer reports to captain on bridge that the engine is ready for use and control is transferred to the bridge from engine control room. -Flow meter counters of main engine, generator and boiler are taken for calculation purposes of oil in port. ( Mohit, 2021) Checks made when the engine is running -Engine room round is taken again. -Check for any abnormality. -Check all the parameters of the main engine like temperature of exhaust valve, jacket water etc. -Close steam heating for jacket later if not auto controlled. -Once the ship is out from the port and pilot has left, open the other sea suction valve. ( Mohit, 2021) Checks made when ship is full away -Stop the additional generator. -Stop the boiler if exhaust gas boiler is fitted. -Start fresh water generator. -Open sewage overboard valve. -Start turbine and shaft generator if fitted. -Take flow meter counter again for calculation of fuel consumed from port to full away. -The watch is handed over to next duty engineer if watch has to be changed. -In case of UMS ship, the bridge is informed after taking rounds of the engine room, about your taking break. ( Mohit, 2021) Diesel Engine Reference : Mohit (2021). Ship Departure Checklist for Engine Department: What to Do When a Ship Leaves a Port?. Marineinsight https://www.marineinsight.com/guidelines/ship-departure-checklist- for-engine-department-what-to-do-when-a-ship-leaves-a- port/(marineinsight.com)

Use Quizgecko on...
Browser
Browser