Work Management Playbook Chapter 4

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What is the primary goal of the Work Management Playbook's approach to CM costs?

  • Maximize expedient response and recovery, regardless of costs.
  • Minimize CM costs, even if it means delaying response and recovery.
  • Prioritize specific CM costs over response and recovery needs.
  • Strike a balance between rapid response and recovery, while carefully managing CM costs. (correct)

In the context of HVAC/AC changeovers, what is the recommended approach for managing time?

  • Refer to BPL documents to determine the appropriate time approach. (correct)
  • Use a direct time approach for all HVAC/AC changeovers.
  • There is no specific recommendation for time management in HVAC/AC changeovers.
  • Use an indirect time approach for all HVAC/AC changeovers.

How should Facility Operations (FO) requirements be managed in the Work Management Playbook?

  • FO requirements should be handled by the Responsible Organization, even if it's not an FO WG.
  • FO requirements should be assigned to a WT, with resources assigned to the WT to track FO costs. (correct)
  • All FO requirements should be assigned to a single FO WG.
  • There should be separate WTs created for each FO requirement.

What is the primary reason for assigning non-FO WG personnel as resources to FO WTs?

<p>To ensure that FO costs are captured correctly. (D)</p> Signup and view all the answers

Which of the following is an example of a task that would NOT be assigned to a WT with a non-FO WG as the Responsible Organization?

<p>HVAC maintenance (A)</p> Signup and view all the answers

What is the primary role of the CEOER Requirements Section?

<p>To review new work tasks and forward requirements to relevant workgroups (C)</p> Signup and view all the answers

Which of the following activities is NOT performed by the CEOER Optimization Section?

<p>Reviews comments from coordinating agencies (C)</p> Signup and view all the answers

What triggers the forwarding of a work task to the Operations Planning Workgroup?

<p>If it does not meet work classification or approval authority of the reviewer (C)</p> Signup and view all the answers

What is a responsibility of the ATA Workgroup?

<p>Initiating and processing work clearance requests as necessary (C)</p> Signup and view all the answers

Who chairs the WRWG?

<p>A designated member of the CEOE (D)</p> Signup and view all the answers

What does the AF Form 103 request pertain to?

<p>Submitting a work clearance request for approval (C)</p> Signup and view all the answers

Which section develops the draft DD Form 1354 as part of their responsibilities?

<p>CEOER Optimization Section (B)</p> Signup and view all the answers

What is the purpose of work clearance agencies in the process?

<p>To review the requirement and associated maps (C)</p> Signup and view all the answers

What is the primary purpose of the WRWG process?

<p>To evaluate and collaborate on requirements before the WRRB process (C)</p> Signup and view all the answers

Which types of work require processing through the WRWG?

<p>Work requiring capitalization, Restoration &amp; Modernization, and construction (C)</p> Signup and view all the answers

What action can the WRWG chair take if further collaboration is deemed necessary?

<p>Bring the actors together for further discussions (A)</p> Signup and view all the answers

During the WRWG process, who must review the requirements regardless of capitalization?

<p>CEOER Sub-AMP Managers (C)</p> Signup and view all the answers

What does the acronym FP stand for in the context of work requests?

<p>Facility Project (C)</p> Signup and view all the answers

What role does the WRWG play in capitalization decisions?

<p>They advise the WRRB on capitalization and seek approval (A)</p> Signup and view all the answers

Which method is used by users to facilitate the WRWG process?

<p>BPL-Coordination process (C)</p> Signup and view all the answers

What is the ultimate responsibility of the BCE regarding funding?

<p>To formulate and execute the financial management plan (D)</p> Signup and view all the answers

How are WTs typically reviewed in relation to the WRRB?

<p>Normal expectation is for WTs to be reviewed and proceed to WRRB (C)</p> Signup and view all the answers

What is the protocol if the WRWG is not delegated authority for an FP?

<p>Local policy dictates that detailed planning is required at WRRB (D)</p> Signup and view all the answers

What occurs if a WT requires additional scope changes during planning?

<p>Coordination is re-accomplished through the FP process if needed (D)</p> Signup and view all the answers

What happens to WTs that do not require a FP?

<p>They could be sent for review through the FOFP process if appropriate (D)</p> Signup and view all the answers

What documents are utilized for planning, design, and programming of construction projects?

<p>DAFI 32-1020 and AFMAN 32-1084 (A)</p> Signup and view all the answers

What must be completed before any work (contract or in-house) on certain activities is authorized?

<p>Approval of an AF Form 103 (D)</p> Signup and view all the answers

To which project should labor costs be allocated when performing work clearance requests processed by shops?

<p>The WT that the work clearance markings are supporting (A)</p> Signup and view all the answers

What is a requirement of the USORT Tool?

<p>To provide real-time reporting on utility outages (A)</p> Signup and view all the answers

What type of events may necessitate the tracking of storm damage through the O&M Storm Damage Tracker?

<p>Large-scale natural disasters (A)</p> Signup and view all the answers

What should be annotated against requirements to accurately report costs during emergencies?

<p>ESP codes (B)</p> Signup and view all the answers

Who should ideally be responsible for tracking storm-related requirements?

<p>A designated 'storm czar' (A)</p> Signup and view all the answers

Which of the following is NOT a situation that requires a Work Clearance Request?

<p>Drilling at a depth of 3 inches (B)</p> Signup and view all the answers

What does each Work Task (WT) created during the Work Clearance Process require for asset tracking?

<p>Facility Number as Primary Location (D)</p> Signup and view all the answers

What is a critical aspect of tracking storm damage effectively?

<p>Justifying cleanup and repair costs (D)</p> Signup and view all the answers

What is required when installing a Facilities and Operations Forecasting Plan (FOFP)?

<p>Associating it with a specific ESP code (A)</p> Signup and view all the answers

What action must be taken when a large-scale storm event occurs?

<p>Submit for reimbursements using the O&amp;M Storm Damage Tracker (B)</p> Signup and view all the answers

Which tool is utilized for tracking utility system outages associated with storms?

<p>USORT Tool (C)</p> Signup and view all the answers

What should the Operations Flight do concerning the history of storm damage work tracking?

<p>Establish a systematic tracking method (D)</p> Signup and view all the answers

What is required for funding a facility project before it can be processed?

<p>Approval from leadership during the WRRB process. (C)</p> Signup and view all the answers

Which report is utilized to manage assigned Facility Projects (FP) and their Work Tasks (WT)?

<p>RO-Rpt-006 (A), WM-Rpt-009 (C)</p> Signup and view all the answers

What triggers the automatic start of Construction in Progress (CIP) in NexGen IT?

<p>First occurrence of labor or materiel transaction. (B)</p> Signup and view all the answers

Which factor is NOT a consideration for the WRWG to determine if a Facility Project is needed?

<p>Simplicity of planning. (D)</p> Signup and view all the answers

What is the primary purpose of grouping Work Tasks within a Facility Operations Facility Project (FOFP)?

<p>To aggregate costs for budgeting. (D)</p> Signup and view all the answers

Which classification allows for a requirement to be handled without formal management processes?

<p>CBRs approved by WRRB (D)</p> Signup and view all the answers

What must happen before funding codes can be migrated according to the process described?

<p>Completion of CBR work. (C)</p> Signup and view all the answers

What is essential for a requirement deemed complex by the WRWG?

<p>A Facility Project must be initiated. (B)</p> Signup and view all the answers

Who is the appropriate manager responsible for the Quality Assurance of contracted work?

<p>Sub-Amp Manager. (B)</p> Signup and view all the answers

Which of the following reports is utilized to monitor approved versus actual costs?

<p>RO-Rpt-007 (A)</p> Signup and view all the answers

What action should be taken for the development of facility projects requiring coordination across multiple workgroups?

<p>Consolidation into a singular FP is recommended. (A)</p> Signup and view all the answers

What is the primary responsibility of the CEO (designee) in the Work Request Working Group (WRWG)?

<p>Determining the availability of resources and authorizing requirements (A)</p> Signup and view all the answers

Which document outlines general procedures for planning and programming O&M-funded projects?

<p>DAFI 32-1020 (B)</p> Signup and view all the answers

What do FOFPs require regarding the process for creation?

<p>Creation is unrestricted and can be done by any personnel. (D)</p> Signup and view all the answers

Which of the following accurately describes the purpose of the Optimization Section?

<p>To serve as the focal point for developing and managing proposed requirements (D)</p> Signup and view all the answers

For which type of funding or projects is processing required to be forwarded to CEN?

<p>MILCON and similar contract modes. (A)</p> Signup and view all the answers

Which statement is true about the WRWG process?

<p>It evaluates and prepares CE work request requirements. (D)</p> Signup and view all the answers

What initial action does the Operations Planner take if a requirement exceeds their delegation authority?

<p>Review the requirement at the WRWG for initial scoping and estimating. (D)</p> Signup and view all the answers

When should a Purchase Request (PR) be created by the Foreman?

<p>To ensure material availability for a future scheduled start date. (C)</p> Signup and view all the answers

What is the role of the WRWG Chair?

<p>To determine the appropriate course of action during WRWG meetings. (D)</p> Signup and view all the answers

What type of materials can be issued over-the-counter (OTC)?

<p>Direct and indirect materials that do not require detailed planning. (D)</p> Signup and view all the answers

Which is true about the Detailed Planning phase?

<p>It ensures planned costs are populated on each Work Task. (C)</p> Signup and view all the answers

What does the acronym GPC stand for in the context of procurement?

<p>Government Purchase Card (C)</p> Signup and view all the answers

How are actions arising from emergent issues typically handled?

<p>By assigning a technician to procure available materials. (A)</p> Signup and view all the answers

Which role reviews Work Tasks (WT) and Future Projects (FP)?

<p>CEO Operations Flight Chief (A)</p> Signup and view all the answers

What type of estimate is formulated for Capital Project level requirements?

<p>Class 5 Estimate (B)</p> Signup and view all the answers

What is the significance of scheduling in the WRWG process?

<p>It dictates the order of task executions based on the available resources. (A)</p> Signup and view all the answers

What is the function of the 'Responsible Organization' within the WRWG?

<p>To ensure the completion of the WRWG Checklist by the Manager. (C)</p> Signup and view all the answers

Which factor influences the decision to approve or disapprove a Work Clearance Request?

<p>The availability of funding and resources. (C)</p> Signup and view all the answers

Flashcards

WM activities

Work Management activities that prepare requirements for execution and record management.

CEOER

The entity responsible for reviewing and forwarding Work Requirements (WTs) for execution.

ATA Workgroup

A shop group that processes Work Clearance Requests and manages requirements within scope.

Requirements Section Responsibilities

Assesses and assigns Work Requirements to appropriate workgroups based on authority.

Signup and view all the flashcards

FOFP

Formal Operational Field Plan created from Work Requirements determined for in-house execution.

Signup and view all the flashcards

WRWG/WRRB

Work Requirement Working Group/Review Board responsible for approving plans and addressing issues.

Signup and view all the flashcards

DD Form 1354

Document used for recording and processing requirements as part of work clearance.

Signup and view all the flashcards

Work Clearance Requests

Forms submitted to request approval for work to be conducted, ensuring compliance.

Signup and view all the flashcards

Goal of Work Management

Balance expedient response and CM costs for facilities effectively.

Signup and view all the flashcards

FO Requirements Reporting

FO WG must be assigned to capture correct FO costs on WTs.

Signup and view all the flashcards

Non-FO WG in WTs

No WTs for FO requirements with non-FO WGs assigned.

Signup and view all the flashcards

Facility Operations (FO) Costs

FO costs must be accurately recorded through proper assignment.

Signup and view all the flashcards

Resources Assignment for WTs

All resources for FO requirements must be linked to the FO WG.

Signup and view all the flashcards

WRWG

Work Review Working Group overseeing requirement evaluations and collaboration.

Signup and view all the flashcards

Meeting Agenda

A list of items to be accomplished in a meeting.

Signup and view all the flashcards

Sub-AMP Managers

Managers who review requirements within the WRWG process.

Signup and view all the flashcards

In-House Shop

Work Tasks approved for execution directly by internal teams.

Signup and view all the flashcards

CEN

Engineering requirements managing Capital Projects.

Signup and view all the flashcards

FP Requirement

Facility Project requiring detailed planning and scheduling.

Signup and view all the flashcards

Capitalization

Process determining if capitalization is needed for a project.

Signup and view all the flashcards

WRRB

Work Request Review Board making approval decisions.

Signup and view all the flashcards

WT Validation

Process confirming work tasks before moving to the WRRB.

Signup and view all the flashcards

FP Coordination

Ongoing communication required if scope changes during planning.

Signup and view all the flashcards

FP Processing

Steps taken to submit the finalized Facility Project for review.

Signup and view all the flashcards

Funding Responsibility

Accountability for formulating and executing financial plans.

Signup and view all the flashcards

Work Task (WT)

An individual task submitted through the WRWG process.

Signup and view all the flashcards

DAFI 32-1020

Regulatory guide for planning and managing projects.

Signup and view all the flashcards

CEO (designee)

Chairs the WRRB, oversees resource management and scheduling.

Signup and view all the flashcards

Operations Flight Chief

Reviews work tasks and approves AF Form 103 requests.

Signup and view all the flashcards

Optimization Section

Focuses on developing requirements and analyzing resource use to fulfill them.

Signup and view all the flashcards

Initial Scoping and Estimating

Early assessment of requirements outside delegation authority to guide actions.

Signup and view all the flashcards

Purchase Request (PR)

Formal request to ensure material availability for future planning.

Signup and view all the flashcards

Over-the-Counter (OTC)

Direct material issuance for immediate needs without detailed planning.

Signup and view all the flashcards

Emergent Issue

Partial material issuance for urgent situations to mitigate emergencies.

Signup and view all the flashcards

Detailed Planning

In-depth planning for in-house requirements needing formal review and approval.

Signup and view all the flashcards

Work Request Working Group (WRWG)

Group evaluating and preparing work request requirements for the CE.

Signup and view all the flashcards

Responsible Organization

Designated entity for managing work request reviews and actions.

Signup and view all the flashcards

Stakeholders (in WRWG)

Individuals reviewing requirements and providing feedback in WRWG.

Signup and view all the flashcards

Class 5 Estimate

Estimate used for capital projects to guide funding decisions.

Signup and view all the flashcards

In-house Planning

Process for planning tasks that can be accomplished without outside resources.

Signup and view all the flashcards

Funding and Scheduling Decisions

Choices made for financial allocation and timing of work tasks.

Signup and view all the flashcards

BCE Responsibilities

BCEs must establish management processes to comply with laws.

Signup and view all the flashcards

AF Form 103

A request form for Work Clearance essential for work authorization.

Signup and view all the flashcards

Work Clearance Request Purpose

Processed before any work that could disrupt key services or safety.

Signup and view all the flashcards

Cost Allocation for Shops

Labor costs for clearance requests linked to specific tasks.

Signup and view all the flashcards

Internal/External Agencies Work Clearances

Costs for work clearances assigned to specific fiscal tasks.

Signup and view all the flashcards

USORT Tool

Utility System Outage Report Tool for tracking outages in real-time.

Signup and view all the flashcards

ESP Codes

Special accounting codes to track emergency-related costs.

Signup and view all the flashcards

Storm Damage Tracker

A system established to record and manage storm damage costs.

Signup and view all the flashcards

Natural Disaster Reporting

Requires specific FOFP with related working tasks for large events.

Signup and view all the flashcards

O&M Storm Damage Tracker Requirements

Rules set for documenting storm damage and funding requests.

Signup and view all the flashcards

Major Event Cost Justification

Tracking costs is crucial after significant natural events for funding support.

Signup and view all the flashcards

Cleanup Work Types

Specific work tasks assigned for general installation clean-up after damage.

Signup and view all the flashcards

Damage Assessment Collection

Initial assessments grouped under specific work tasks for more complex management.

Signup and view all the flashcards

Facility Requirements in FOFP

Specific facility requirements recorded with unique tasks for damage recovery.

Signup and view all the flashcards

Tracking Recovery Costs

Documenting costs for recovery efforts to reinforce resource allocation requests.

Signup and view all the flashcards

O&M Funding

Funding for Operations and Maintenance projects as outlined in DAFI 65-601 V1.

Signup and view all the flashcards

WRRB Process

Work Requirements Review Board process for project funding approval.

Signup and view all the flashcards

Construction in Progress (CIP)

CIP indicates ongoing minor construction actions in a project.

Signup and view all the flashcards

Facility Projects

Projects related to the maintenance and repair of facilities.

Signup and view all the flashcards

Quality Assurance (QA)

Process of ensuring project requirements are met to standards.

Signup and view all the flashcards

Minor Construction (M/C)

Construction projects that are below a certain cost threshold.

Signup and view all the flashcards

CBR (Contracted Base Requirement)

Requirements that may not need detailed management processes.

Signup and view all the flashcards

SABER

Simplified acquisition process used for construction projects.

Signup and view all the flashcards

MILCON

Military Construction, a funding category for large projects.

Signup and view all the flashcards

NexGen IT

Information Technology system for managing work processes.

Signup and view all the flashcards

Work Clearance Request (AF Form 103)

A formal request to ensure workspace safety before work begins.

Signup and view all the flashcards

PR (Purchase Request)

Formal request to procure materials for a project.

Signup and view all the flashcards

Study Notes

Work Management Playbook - Requirements Processing

  • Requirement Processing Steps: Requirements go through several stages: processing, tracking, coordinating, and planning to prepare them for execution. Record management activities follow assignment to a workgroup.

  • CEOER Review & Routing: The Requirements Section reviews new work tasks (WTs). Requirements within delegated authority are sent directly to the appropriate shop. Those needing further classification or approval are sent to the Operations Planning Workgroup.

  • Roles & Responsibilities (CEOER): The Requirements Section assigns WTs, creates forms (FOFP), and related work tasks. The Optimization Section creates facility projects (FPs), groups similar tasks, coordinates as needed, and submits for reviews by the Work Request Working Group (WRWG) or Work Request Review Board (WRRB) as necessary. They also create purchase requests (PRs) and AF Form 103 work clearance requests.

  • Roles & Responsibilities (ATA Workgroup): ATA shops initiate and process work clearance requests, create/validate PRs, develop draft forms (DD Form 1354), coordinate requirements, and handle warranty work.

  • Roles & Responsibilities (WRWG): The WRWG reviews requirements, assigns tasks to locations (based on scope, funding), and sends tasks to engineering if out of scope for Operations Flight. They direct CEOER to plan FPs and forwards them to the WRRB.

  • Roles & Responsibilities (Coordinating Agencies): Provide comments and details necessary for WRWG/WRRB/FUB processes.

  • Roles & Responsibilities (Work Clearance Agencies): Review requirements, mark locations, and coordinate AF Form 103.

  • Roles & Responsibilities (WRRB): Oversees process, determines funding availability for requirements, sets schedules, and approves/disapproves, or identifies alternative execution (e.g., sending a WT to Engineering).

  • Roles & Responsibilities (CEO/Operations Flight Chief): Reviews WTs and FPs, approves/disapproves AF Form 103, and approves/disapproves WTs and FPs.

Optimization Section

  • Focal Point: The Optimization Section is the central point for requirement development, management, and resource analysis for validated requirements within the CEOER Operations Planning Workgroup.

Plan Work

  • Methods: Planning can be done through initial scoping and estimating by managers during WRWG, in-house planning by foremen at the shop-level, or detailed planning for in-house FPs or WTs by managers.

Initial Scoping and Estimating

  • WRWG Review: Requirements outside the Requirements Section's delegation authority or shop scope are reviewed by the WRWG team as part of the initial scope and estimate.
  • Capital Projects (CEN): A Class 5 estimate is created for capital project requirements to support determination by the WRWG chair.

ATA Workgroup In-House Planning

  • Direct Assignment: Requirements might be sent directly from the Requirements Section to the shop for in-house planning and execution.
  • Purchase Requests (PRs): Used for materiel needs when foremen need to ensure materiel is available before a scheduled start date.
  • Over-the-Counter (OTC): Used for most requirements not needing detailed planning.
  • Emergent Issues: In emergencies, obtaining available materiel via OTC, Government Purchase Cards (GPCs), or other methods can temporarily resolve situations.

Detailed Planning

  • Optimization Section Management: Detailed planning and/or WRRB review is handled by the Optimization Section assigned manager.
  • Planned Costs: Managers ensure detailed planning is done, and costs are appropriately recorded for in-house requirements.
  • PRs for Materiel: PRs are created for the needed materiel for achieving each work task.
  • WRRB Approval: Requirements are processed to the WRRB for approval, funding, and scheduling.

Work Request Working Group (WRWG)

  • Process Description: Evaluation and preparation for CE work request requirements for work not directly assigned to shops.
  • Responsible Organization: The CEOER Operations Planning Workgroup (Manager) performs the WRWG review process.
  • Stakeholder Review: Stakeholders review identified requirements and provide comments before meetings. Collaboration meetings are held depending on needed collaboration and the WRWG Chair's determination.
  • Sub-AMP Review: Sub-AMP Managers must verify alignment with mid-to-long-range plans. Coordination with other parties (e.g., CE Programmer, CEFM) is mandatory for specific requirements.
  • Alternative Processing: WTs not requiring FPs or detailed planning can be sent to other groups (shops, engineering, other contract modes) or approved manually by the WRWG Chair, if authorized.

Work Request Review Board (WRRB)

  • Decision-Making: Approval, execution, and scheduling decisions are made in response to WRWG input.
  • Capitalization: The WRWG advises the WRRB on capitalization and which process is best for the requirement.
  • WT/FP Determination: WRRB decisions include determining if a requirement needs a FP or can remain as a WT.

FP Coordination/Processing

  • Coordination: Repetitive coordination is avoided; initial coordination acquired during WT review is only recreated through FP Schedule Tasks if the Scope of Work changes.

Funding

  • Commander Responsibility: The commander (BCE) or designee manages the financial plan according to guidelines (AFI 65-601 V2, DAFI 65-601 V1). Asset management principles are employed to approve, fund, and manage requirement execution. All required materiel is included in the PRs on the associated WTs.
  • Funding Authorization: Funding is needed before any PR issued to CEOEM for WT(s) assigned to an FP.

Construction In Progress (CIP)

  • Automatic Start: CIP starts automatically in NexGen IT when labor or material transactions occur, removing extra effort needed by Operations Flight personnel.

Work Clearance Request (AF Form 103)

  • Purpose: Needed before any work (in-house or contract) that involves specific activities (excavations, airfield disruption, utility interruptions, traffic obstruction, etc.
  • Cost Allocation: Shops record labor to the WT for the work clearance, and external or internal customers' costs are allocated to the appropriate FY FOFP.
  • Asset Annotation (WT): Facility numbers are annotated as Primary Locations for protection of linear assets.

Requirements Processing (Situational Processes)

  • Tracking of Special Events: Storm damage events or major events need storm trackers, utility outage tools, and emergency/special program codes for proper tracking and resource allocation. Use of the USORT Tool is crucial for real-time reporting.

  • Natural Disaster Handling: A FOFP is created to track all WTs related to a major event (e.g., typhoon, hurricane). Specific WTs are defined for damage assessment and general cleanup activities

  • Other Specific Requirements: Different requirements (e.g., refrigerant management, HVAC/AC changeovers) have specific handling procedures. Detailed processes for facility operations and pavement/entomology maintenance tasks are critical to capture all costs correctly.