According to the Power Engineers Regulation AR 85-2018, what is the maximum rating for a power plant (general) that a Third Class Power Engineer may operate as Chief Power Engineer?
According to the Power Engineers Regulation AR 85-2018, what is the maximum rating for a power plant (general) that a Third Class Power Engineer may operate as Chief Power Engineer?
- Up to 20,000 kW
- Up to 1000 kW
- Up to 5000 kW (correct)
- Up to 10,000 kW
According to the Power Engineers Regulation AR 85-2018, what is the maximum rating for a power plant (oilfield once-through boiler) that a Third Class Power Engineer may operate as Chief Power Engineer?
According to the Power Engineers Regulation AR 85-2018, what is the maximum rating for a power plant (oilfield once-through boiler) that a Third Class Power Engineer may operate as Chief Power Engineer?
- Up to 20,000 kW
- Up to 10,000 kW (correct)
- Up to 1000 kW
- Up to 5000 kW
What is a historic boiler according to the Power Engineers Regulation AR 85-2018?
What is a historic boiler according to the Power Engineers Regulation AR 85-2018?
- A boiler used in a steam locomotive (correct)
- A boiler used in a power plant
- A boiler used in a historic building
- A boiler used in an oilfield power plant