Welding Certificates and Qualification Tests

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson
Download our mobile app to listen on the go
Get App

Questions and Answers

According to the Power Engineers Regulation AR 85-2018, what is the maximum rating for a power plant (general) that a Third Class Power Engineer may operate as Chief Power Engineer?

  • Up to 20,000 kW
  • Up to 1000 kW
  • Up to 5000 kW (correct)
  • Up to 10,000 kW

According to the Power Engineers Regulation AR 85-2018, what is the maximum rating for a power plant (oilfield once-through boiler) that a Third Class Power Engineer may operate as Chief Power Engineer?

  • Up to 20,000 kW
  • Up to 10,000 kW (correct)
  • Up to 1000 kW
  • Up to 5000 kW

What is a historic boiler according to the Power Engineers Regulation AR 85-2018?

  • A boiler used in a steam locomotive (correct)
  • A boiler used in a power plant
  • A boiler used in a historic building
  • A boiler used in an oilfield power plant

Flashcards are hidden until you start studying

Related Documents

Power Engineers Regulations PDF
Use Quizgecko on...
Browser
Browser