Questions and Answers

According to the Power Engineers Regulation AR 85-2018, what is the maximum rating for a power plant (general) that a Third Class Power Engineer may operate as Chief Power Engineer?

  • Up to 5000 kW (correct)
  • Up to 1000 kW
  • Up to 15,000 kW
  • Up to 10,000 kW
  • According to the Power Engineers Regulation AR 85-2018, what is the maximum rating for a power plant (oilfield once-through boiler) that a Third Class Power Engineer may operate as Chief Power Engineer?

  • Up to 1000 kW
  • Up to 5000 kW
  • Up to 10,000 kW (correct)
  • Up to 15,000 kW
  • According to the Power Engineers Regulation AR 85-2018, what is a historic boiler?

  • A boiler that is no longer in use
  • A boiler that is part of a power plant of historic interest (correct)
  • A boiler used in historic buildings
  • A boiler that has been in operation for more than 50 years
  • According to the Power Engineers Regulation AR 85-2018, what is the range of boiler capacity in kilowatts that a Third Class Power Engineer can operate as shift engineer?

    <p>Up to 10,000 kW</p> Signup and view all the answers

    According to the Pressure Welders Regulation AR 169-2014, what is the name of the card that is part of a certificate of competency and is issued to a pressure welder who succeeds at a performance qualification test?

    <p>Performance qualification card</p> Signup and view all the answers

    According to the Power Engineers Regulation AR 85-2018, what section describes the steps that the administrator must follow once the pressure equipment design has been registered?

    <p>Section 6</p> Signup and view all the answers

    According to the Power Engineers Regulation AR 85-2018, what must the owner do in case of unsafe conditions, accident, or fire related to pressure equipment?

    <p>Report to the administrator within 24 hours</p> Signup and view all the answers

    According to the Power Engineers Regulation AR 85-2018, which codes and standards are listed in AR / 49, Section 6?

    <p>NFPA 58-2014, NFPA 59-2015</p> Signup and view all the answers

    According to the Power Engineers Regulation AR 85-2018, what is the maximum rating for a power plant (general) that a Third Class Power Engineer may operate as Chief Power Engineer?

    <p>Up to 5000 kW</p> Signup and view all the answers

    According to the Power Engineers Regulation AR 85-2018, what is the maximum rating for a power plant (oilfield once-through boiler) that a Third Class Power Engineer may operate as Chief Power Engineer?

    <p>Up to 10,000 kW</p> Signup and view all the answers

    Study Notes

    Power Engineers Regulation AR 85-2018

    • A Third Class Power Engineer may operate as Chief Power Engineer for a power plant (general) with a maximum rating of 10 MW.
    • A Third Class Power Engineer may operate as Chief Power Engineer for a power plant (oilfield once-through boiler) with a maximum rating of 5 MW.

    Boiler Capacity

    • A Third Class Power Engineer can operate as a shift engineer for boilers with a capacity range of 10 kW to 500 kW.

    Historic Boiler

    • A historic boiler is defined as a boiler that was in operation before June 30, 1957.

    Pressure Welders Regulation AR 169-2014

    • A pressure welder who succeeds at a performance qualification test is issued a "Performance Qualification Card" as part of their certificate of competency.

    Pressure Equipment Design

    • Section 10 of the Power Engineers Regulation AR 85-2018 describes the steps that the administrator must follow once the pressure equipment design has been registered.

    Safety Requirements

    • In case of unsafe conditions, accident, or fire related to pressure equipment, the owner must inform the Administrator and take immediate corrective action.

    Codes and Standards

    • Section 6 of the Power Engineers Regulation AR 85-2018 lists the following codes and standards: ASME, ASME B31, and API.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    Power Engineers Regulations PDF

    Description

    Test your knowledge on welding certificates and performance qualification tests with this quiz. Learn about the scope of the certificate, conductors of qualification tests, and other important rules and topics.

    More Like This

    Use Quizgecko on...
    Browser
    Browser