Questions and Answers
What is the purpose of the procedure mentioned in the text?
What is the purpose of the procedure mentioned in the text?
- To conduct maintenance on an individual UV Train PDC panel while keeping the rest of the UV Train online (correct)
- To shut down all the UV reactors in the UV Train
- To inform the Control Room Operator about the UV Train maintenance
- To start up the standby reactor in the UV Train
What can be done without disrupting the reactor operation?
What can be done without disrupting the reactor operation?
- Informing the Control Room Operator about the maintenance
- Shutting down all the UV reactors in the UV Train
- Switching all running reactors from 'Local' to 'Remote'
- Switching the UV Train PDC panels from 'Remote' to 'Local' (correct)
How many reactors should be running at a minimum according to the procedure?
How many reactors should be running at a minimum according to the procedure?
- At least 5 reactors (correct)
- At least 4 reactors
- At least 6 reactors
- At least 3 reactors
When should the standby reactor be put to 'Local'?
When should the standby reactor be put to 'Local'?
What would be noticeable to the operators on the PCS during this procedure?
What would be noticeable to the operators on the PCS during this procedure?
What is the purpose of waiting 6 to 7 minutes for the 'Standby Reactor' to complete its warm up and enter the 'On Line' mode?
What is the purpose of waiting 6 to 7 minutes for the 'Standby Reactor' to complete its warm up and enter the 'On Line' mode?
What is the significance of switching all running reactors from 'Remote' to 'Local'?
What is the significance of switching all running reactors from 'Remote' to 'Local'?
What action should be taken after all the reactors are confirmed 'On Line'?
What action should be taken after all the reactors are confirmed 'On Line'?
What does the interlock switch prevent?
What does the interlock switch prevent?
What should be done after completing service work on the PDC panel?
What should be done after completing service work on the PDC panel?
What happens when a reactor is switched back to 'Remote' mode from 'Local'?
What happens when a reactor is switched back to 'Remote' mode from 'Local'?
What is the purpose of the 5-minute delay for UV Reactor warm-up in PCS Logic?
What is the purpose of the 5-minute delay for UV Reactor warm-up in PCS Logic?
When can work be performed on the actual UV reactor?
When can work be performed on the actual UV reactor?
'HOA' switch should be put to which mode when restarting the reactor?
'HOA' switch should be put to which mode when restarting the reactor?
How long should one wait for the 'Standby Reactor' to complete its warm up before confirming it is 'On Line'?
How long should one wait for the 'Standby Reactor' to complete its warm up before confirming it is 'On Line'?
What action indicates that all reactors are confirmed 'On Line'?
What action indicates that all reactors are confirmed 'On Line'?