What is the purpose of the procedure mentioned in the text?

  • To conduct maintenance on an individual UV Train PDC panel while keeping the rest of the UV Train online (correct)
  • To shut down all the UV reactors in the UV Train
  • To inform the Control Room Operator about the UV Train maintenance
  • To start up the standby reactor in the UV Train
  • What can be done without disrupting the reactor operation?

  • Informing the Control Room Operator about the maintenance
  • Shutting down all the UV reactors in the UV Train
  • Switching all running reactors from 'Local' to 'Remote'
  • Switching the UV Train PDC panels from 'Remote' to 'Local' (correct)
  • How many reactors should be running at a minimum according to the procedure?

  • At least 5 reactors (correct)
  • At least 4 reactors
  • At least 6 reactors
  • At least 3 reactors
  • When should the standby reactor be put to 'Local'?

    <p>When 5 reactors are running</p> Signup and view all the answers

    What would be noticeable to the operators on the PCS during this procedure?

    <p>Switching the 'HOA' switches from 'Remote' to 'Local'</p> Signup and view all the answers

    What is the purpose of waiting 6 to 7 minutes for the 'Standby Reactor' to complete its warm up and enter the 'On Line' mode?

    <p>To confirm that the newly started reactor will not fail due to some other problem</p> Signup and view all the answers

    What is the significance of switching all running reactors from 'Remote' to 'Local'?

    <p>To stop the reactor without disrupting its operation</p> Signup and view all the answers

    What action should be taken after all the reactors are confirmed 'On Line'?

    <p>Secure the reactor chosen for service by switching from 'Local' to 'Off' at the PDC Panel switch</p> Signup and view all the answers

    What does the interlock switch prevent?

    <p>Performing work on the actual UV reactor</p> Signup and view all the answers

    What should be done after completing service work on the PDC panel?

    <p>Restart the reactor by putting the 'HOA' switch to 'Local' and warming up the unit</p> Signup and view all the answers

    What happens when a reactor is switched back to 'Remote' mode from 'Local'?

    <p>It drops out to 'Standby'</p> Signup and view all the answers

    What is the purpose of the 5-minute delay for UV Reactor warm-up in PCS Logic?

    <p>To prevent plant shutdown</p> Signup and view all the answers

    When can work be performed on the actual UV reactor?

    <p>Never, due to the interlock switch</p> Signup and view all the answers

    'HOA' switch should be put to which mode when restarting the reactor?

    <p>'Local'</p> Signup and view all the answers

    How long should one wait for the 'Standby Reactor' to complete its warm up before confirming it is 'On Line'?

    <p>6 to 7 minutes</p> Signup and view all the answers

    What action indicates that all reactors are confirmed 'On Line'?

    <p>The status of UV Reactor indicates that it is 'On Line' at the PCS panel switch</p> Signup and view all the answers