Unit Cost Derivation and Cost Engineering Quiz

SupportivePalmTree avatar
SupportivePalmTree
·
·
Download

Start Quiz

Study Flashcards

10 Questions

In order to provide a correct and reasonable rate per unit for a particular item, a detailed surveyed called an 'Analysis of rate' should be conducted on costs of materials, labour and ______ as required for the unit following its specification.

equipment

For unit-price contracts, Contractors are required to quote rates for various items of work on the basis of the corresponding ______ price.

unit

In a Lump-sum contract, the Contractor is required to quote a fixed sum for execution of the work completed in all respects. It is important that the drawings and specifications be comprehensive and show in complete detail all features and requirements of the ______.

work

Contract with lump-sum and unit prices require the Contractor to quote partly a fixed sum for execution of an entire structure completely detailed on the drawings, and partly unit prices which may be required for features of variable quantities such as excavation of drains for ______.

ponds

Negotiated contract is when work is awarded on contract by mutual negotiation between the parties without call of tenders. It may be in any of the forms mentioned ______.

above

Cost engineering is concerned with problems of cost estimation, cost control, and business planning and management science, including problems of project management, planning, scheduling, and profitability analysis of engineering projects and processes. The rates of various items of works, materials to be used in the construction and the wages of different categories of labor (skilled and unskilled) should be available for preparing an ______.

estimate

A lump sum is a single payment of money, as opposed to a series of payments made over time (such as an annuity). BILL OF QUANTITIES is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are ______.

itemized

A quotation is a fixed price offer that can't be changed once accepted by the customer. You must adhere to the quotation price even if you carry out more work than you expected. If you think this is likely to happen, it makes more sense to give an ______.

estimate

They all needed Budget Estimates to be established. They all needed to be Measured and Evaluated. They all needed the most time and cost efficient methods to be procured. They all needed the most time and cost efficient methods to be constructed. They all needed ______.

FINANCE

They all needed FINANCE. They all needed FINANCIAL CONTROL. Cost engineering is concerned with problems of cost estimation, cost control, and business planning and management science, including problems of project management, planning, scheduling, and profitability analysis of engineering projects and processes. ______.

RATES

Test your knowledge on unit cost derivation, budget estimates, cost control, and financial management in cost engineering. Explore methods for efficient time and cost procurement in projects.