Which type of cost estimating enables estimators to apply cost data from one building to a different building type, as long as the design and performance criteria are similar?

  • Unit Cost System (correct)
  • Building Subsystem
  • Component cost system
  • None of the above
  • During which phase of the design process is it helpful to employ cost information on the major elements of each building subsystem?

  • Construction
  • Programming
  • Design Development
  • Schematic Design (correct)
  • Which type of cost estimating enables a more precise selection of components and systems during the design development phase?

  • Unit Cost System
  • Building Subsystem
  • Component cost system (correct)
  • None of the above
  • What type of cost is helpful to compare between different conceptual solutions in the schematic design phase?

    <p>Square foot cost</p> Signup and view all the answers

    Which type of cost estimating allows for cost comparisons between different structural framing systems, such as steel and concrete?