Questions and Answers

Who is required to certify construction after completion of work up to the plinth level?

  • Collector
  • Town Planning Officer only
  • Structural Auditor only
  • Architect / Licensed Engineer / Supervisor (correct)

Which Appendix of UDCPR contains the prescribed format for plinth certification intimation?

  • Appendix G
  • Appendix F (correct)
  • Appendix E
  • Appendix D

To whom is the plinth level intimation submitted?

  • District Survey Office
  • Concerned Branch Office of Town Planning / Authority (correct)
  • High Power Committee
  • State Government

What percentage of plinth-certified cases shall be inspected by the concerned Authority?

<p>10% (C)</p> Signup and view all the answers

After submitting plinth certification, what action can the Project Proponent take?

<p>Continue construction work further (B)</p> Signup and view all the answers

ITP projects may be permissible in which zones of a sanctioned RP/DP?

<p>Any land-use zone (B)</p> Signup and view all the answers

In Development Plan areas, if the ITP is proposed in non-residential, non-commercial, non-U zones, what fee must be paid?

<p>Premium (D)</p> Signup and view all the answers

Which table in UDCPR specifies the premium rates for ITPs in certain zones?

<p>Table 14A (A)</p> Signup and view all the answers

The premium condition for non-permissible zones is applicable to:

<p>Only new ITPs in Development Plan areas (C)</p> Signup and view all the answers

Which of the following is NOT required at the time of plinth level intimation?

<p>Official Gazette Notification (B)</p> Signup and view all the answers

Flashcards

Who certifies plinth level completion?

An Architect, Licensed Engineer, or Supervisor

Plinth certification format location?

Appendix F of UDCPR

Where is plinth level intimation submitted?

Submitted to the Concerned Branch Office of Town Planning / Authority

Inspection percentage of plinth-certified cases?

10%

Signup and view all the flashcards

Action after submitting plinth certification?

Continue construction work further

Signup and view all the flashcards

ITP projects permissible in which zones?

Any land-use zone

Signup and view all the flashcards

Payment for ITP in non-zones?

Premium

Signup and view all the flashcards

Premium rates table for ITPs?

Table 14A

Signup and view all the flashcards

Premium condition applicability?

Only new ITPs in Development Plan areas

Signup and view all the flashcards

Not required at plinth intimation?

Official Gazette Notification

Signup and view all the flashcards

Study Notes

  • This is a set of MPSC ATP-level MCQs based only on the topics of Plinth Certification and Planning Consideration for Integrated Township Projects (ITP) under UDCPR.

Plinth Certification

  • After completing work up to the plinth level, the construction must be certified by an Architect, Licensed Engineer, or Supervisor.
  • Appendix F of UDCPR has the prescribed format for plinth certification intimation.
  • The plinth level intimation has to be submitted to the Concerned Branch Office of Town Planning/Authority.
  • The concerned Authority should inspect 10% of plinth-certified cases.
  • After submitting plinth certification, the Project Proponent can continue construction work further.

Planning Consideration

  • ITP projects are permissible in any land-use zone of a sanctioned RP/DP.
  • In Development Plan areas, if the ITP is proposed in non-residential, non-commercial, non-U zones, premium must be paid.
  • Table 14A in UDCPR specifies the premium rates for ITPs in certain zones.
  • The premium condition for non-permissible zones is applicable only to new ITPs in Development Plan areas.
  • An Official Gazette Notification is not required at the time of plinth level intimation. The following are required:
    • Certification by Architect
    • Submission in Appendix F
    • Submission to Authority or Town Planning Office

Studying That Suits You

Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

Quiz Team

More Like This

UDCPR
40 questions

UDCPR

HeavenlyJasper6355 avatar
HeavenlyJasper6355
UDCPR Regulations 7.2, 7.3, 7.4
20 questions
UDCPR Regulation 7.2: Land Surrender & FSI
20 questions
UDCPR Regulation 7: EWS/LIG Housing
10 questions
Use Quizgecko on...
Browser
Browser