Material Control Chapter 5
16 Questions
0 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

What form is used when loaning tools?

  • DAF Form 1297
  • AF Form 1297 (correct)
  • DAF Form 55
  • AF Form 55
  • When pre-approving a work requirement under the U-Fix-It Program, what two entities are involved?

  • CEO and OE Element (correct)
  • FM and MFH Flight
  • OE Element and MFH Contractor
  • MFH Contractor and CEO
  • Where is the information on proper tool safety practices located if manufacturer's manual is unavailable?

  • DAFMAN 91-203, chapter 2, subparagraphs 2.1-2.5 (correct)
  • NexGen
  • DoDI 5000.64_DAFI 23-111
  • GOCESS Playbook
  • What should an FM do with the DAF Form 55 received after training for loaning tools?

    <p>Provide it to the supervisor and retain a copy (B)</p> Signup and view all the answers

    What document provides instructions for using AF Form 1297?

    <p>DoDI 5000.64_DAFI 23-111 (B)</p> Signup and view all the answers

    What is the role of Materiel Control (MC) when tools are loaned?

    <p>Maintaining a copy of the AF Form 1297 (A)</p> Signup and view all the answers

    What is a key difference between the U-Fix-It Program and loaning tools?

    <p>The U-Fix-It Program involves consuming materiel, while loaning tools involves non-consumables (C)</p> Signup and view all the answers

    How are housing occupants verified when materiel is issued to them?

    <p>Through verification against a list of occupants provided by the MFH Flight or Contractor (B)</p> Signup and view all the answers

    What types of repairs are typically considered appropriate for the U-Fix-It Program?

    <p>Simple tasks like replacing light bulbs, door knobs, and minor plumbing fixes (D)</p> Signup and view all the answers

    Who has the authority to establish the scope of the U-Fix-It Program?

    <p>The CEO (Chief Executive Officer) and OE Element (E)</p> Signup and view all the answers

    What is the purpose of the U-Fix-It Program?

    <p>To empower FMs to handle basic facility repairs quickly and efficiently (D)</p> Signup and view all the answers

    Where can an FM typically find information about the approved materials and tools for the U-Fix-It Program?

    <p>The installation FMs Handbook (D)</p> Signup and view all the answers

    What is the primary function of the CoMC in relation to the U-Fix-It Program?

    <p>To oversee the operation of the GOCESS Store and the U-Fix-It Program (C)</p> Signup and view all the answers

    Who is responsible for processing transactions related to the U-Fix-It Program such as over-the-counter issues, purchase orders, and receipts?

    <p>The U-Fix-It Program or MC personnel (A)</p> Signup and view all the answers

    Which of the following is NOT considered a characteristic of a U-Fix-It Program task?

    <p>Must be pre-approved by the R &amp; O section (B)</p> Signup and view all the answers

    Which is a typical example of a task considered suitable for the U-Fix-It Program?

    <p>Replacing a broken windowpane (E)</p> Signup and view all the answers

    Study Notes

    U-Fix-It Program Overview

    • The U-Fix-It Program facilitates minor facility maintenance and repairs by FMs, MC employees, and CE personnel.
    • Work must not require specialized training, expertise, or tools.
    • Guidance is provided in AFI 32-1001, OE, FM, and the MC Playbooks, with potential additional local, state, and federal directives.
    • The program aims to enable FMs to handle small repairs without specific tools, knowledge, or skill.
    • This function can be part of the main facility store or a separate entity.
    • FMs can request common repair supplies.

    Program Scope and Operation

    • The CEO and OE Element define the program's scope.
    • The program uses a "do-it-yourself" approach for quick tasks.
    • Applicable tasks are those requiring no comprehensive planning or detailed calculations (e.g., toilet seat replacement, ceiling tile change, touch-up painting).
    • The R&O section manages the tools and materials provided.
    • Information regarding materials and issued tools is detailed in the installation FM's handbook.
    • Unpreapproved U-Fix-It work requires an SR to R&O.
    • R&O approval of the SR informs the FM.
    • Inventory storage is either within the main store or a dedicated U-Fix-It area, based on space needs.
    • The CoMC handles all over-the-counter transactions (POs, receipts, final invoices, disposal) through NexGen.
    • FM's information must be loaded into the NexGen database.

    Customer Verification and Preapproval

    • CoMC verifies FM names and identification in the NexGen database.
    • If missing, the Requirements Section of R&O creates an account.
    • Housing occupant verification is necessary when materials are issued to occupants. This is done against lists provided by the MFH.
    • Work must be pre-approved by CEO, OE Element before FM proceeds to the U-Fix-It Store.

    Loaned Tools

    • The temporary issue of tools (non-consumable items) requires AF Form 1297, outlining a return date.
    • NexGen is not used for loaned tools.
    • Material Control (MC) maintains a copy of the hand receipt and provides a copy to the FM.
    • DoDI 5000.64_DAFI 23-111 details AF Form 1297 procedures.

    Tool and Safety Procedures

    • U-Fix-It personnel need to ensure tool safety and remove defective tools immediately.
    • Tool manufacturers' manuals establish safety precautions; otherwise, refer to DAFMAN 91-203, Air Force Occupational Safety, Fire, and Health Standards chapter 2 (subparagraphs 2.1-2.5) for general safety practices.
    • Loaned tools require documented safety training.
    • Proper Personal Protective Equipment (PPE) must be provided.
    • FM's AF Form 55, Employee Safety and Health Record, documents training.
    • MC provides AF Form 55 with annotated training details or a signed CE squadron document (detailing training).
    • Supervisor receives AF Form 55 or the document, while the FM keeps a copy for the FM's safety program file.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    More Like This

    Common Maintenance Manager Challenges Quiz
    10 questions
    Facility Maintenance Quiz
    12 questions

    Facility Maintenance Quiz

    SatisfiedDulcimer avatar
    SatisfiedDulcimer
    Procurement and Maintenance Program Overview
    67 questions
    Use Quizgecko on...
    Browser
    Browser