Maintenance Management Systems
10 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

Which department is responsible for approving changes to existing designs?

  • Engineering department (correct)
  • Operations department
  • Planning department
  • Maintenance department

Who assigns work orders to the appropriate personnel?

  • Tradespeople
  • Operations staff
  • Technicians
  • Maintenance planner (correct)

When is a site inspection performed?

  • During the job
  • Before the job starts
  • At any time during the turnaround period
  • After the job is completed (correct)

Which type of maintenance involves regular scheduled tasks associated with the continuous operation of a facility?

<p>Routine maintenance (A)</p> Signup and view all the answers

What is the purpose of a Maintenance Management System (MMS)?

<p>All of the above (D)</p> Signup and view all the answers

What type of maintenance involves the systematic inspection, detection, and correction of conditions to prevent equipment failure?

<p>Preventative maintenance (A)</p> Signup and view all the answers

Which department is responsible for planning and prioritizing work requests?

<p>Engineering department (D)</p> Signup and view all the answers

What triggers the activities related to a work request?

<p>Submitting a work request (B)</p> Signup and view all the answers

Which type of maintenance tasks usually require work requests?

<p>Non-routine maintenance tasks (D)</p> Signup and view all the answers

What is the highest priority for work requests?

<p>Safety concerns (C)</p> Signup and view all the answers

More Like This

TEMA 8
40 questions

TEMA 8

RightfulScholarship avatar
RightfulScholarship
Railway Operation and Maintenance Procedures
6 questions
Material Control Chapter 5
16 questions
Use Quizgecko on...
Browser
Browser