What should be done when going down a steep gradient with a track machine?
What should be done when going down a steep gradient with a track machine?
What is the responsibility of the SSE/JE/P.Way regarding track machines?
What is the responsibility of the SSE/JE/P.Way regarding track machines?
Under what condition can a machine be driven in the opposite direction?
Under what condition can a machine be driven in the opposite direction?
What must be ensured regarding the engine RPM while on gradient sections?
What must be ensured regarding the engine RPM while on gradient sections?
Signup and view all the answers
What precaution should be taken when negotiating sharp curves?
What precaution should be taken when negotiating sharp curves?
Signup and view all the answers
What must the first machine do when entering a block section for work?
What must the first machine do when entering a block section for work?
Signup and view all the answers
What should follow the first machine when machines are piloted?
What should follow the first machine when machines are piloted?
Signup and view all the answers
Under which condition can track machines work in a group?
Under which condition can track machines work in a group?
Signup and view all the answers
How should track machines move during a run-through movement?
How should track machines move during a run-through movement?
Signup and view all the answers
How should the requisition for a line block be prepared by the SSE/JE (P.Way)?
How should the requisition for a line block be prepared by the SSE/JE (P.Way)?
Signup and view all the answers
What extra precaution is necessary for the first machine in a double line section?
What extra precaution is necessary for the first machine in a double line section?
Signup and view all the answers
What is the general rule regarding the movement of track machines in groups?
What is the general rule regarding the movement of track machines in groups?
Signup and view all the answers
What should the SSE/JE (P.Way) indicate in the requisition for a block?
What should the SSE/JE (P.Way) indicate in the requisition for a block?
Signup and view all the answers
What action is taken when machines are allowed to operate on paper authority?
What action is taken when machines are allowed to operate on paper authority?
Signup and view all the answers
What are the two categories of track machines mentioned?
What are the two categories of track machines mentioned?
Signup and view all the answers
Which of the following track machines is categorized under those hauled by locomotives?
Which of the following track machines is categorized under those hauled by locomotives?
Signup and view all the answers
What additional equipment may be attached to a self-propelled track machine?
What additional equipment may be attached to a self-propelled track machine?
Signup and view all the answers
Which safety provision is applicable for the working of track machines?
Which safety provision is applicable for the working of track machines?
Signup and view all the answers
What is required for the manning of track machines?
What is required for the manning of track machines?
Signup and view all the answers
What is a requirement for self-propelled track machines during movement?
What is a requirement for self-propelled track machines during movement?
Signup and view all the answers
How should track machine staff be familiar with G&SR provisions?
How should track machine staff be familiar with G&SR provisions?
Signup and view all the answers
What is the objective concerning SRs of Zonal Railways?
What is the objective concerning SRs of Zonal Railways?
Signup and view all the answers
What should be maintained to ensure safety where visibility is poor?
What should be maintained to ensure safety where visibility is poor?
Signup and view all the answers
What action must the SSE/JE/TM take while approaching level crossings?
What action must the SSE/JE/TM take while approaching level crossings?
Signup and view all the answers
How should points of non-signalled sidings be secured?
How should points of non-signalled sidings be secured?
Signup and view all the answers
Who is responsible for ensuring machines are not shunted without supervision?
Who is responsible for ensuring machines are not shunted without supervision?
Signup and view all the answers
What condition does the operation of certain track machines create that can jeopardize safety?
What condition does the operation of certain track machines create that can jeopardize safety?
Signup and view all the answers
What should be deployed to warn staff of approaching trains?
What should be deployed to warn staff of approaching trains?
Signup and view all the answers
What precaution can be taken by a lookout man to ensure safety?
What precaution can be taken by a lookout man to ensure safety?
Signup and view all the answers
What additional precaution should be employed until the train has passed the worksite?
What additional precaution should be employed until the train has passed the worksite?
Signup and view all the answers
Who retains the keys to the padlocks securing the points of stabling siding?
Who retains the keys to the padlocks securing the points of stabling siding?
Signup and view all the answers
What is essential for the safety of laborers working with track machines?
What is essential for the safety of laborers working with track machines?
Signup and view all the answers
Who is responsible for the issuance of a provisional speed certificate for oscillation trials?
Who is responsible for the issuance of a provisional speed certificate for oscillation trials?
Signup and view all the answers
What must be obtained before conducting trials on passenger running lines?
What must be obtained before conducting trials on passenger running lines?
Signup and view all the answers
In the event of a difference of opinion regarding oscillation trials, where should the matter be referred?
In the event of a difference of opinion regarding oscillation trials, where should the matter be referred?
Signup and view all the answers
Who supervises the oscillation trial conducted under its guidelines?
Who supervises the oscillation trial conducted under its guidelines?
Signup and view all the answers
Who must sign the Joint Safety Certificate for oscillation trials?
Who must sign the Joint Safety Certificate for oscillation trials?
Signup and view all the answers
What action must RDSO take for the introduction of a machine different from existing ones?
What action must RDSO take for the introduction of a machine different from existing ones?
Signup and view all the answers
What happens if there is an increase in the sanctioned maximum speed of a machine?
What happens if there is an increase in the sanctioned maximum speed of a machine?
Signup and view all the answers
What is the final document issued by RDSO after conducting detailed oscillation trials?
What is the final document issued by RDSO after conducting detailed oscillation trials?
Signup and view all the answers
Which of the following is NOT a requirement for conducting oscillation trials?
Which of the following is NOT a requirement for conducting oscillation trials?
Signup and view all the answers
How is the authority for conducting oscillation trials distributed?
How is the authority for conducting oscillation trials distributed?
Signup and view all the answers
What action must be taken by the track machine crew if they encounter an IBS/IBH signal in the 'ON' position during their journey?
What action must be taken by the track machine crew if they encounter an IBS/IBH signal in the 'ON' position during their journey?
Signup and view all the answers
Under what condition can the track machine proceed past an IBS/IBH signal showing 'ON' during block working?
Under what condition can the track machine proceed past an IBS/IBH signal showing 'ON' during block working?
Signup and view all the answers
What should a track machine crew do if the phone under the IBS/IBH is defective and visibility is clear?
What should a track machine crew do if the phone under the IBS/IBH is defective and visibility is clear?
Signup and view all the answers
What is the maximum speed a track machine should proceed if it encounters an IBS/IBH signal at 'ON' with poor visibility?
What is the maximum speed a track machine should proceed if it encounters an IBS/IBH signal at 'ON' with poor visibility?
Signup and view all the answers
What must the SSE/JE/TM do after reaching a station in advance following a signal at 'ON'?
What must the SSE/JE/TM do after reaching a station in advance following a signal at 'ON'?
Signup and view all the answers
What must the SSE/JE (P Way) ensure regarding track fitness after machine work is completed?
What must the SSE/JE (P Way) ensure regarding track fitness after machine work is completed?
Signup and view all the answers
Which medical category must track machine staff be fit in?
Which medical category must track machine staff be fit in?
Signup and view all the answers
In what situation can the Sr.DEN/DEN/AEN hire a road vehicle?
In what situation can the Sr.DEN/DEN/AEN hire a road vehicle?
Signup and view all the answers
What record-keeping requirement is mandated for SSE/JE/TM in terms of competencies?
What record-keeping requirement is mandated for SSE/JE/TM in terms of competencies?
Signup and view all the answers
What protocol is required if an employee’s medical certificate is about to expire?
What protocol is required if an employee’s medical certificate is about to expire?
Signup and view all the answers
What should be checked before allowing track machines to operate in a block section?
What should be checked before allowing track machines to operate in a block section?
Signup and view all the answers
What should be recorded in the medical fitness certificate during the hiring process for new track machine staff?
What should be recorded in the medical fitness certificate during the hiring process for new track machine staff?
Signup and view all the answers
What action should be taken if a track machine does not fit into the existing stabling section after operations?
What action should be taken if a track machine does not fit into the existing stabling section after operations?
Signup and view all the answers
What must the SSE/JE (P.Way) do after completing work with a track machine?
What must the SSE/JE (P.Way) do after completing work with a track machine?
Signup and view all the answers
In integrated traffic blocks, what must be followed during the operation of track machines?
In integrated traffic blocks, what must be followed during the operation of track machines?
Signup and view all the answers
Under which condition can a mobile phone be used by supervisory staff during track machine operations?
Under which condition can a mobile phone be used by supervisory staff during track machine operations?
Signup and view all the answers
What is a prerequisite for an SSE/JE/TM who is not familiar with the working section of a track machine?
What is a prerequisite for an SSE/JE/TM who is not familiar with the working section of a track machine?
Signup and view all the answers
What is the primary responsibility of the Station Master regarding the line block process?
What is the primary responsibility of the Station Master regarding the line block process?
Signup and view all the answers
What additional instruction must be provided on the requisition for a line block?
What additional instruction must be provided on the requisition for a line block?
Signup and view all the answers
During what circumstances is it necessary for the SSE/JE (P.Way) to work as a pilot?
During what circumstances is it necessary for the SSE/JE (P.Way) to work as a pilot?
Signup and view all the answers
What should happen after all machines have cleared the block section?
What should happen after all machines have cleared the block section?
Signup and view all the answers
What is the role of the SSE/JE (P.Way) in relation to the requisition returned by the Station Master?
What is the role of the SSE/JE (P.Way) in relation to the requisition returned by the Station Master?
Signup and view all the answers
What is the primary purpose of the certificate signed by the engineering team?
What is the primary purpose of the certificate signed by the engineering team?
Signup and view all the answers
Which party is responsible for communicating the sanction of the railway machine usage?
Which party is responsible for communicating the sanction of the railway machine usage?
Signup and view all the answers
What must be included in the speed restrictions of the certificate?
What must be included in the speed restrictions of the certificate?
Signup and view all the answers
What is a requirement for the speed certified on the certificate?
What is a requirement for the speed certified on the certificate?
Signup and view all the answers
Who must sign the certificate which certifies the safety of running a locomotive?
Who must sign the certificate which certifies the safety of running a locomotive?
Signup and view all the answers
Which of the following is NOT specified as a required condition in the certification process?
Which of the following is NOT specified as a required condition in the certification process?
Signup and view all the answers
What aspect of the operational conditions must be communicated to the Commissioner?
What aspect of the operational conditions must be communicated to the Commissioner?
Signup and view all the answers
What specific details about the section of railway must be included in the certificate?
What specific details about the section of railway must be included in the certificate?
Signup and view all the answers
What is a consequence if the maximum speed of a machine is increased?
What is a consequence if the maximum speed of a machine is increased?
Signup and view all the answers
Who is responsible for certifying the maximum permissible speed for the movement of a machine?
Who is responsible for certifying the maximum permissible speed for the movement of a machine?
Signup and view all the answers
What must be ensured by the Principal Chief Engineers when approving the maximum speed prescribed by RDSO?
What must be ensured by the Principal Chief Engineers when approving the maximum speed prescribed by RDSO?
Signup and view all the answers
Which of the following statements is true regarding the approval needed for moving a new machine attached to a passenger train?
Which of the following statements is true regarding the approval needed for moving a new machine attached to a passenger train?
Signup and view all the answers
What action is required if a new machine exceeds the allowed axle loads on a section?
What action is required if a new machine exceeds the allowed axle loads on a section?
Signup and view all the answers
What is NOT a requirement when determining the maximum permissible speed for a machine's movement?
What is NOT a requirement when determining the maximum permissible speed for a machine's movement?
Signup and view all the answers
Which body must ensure that the maximum speed is not higher than the provisional speed determined by RDSO?
Which body must ensure that the maximum speed is not higher than the provisional speed determined by RDSO?
Signup and view all the answers
What happens if a new machine violates the Indian Railway Schedule of Dimensions?
What happens if a new machine violates the Indian Railway Schedule of Dimensions?
Signup and view all the answers
Who must be consulted to determine the maximum permissible speed before a machine movement?
Who must be consulted to determine the maximum permissible speed before a machine movement?
Signup and view all the answers
What is required before moving a new machine to ensure its speed is permissible based on existing infrastructures?
What is required before moving a new machine to ensure its speed is permissible based on existing infrastructures?
Signup and view all the answers
In the case of a new machine, which element is NOT critical in the approval process before movement?
In the case of a new machine, which element is NOT critical in the approval process before movement?
Signup and view all the answers
Study Notes
Track Machine Movement
- Track machines are categorized into two groups:
- Locomotive-hauled - Includes machines like TLE, TRT, PCCM, and MDU. They follow the same rules as material trains.
- Self-propelled - These machines move as trains, but do not require a guard or brake van. They can haul one camping coach, BRN wagon, or another self-propelled machine.
-
Self-propelled track machine movement:
- Operated like a train but does not need a guard or brake van.
- Can pull one unbraked camping coach, BRN wagon, or another self-propelled machine.
-
Track machine working:
-
General Rules & Special Rules (SR) apply to track machines.
- Zonal Railway specific SRs should be standardized to provide uniformity for all zones.
- Knowledge of G&SR & Training: Track machine staff need to be knowledgeable of G&SR, which should be taught during initial and refresher training courses.
-
General Rules & Special Rules (SR) apply to track machines.
-
Manning and Safety Equipment
- Competent staff required to operate all track machines.
- Groups of machines - First machine in the group passes signals or receives authority. Remaining machines are piloted by a competent staff member, following with a signal in the ON position.
- Working in Groups - Not allowed in areas with restricted visibility (sharp curves and steep gradients). Special safety precautions needed for deep screening and track relaying.
More Movement & Working Rules
-
Group Movement:
- Run through movement is not allowed, but multiple machines can transit as coupled vehicles.
- Short duration block required for group movement, following standard rules.
-
Single Block Working:
- Track machines work under line block.
- SSE/JE (P.Way) requests block in duplicate from Station Master.
- Block details: Location of work, direction (UP/DN), number of machines, sequence, block duration, return to station, or proceeding to next station.
Safety Precautions
-
Track Machine Handling:
- Points set against line: Points of non-signalled sidings are set against the line where the track machine is stabled and secured with locks. Keys are kept by the Station Master.
- Shunting: SSE/JE/TM must be present for shunting operations on a line occupied by a track machine to ensure safety.
-
Safety of Personnel:
- Hooters: Hooters are located on machines to warn staff about approaching trains. Remote-controlled hooters should also be deployed for better visibility.
- Lights: Flashers are used to provide an extra layer of warning.
- Working conditions: Dust, noise, and heavy labor require careful attention to safety.
-
Steep Gradients:
- Downward: A locomotive is coupled in front of the track machine for control.
- Upward: Locomotive is coupled behind the track machine for control.
- Working: For work, track machine is uncoupled, and the locomotive moves 25 meters away. After completion, the machine is re-coupled with the locomotive.
-
Driving Precautions:
- Cabin direction: Drive from the cabin corresponding to the direction of travel, except during minor shunting operations.
- Speed: Do not exceed prescribed speed limits, further reduced over switches and speed restriction zones.
- Slopes: Do not drive up or down slopes without engaging gear and do not turn off the gearbox key switch.
- Engine: Do not let engine RPM fall below 1000.
-
Other Maintenance:
- ZF gearbox: Oil level and temperature should be regularly checked.
- Pneumatic Circuit: Ensure correct operation of the brake system.
- Spares: Ensure availability of spare parts, particularly for failure-prone components.
- Horn & Lights: Check for proper working condition.
- Trespassers: Be vigilant for trespassers, especially on sharp curves, and sound horns.
- Ghat sections: Only one track machine can move through ghat sections at a time. Convoy movement is not allowed.
Introduction of New Machines
- RDSO application: RDSO applies to the Railway Board for the introduction of new machines on specific sections or divisions.
- Sanction: Railway Board approves the introduction of new machines, including any increases in maximum speed.
-
Oscillation Trials:
- A separate provisional speed certificate for oscillation trials is issued by RDSO, specifying the trial section.
- Trials require approval from the General Manager and CRS.
- Trials are conducted under RDSO supervision.
- A final maximum permissible speed certificate is issued by RDSO based on the trial results.
Track Machine Operations
- Lookout Men: Lookout men must be provided at the work site, ensuring adequate protection based on IRPWM and GR 6.03.(j)
- Worksite Inspection: The SE/JE (P Way) inspects the worksite thoroughly after completion, verifying track fitness for train operation.
- Movement after Work: The SM liaises with the Section Controller/Controller to ensure the machine is returned to the base station at the earliest for maintenance.
- Staff Transportation: If a hired road vehicle is needed to transport staff back to the machine stabling station, the Sr. DEN/DEN/AEN has authority to authorize this.
- Competency Certification: SSE/JE/TM must be competent in machine operation with knowledge acquired through initial and refresher courses, and their competency is certified by the appropriate authority.
- Medical Fitness: SSE/JE/TM must be medically fit (A-3 category) and carry an extra pair of spectacles. Technicians and helpers on track machines must also be fit in category A-3.
Block Working
- Block Request: The SSE/JE (P.Way) prepares a written request for the block, includes details of the work and specific instructions, and the Station Master reviews the request.
- Block Granting: The Station Master grants the block after contacting the control and ensuring no conflicting train movements.
- Track Machine Accompaniment: The SSE/JE (P.Way) accompanies the track machine to the work site.
- Track Machine Permit: The SSE/JE (P.Way) receives the track machine permit, signed by the SSE/JE/TM.
- Block Clearance: After completing work and the machine clears the block section, the SSE/JE (P.Way) obtains the token, track machine permit, and key. The SSE/JE (P.Way) then certifies that the track is fit for train movement.
Special Considerations
- Automatic Block Sections: Track machine operation in automatic block sections requires specific instructions outlined in Annexure 7.6.
- Integrated Traffic Blocks: Track machine operation in integrated traffic blocks follows Zonal Railway instructions for block coordination.
- Cell Phone Use: Supervisory staff on the track machine and at its site are prohibited from using cell phones during movement and working.
- Pilots: If the SSE/JE/TM is unfamiliar with the section, a pilot (Loco Pilot/ALP) is provided. The SSE/JE (P.Way) may act as a pilot in emergencies.
Speed Certification
- Certificate Issuance: A certificate is issued by the Chief Engineer, Chief Mechanical Engineer, and Chief Electrical Engineer, outlining maximum safe speed limits and restrictions.
- RDSO Certification: The speed limit in this certificate does not exceed limits outlined by Research Designs and Standards Organization.
- Commissioner Information: The zonal railway general manager informs the Commissioner of Railway Safety ten days prior to using the machine.
One-Time Movement of New Machines
- Speed Determination: The maximum speed for moving a new machine from its source to destination is determined by Executive Director Standards (Motive Power) in consultation with other relevant departments.
- JSC Approval: The maximum speed is subject to approval by the Principal Chief Engineer, Principal Chief Mechanical Engineer, and Principal Chief Electrical Engineer (if locomotive/electrified section).
- Commissioner Information: The Commissioner of Railway Safety is informed about the movement. Formal approval is not required unless passenger trains are involved.
Intermediate Block Hut/Section
- Passing with IBS/IBH “ON”: If the IBS/IBH is "ON", the track machine stops. After 5 minutes, the SSE/JE/TM contacts the SM in the rear station, reporting the issue. If the SM approves, the track machine can proceed with a reduced speed (15 kmph if visibility is clear, 8 kmph if not).
- Block Working: When the track machine is operating on a block, the IBH/IBS is treated as canceled, and the track machine can pass the IBS/IBH "ON".
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
Explore the different categories of track machines, including locomotive-hauled and self-propelled types. This quiz will cover operational rules, safety protocols, and essential knowledge needed for staff training in track machine movement. Understand the importance of standardized guidelines across zonal railways.