What should be done when going down a steep gradient with a track machine?

  • The loco should be attached in the rear direction.
  • The track machine should be uncoupled from the loco before proceeding.
  • A banking locomotive must be coupled behind the track machine.
  • The loco should be attached in front to control all movements. (correct)
  • What is the responsibility of the SSE/JE/P.Way regarding track machines?

  • To monitor the speed limits while driving the track machine.
  • To drive the track machine during maintenance checks.
  • To arrange for a banking locomotive before the track machine's readiness. (correct)
  • To ensure the track machine is always coupled with the train.
  • Under what condition can a machine be driven in the opposite direction?

  • When there is an emergency situation only.
  • During regular operations without any precautions.
  • Only during small shunting movements with adequate precautions. (correct)
  • If the operator is experienced enough to handle the situation.
  • What must be ensured regarding the engine RPM while on gradient sections?

    <p>RPM must remain above 1000 and the engine should not be turned off before stopping.</p> Signup and view all the answers

    What precaution should be taken when negotiating sharp curves?

    <p>Sound horns and watch for trespassers.</p> Signup and view all the answers

    What must the first machine do when entering a block section for work?

    <p>Pass the dispatch signal with the signal in OFF position.</p> Signup and view all the answers

    What should follow the first machine when machines are piloted?

    <p>All other machines shall be piloted by a competent railway servant.</p> Signup and view all the answers

    Under which condition can track machines work in a group?

    <p>When deep screening or track relaying is taking place.</p> Signup and view all the answers

    How should track machines move during a run-through movement?

    <p>They can transit as coupled vehicles under one authority.</p> Signup and view all the answers

    How should the requisition for a line block be prepared by the SSE/JE (P.Way)?

    <p>In duplicate to the station master, following a specific proforma.</p> Signup and view all the answers

    What extra precaution is necessary for the first machine in a double line section?

    <p>It must have proper block protection facing the traffic direction.</p> Signup and view all the answers

    What is the general rule regarding the movement of track machines in groups?

    <p>Track machines can only move in groups if they have been authorized.</p> Signup and view all the answers

    What should the SSE/JE (P.Way) indicate in the requisition for a block?

    <p>The specific location, road, number of machines, and duration of the block.</p> Signup and view all the answers

    What action is taken when machines are allowed to operate on paper authority?

    <p>The SSE/JE in the first machine receives the authority.</p> Signup and view all the answers

    What are the two categories of track machines mentioned?

    <p>Track Machines Hauled by Locomotive and Self-propelled Track Machines</p> Signup and view all the answers

    Which of the following track machines is categorized under those hauled by locomotives?

    <p>MDU</p> Signup and view all the answers

    What additional equipment may be attached to a self-propelled track machine?

    <p>A camping coach, a BRN wagon, or another self-propelled track machine</p> Signup and view all the answers

    Which safety provision is applicable for the working of track machines?

    <p>Provisions in GR 4.65 supplemented by SRs from the Zonal Railways</p> Signup and view all the answers

    What is required for the manning of track machines?

    <p>A competent railway servant authorized to work the machine</p> Signup and view all the answers

    What is a requirement for self-propelled track machines during movement?

    <p>They do not need a guard or a brake van.</p> Signup and view all the answers

    How should track machine staff be familiar with G&SR provisions?

    <p>During initial and refresher training courses conducted in ZRTIs.</p> Signup and view all the answers

    What is the objective concerning SRs of Zonal Railways?

    <p>To unify common aspects of track machine working across all Zonal Railways.</p> Signup and view all the answers

    What should be maintained to ensure safety where visibility is poor?

    <p>Appropriate speeds and safe distance</p> Signup and view all the answers

    What action must the SSE/JE/TM take while approaching level crossings?

    <p>Keep a vigil for obstructions and whistle freely</p> Signup and view all the answers

    How should points of non-signalled sidings be secured?

    <p>With clamps or cotter bolts and padlocks</p> Signup and view all the answers

    Who is responsible for ensuring machines are not shunted without supervision?

    <p>The station master</p> Signup and view all the answers

    What condition does the operation of certain track machines create that can jeopardize safety?

    <p>A dusty atmosphere that impairs visibility</p> Signup and view all the answers

    What should be deployed to warn staff of approaching trains?

    <p>Hooters on track machines</p> Signup and view all the answers

    What precaution can be taken by a lookout man to ensure safety?

    <p>Operate remote controlled hooters</p> Signup and view all the answers

    What additional precaution should be employed until the train has passed the worksite?

    <p>Put on the flasher light</p> Signup and view all the answers

    Who retains the keys to the padlocks securing the points of stabling siding?

    <p>The Station Master</p> Signup and view all the answers

    What is essential for the safety of laborers working with track machines?

    <p>Enforcing adequate precautions at the work site</p> Signup and view all the answers

    Who is responsible for the issuance of a provisional speed certificate for oscillation trials?

    <p>RDSO</p> Signup and view all the answers

    What must be obtained before conducting trials on passenger running lines?

    <p>Joint Safety Certificate</p> Signup and view all the answers

    In the event of a difference of opinion regarding oscillation trials, where should the matter be referred?

    <p>To the Railway Board for final order</p> Signup and view all the answers

    Who supervises the oscillation trial conducted under its guidelines?

    <p>RDSO</p> Signup and view all the answers

    Who must sign the Joint Safety Certificate for oscillation trials?

    <p>All Principal Chiefs involved in the system</p> Signup and view all the answers

    What action must RDSO take for the introduction of a machine different from existing ones?

    <p>Apply to the Railway Board</p> Signup and view all the answers

    What happens if there is an increase in the sanctioned maximum speed of a machine?

    <p>It is treated as the introduction of new types of locomotives</p> Signup and view all the answers

    What is the final document issued by RDSO after conducting detailed oscillation trials?

    <p>Final maximum permissible speed certificate</p> Signup and view all the answers

    Which of the following is NOT a requirement for conducting oscillation trials?

    <p>Approval from the Railway Board</p> Signup and view all the answers

    How is the authority for conducting oscillation trials distributed?

    <p>By the General Manager in consultation with RDSO</p> Signup and view all the answers

    What action must be taken by the track machine crew if they encounter an IBS/IBH signal in the 'ON' position during their journey?

    <p>Stop the machine and contact the SM after 05 minutes.</p> Signup and view all the answers

    Under what condition can the track machine proceed past an IBS/IBH signal showing 'ON' during block working?

    <p>If the IBH/IBS is confirmed as cancelled by the SM.</p> Signup and view all the answers

    What should a track machine crew do if the phone under the IBS/IBH is defective and visibility is clear?

    <p>Proceed at a speed of 15 kmph.</p> Signup and view all the answers

    What is the maximum speed a track machine should proceed if it encounters an IBS/IBH signal at 'ON' with poor visibility?

    <p>8 kmph</p> Signup and view all the answers

    What must the SSE/JE/TM do after reaching a station in advance following a signal at 'ON'?

    <p>Report in writing to the station master on duty.</p> Signup and view all the answers

    What must the SSE/JE (P Way) ensure regarding track fitness after machine work is completed?

    <p>That no ingrowths or obstructions affect train running.</p> Signup and view all the answers

    Which medical category must track machine staff be fit in?

    <p>A-3 medical category</p> Signup and view all the answers

    In what situation can the Sr.DEN/DEN/AEN hire a road vehicle?

    <p>When staff need transportation back to the machine stabling station.</p> Signup and view all the answers

    What record-keeping requirement is mandated for SSE/JE/TM in terms of competencies?

    <p>Maintain a personal diary detailing their assignable competencies.</p> Signup and view all the answers

    What protocol is required if an employee’s medical certificate is about to expire?

    <p>Inform the superior 60 days in advance.</p> Signup and view all the answers

    What should be checked before allowing track machines to operate in a block section?

    <p>No train movements are scheduled in that section.</p> Signup and view all the answers

    What should be recorded in the medical fitness certificate during the hiring process for new track machine staff?

    <p>Current medical category and any special needs.</p> Signup and view all the answers

    What action should be taken if a track machine does not fit into the existing stabling section after operations?

    <p>Create an alternate stabling arrangement at the nearest station.</p> Signup and view all the answers

    What must the SSE/JE (P.Way) do after completing work with a track machine?

    <p>Certify that the track is fit for train movement.</p> Signup and view all the answers

    In integrated traffic blocks, what must be followed during the operation of track machines?

    <p>Specific instructions from the Zonal Railway for integrated block working.</p> Signup and view all the answers

    Under which condition can a mobile phone be used by supervisory staff during track machine operations?

    <p>In emergencies or when absolutely necessary.</p> Signup and view all the answers

    What is a prerequisite for an SSE/JE/TM who is not familiar with the working section of a track machine?

    <p>Provision of a Pilot for movement and block working.</p> Signup and view all the answers

    What is the primary responsibility of the Station Master regarding the line block process?

    <p>Clear the line for normal train operation after relevant checks.</p> Signup and view all the answers

    What additional instruction must be provided on the requisition for a line block?

    <p>The duration and any special conditions such as caution orders.</p> Signup and view all the answers

    During what circumstances is it necessary for the SSE/JE (P.Way) to work as a pilot?

    <p>In emergent situations within their jurisdiction.</p> Signup and view all the answers

    What should happen after all machines have cleared the block section?

    <p>The token and track machine permit should be returned.</p> Signup and view all the answers

    What is the role of the SSE/JE (P.Way) in relation to the requisition returned by the Station Master?

    <p>To ensure it is signed by track machine in-charges.</p> Signup and view all the answers

    What is the primary purpose of the certificate signed by the engineering team?

    <p>To certify the safety and operational limits for the rolling stock</p> Signup and view all the answers

    Which party is responsible for communicating the sanction of the railway machine usage?

    <p>The General Manager of the zonal railway</p> Signup and view all the answers

    What must be included in the speed restrictions of the certificate?

    <p>Nature of speed restrictions and reasons</p> Signup and view all the answers

    What is a requirement for the speed certified on the certificate?

    <p>It must not exceed limits set by external agencies</p> Signup and view all the answers

    Who must sign the certificate which certifies the safety of running a locomotive?

    <p>A combination of Chief Engineers and Operations Managers</p> Signup and view all the answers

    Which of the following is NOT specified as a required condition in the certification process?

    <p>Benchmarking speed against historical performance data</p> Signup and view all the answers

    What aspect of the operational conditions must be communicated to the Commissioner?

    <p>The sanction for the use of the machine</p> Signup and view all the answers

    What specific details about the section of railway must be included in the certificate?

    <p>The km range the machine is allowed to operate within</p> Signup and view all the answers

    What is a consequence if the maximum speed of a machine is increased?

    <p>New certification trials are mandatory</p> Signup and view all the answers

    Who is responsible for certifying the maximum permissible speed for the movement of a machine?

    <p>Executive Director Standards (Motive Power)</p> Signup and view all the answers

    What must be ensured by the Principal Chief Engineers when approving the maximum speed prescribed by RDSO?

    <p>That the machine does not infringe the Indian Railway Schedule of Dimensions</p> Signup and view all the answers

    Which of the following statements is true regarding the approval needed for moving a new machine attached to a passenger train?

    <p>Sanction of the Commissioner of Railway Safety is required.</p> Signup and view all the answers

    What action is required if a new machine exceeds the allowed axle loads on a section?

    <p>Signing of a Joint Safety Certificate</p> Signup and view all the answers

    What is NOT a requirement when determining the maximum permissible speed for a machine's movement?

    <p>Assessment by the Commissioner of Railway Safety</p> Signup and view all the answers

    Which body must ensure that the maximum speed is not higher than the provisional speed determined by RDSO?

    <p>Principal Chief Engineer and Chief Mechanical Engineer</p> Signup and view all the answers

    What happens if a new machine violates the Indian Railway Schedule of Dimensions?

    <p>It must secure a Joint Safety Certificate before movement.</p> Signup and view all the answers

    Who must be consulted to determine the maximum permissible speed before a machine movement?

    <p>Executive Directors of Standards and other concerned Directorates</p> Signup and view all the answers

    What is required before moving a new machine to ensure its speed is permissible based on existing infrastructures?

    <p>Approval by the Principal Chief Mechanical and Chief Signal Engineers</p> Signup and view all the answers

    In the case of a new machine, which element is NOT critical in the approval process before movement?

    <p>Delay in movement for additional testing</p> Signup and view all the answers

    Study Notes

    Track Machine Movement

    • Track machines are categorized into two groups:
      • Locomotive-hauled - Includes machines like TLE, TRT, PCCM, and MDU. They follow the same rules as material trains.
      • Self-propelled - These machines move as trains, but do not require a guard or brake van. They can haul one camping coach, BRN wagon, or another self-propelled machine.
    • Self-propelled track machine movement:
      • Operated like a train but does not need a guard or brake van.
      • Can pull one unbraked camping coach, BRN wagon, or another self-propelled machine.
    • Track machine working:
      • General Rules & Special Rules (SR) apply to track machines.
        • Zonal Railway specific SRs should be standardized to provide uniformity for all zones.
      • Knowledge of G&SR & Training: Track machine staff need to be knowledgeable of G&SR, which should be taught during initial and refresher training courses.
    • Manning and Safety Equipment
      • Competent staff required to operate all track machines.
      • Groups of machines - First machine in the group passes signals or receives authority. Remaining machines are piloted by a competent staff member, following with a signal in the ON position.
      • Working in Groups - Not allowed in areas with restricted visibility (sharp curves and steep gradients). Special safety precautions needed for deep screening and track relaying.

    More Movement & Working Rules

    • Group Movement:
      • Run through movement is not allowed, but multiple machines can transit as coupled vehicles.
      • Short duration block required for group movement, following standard rules.
    • Single Block Working:
      • Track machines work under line block.
      • SSE/JE (P.Way) requests block in duplicate from Station Master.
      • Block details: Location of work, direction (UP/DN), number of machines, sequence, block duration, return to station, or proceeding to next station.

    Safety Precautions

    • Track Machine Handling:
      • Points set against line: Points of non-signalled sidings are set against the line where the track machine is stabled and secured with locks. Keys are kept by the Station Master.
      • Shunting: SSE/JE/TM must be present for shunting operations on a line occupied by a track machine to ensure safety.
    • Safety of Personnel:
      • Hooters: Hooters are located on machines to warn staff about approaching trains. Remote-controlled hooters should also be deployed for better visibility.
      • Lights: Flashers are used to provide an extra layer of warning.
      • Working conditions: Dust, noise, and heavy labor require careful attention to safety.
    • Steep Gradients:
      • Downward: A locomotive is coupled in front of the track machine for control.
      • Upward: Locomotive is coupled behind the track machine for control.
      • Working: For work, track machine is uncoupled, and the locomotive moves 25 meters away. After completion, the machine is re-coupled with the locomotive.
    • Driving Precautions:
      • Cabin direction: Drive from the cabin corresponding to the direction of travel, except during minor shunting operations.
      • Speed: Do not exceed prescribed speed limits, further reduced over switches and speed restriction zones.
      • Slopes: Do not drive up or down slopes without engaging gear and do not turn off the gearbox key switch.
      • Engine: Do not let engine RPM fall below 1000.
    • Other Maintenance:
      • ZF gearbox: Oil level and temperature should be regularly checked.
      • Pneumatic Circuit: Ensure correct operation of the brake system.
      • Spares: Ensure availability of spare parts, particularly for failure-prone components.
      • Horn & Lights: Check for proper working condition.
      • Trespassers: Be vigilant for trespassers, especially on sharp curves, and sound horns.
      • Ghat sections: Only one track machine can move through ghat sections at a time. Convoy movement is not allowed.

    Introduction of New Machines

    • RDSO application: RDSO applies to the Railway Board for the introduction of new machines on specific sections or divisions.
    • Sanction: Railway Board approves the introduction of new machines, including any increases in maximum speed.
    • Oscillation Trials:
      • A separate provisional speed certificate for oscillation trials is issued by RDSO, specifying the trial section.
      • Trials require approval from the General Manager and CRS.
      • Trials are conducted under RDSO supervision.
      • A final maximum permissible speed certificate is issued by RDSO based on the trial results.

    Track Machine Operations

    • Lookout Men: Lookout men must be provided at the work site, ensuring adequate protection based on IRPWM and GR 6.03.(j)
    • Worksite Inspection: The SE/JE (P Way) inspects the worksite thoroughly after completion, verifying track fitness for train operation.
    • Movement after Work: The SM liaises with the Section Controller/Controller to ensure the machine is returned to the base station at the earliest for maintenance.
    • Staff Transportation: If a hired road vehicle is needed to transport staff back to the machine stabling station, the Sr. DEN/DEN/AEN has authority to authorize this.
    • Competency Certification: SSE/JE/TM must be competent in machine operation with knowledge acquired through initial and refresher courses, and their competency is certified by the appropriate authority.
    • Medical Fitness: SSE/JE/TM must be medically fit (A-3 category) and carry an extra pair of spectacles. Technicians and helpers on track machines must also be fit in category A-3.

    Block Working

    • Block Request: The SSE/JE (P.Way) prepares a written request for the block, includes details of the work and specific instructions, and the Station Master reviews the request.
    • Block Granting: The Station Master grants the block after contacting the control and ensuring no conflicting train movements.
    • Track Machine Accompaniment: The SSE/JE (P.Way) accompanies the track machine to the work site.
    • Track Machine Permit: The SSE/JE (P.Way) receives the track machine permit, signed by the SSE/JE/TM.
    • Block Clearance: After completing work and the machine clears the block section, the SSE/JE (P.Way) obtains the token, track machine permit, and key. The SSE/JE (P.Way) then certifies that the track is fit for train movement.

    Special Considerations

    • Automatic Block Sections: Track machine operation in automatic block sections requires specific instructions outlined in Annexure 7.6.
    • Integrated Traffic Blocks: Track machine operation in integrated traffic blocks follows Zonal Railway instructions for block coordination.
    • Cell Phone Use: Supervisory staff on the track machine and at its site are prohibited from using cell phones during movement and working.
    • Pilots: If the SSE/JE/TM is unfamiliar with the section, a pilot (Loco Pilot/ALP) is provided. The SSE/JE (P.Way) may act as a pilot in emergencies.

    Speed Certification

    • Certificate Issuance: A certificate is issued by the Chief Engineer, Chief Mechanical Engineer, and Chief Electrical Engineer, outlining maximum safe speed limits and restrictions.
    • RDSO Certification: The speed limit in this certificate does not exceed limits outlined by Research Designs and Standards Organization.
    • Commissioner Information: The zonal railway general manager informs the Commissioner of Railway Safety ten days prior to using the machine.

    One-Time Movement of New Machines

    • Speed Determination: The maximum speed for moving a new machine from its source to destination is determined by Executive Director Standards (Motive Power) in consultation with other relevant departments.
    • JSC Approval: The maximum speed is subject to approval by the Principal Chief Engineer, Principal Chief Mechanical Engineer, and Principal Chief Electrical Engineer (if locomotive/electrified section).
    • Commissioner Information: The Commissioner of Railway Safety is informed about the movement. Formal approval is not required unless passenger trains are involved.

    Intermediate Block Hut/Section

    • Passing with IBS/IBH “ON”: If the IBS/IBH is "ON", the track machine stops. After 5 minutes, the SSE/JE/TM contacts the SM in the rear station, reporting the issue. If the SM approves, the track machine can proceed with a reduced speed (15 kmph if visibility is clear, 8 kmph if not).
    • Block Working: When the track machine is operating on a block, the IBH/IBS is treated as canceled, and the track machine can pass the IBS/IBH "ON".

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    Track Machine Manual PDF

    Description

    Explore the different categories of track machines, including locomotive-hauled and self-propelled types. This quiz will cover operational rules, safety protocols, and essential knowledge needed for staff training in track machine movement. Understand the importance of standardized guidelines across zonal railways.

    More Like This

    Track Machine Assistants Duties Quiz
    86 questions
    Ballast Cleaning Machines in Railways
    86 questions
    Railway Track Machine Planning Overview
    86 questions
    Periodic Overhauling of Track Machines
    86 questions
    Use Quizgecko on...
    Browser
    Browser