Questions and Answers

What is the primary responsibility regarding the supervision of track machines?

  • To ensure safe passage of traffic after clearing line blocks (correct)
  • To maintain detailed logs of all machine operations
  • To arrange for staff training on machinery
  • To liaise with local authorities for road closures
  • Which of the following is a duty of the SSE/JE/P.Way deployed with the machine?

  • To check track parameters and conditions during machine operation (correct)
  • To conduct traffic audits in the operating area
  • To directly operate the machinery during all tasks
  • To manage staffing for non-machine operations
  • What must be ensured for the machine staff's accommodations?

  • Provision of heating and internet facilities
  • Access to recreational areas for downtime
  • Close proximity to the nearest city center
  • Facility of water supply and power supply (correct)
  • What should be done in case of a machine breakdown during operation?

    <p>Immediately clear the block section once repairs cannot be completed</p> Signup and view all the answers

    What should be ensured for optimum utilization of machines?

    <p>Availability of consumables and spares</p> Signup and view all the answers

    What should be organized to minimize machine idle time?

    <p>Breakdown repairs</p> Signup and view all the answers

    How should the output and quality of work done by machines be monitored?

    <p>By conducting periodic inspections during operations</p> Signup and view all the answers

    Which arrangement is essential when night working of machines is involved?

    <p>Ensuring adequate lighting arrangements</p> Signup and view all the answers

    Who is responsible for supervising important schedules and major repairs?

    <p>The Assistant/Executive Engineer</p> Signup and view all the answers

    What needs to be verified by the field units annually?

    <p>Stores held by the units</p> Signup and view all the answers

    What is required before deploying a track machine according to IRTMM?

    <p>Collection of site details and computation of values</p> Signup and view all the answers

    Which of the following is NOT a responsibility of the Assistant/Executive Engineer?

    <p>Conducting safety audits for all machinery</p> Signup and view all the answers

    What should be monitored after machine operation before clearing the line block?

    <p>The condition of the track and presence of obstructions</p> Signup and view all the answers

    How should obsolete stores be handled?

    <p>Returned to zonal depot or disposed of</p> Signup and view all the answers

    What is a key role in staff matters for the Assistant/Executive Engineer?

    <p>Ensuring strict discipline and compliance with rules</p> Signup and view all the answers

    What should be ensured regarding personnel working under the Assistant/Executive Engineer?

    <p>They possess medical and competency certificates</p> Signup and view all the answers

    What is the main source of power in a tamping machine?

    <p>Diesel engine</p> Signup and view all the answers

    What form of power is provided by the hydraulic pump in a tamping machine?

    <p>Hydraulic power</p> Signup and view all the answers

    Which component in a tamping machine is responsible for converting mechanical energy into hydraulic power?

    <p>Hydraulic pump</p> Signup and view all the answers

    What type of power does the compressor in a tamping machine generate?

    <p>Pneumatic power</p> Signup and view all the answers

    Which of the following assemblies contributes to the movement of the tamping machine?

    <p>Rear bogie</p> Signup and view all the answers

    What is the role of the alternator in a tamping machine?

    <p>Provide electrical power</p> Signup and view all the answers

    Which power source is specifically used for the brake and locking mechanisms in a tamping machine?

    <p>Pneumatic power</p> Signup and view all the answers

    What type of energy conversion occurs in the diesel engine of the tamping machine?

    <p>Chemical to mechanical</p> Signup and view all the answers

    What is the primary responsibility of the machine-in-charge pertaining to maintenance?

    <p>Carrying out the prescribed schedule of maintenance and keeping proper records</p> Signup and view all the answers

    Which of the following actions is the machine-in-charge NOT responsible for?

    <p>Replacement of all faulty machinery components without tracking</p> Signup and view all the answers

    What must the machine-in-charge ensure regarding system functionality?

    <p>That the systems are kept in working condition and quality is maintained</p> Signup and view all the answers

    Who assists the machine-in-charge during the maintenance process?

    <p>All staff posted on the machine</p> Signup and view all the answers

    What is a key precautionary measure that must be taken during design mode operations?

    <p>Taking precautions for operations such as slewing and lifting</p> Signup and view all the answers

    What should the machine-in-charge do if machinery malfunctions or obstructions occur?

    <p>Seek assistance from MCMs, TMMs, and other assistants immediately</p> Signup and view all the answers

    What is the role of the machine-in-charge during the visit of the firm’s Service Engineer?

    <p>To actively participate and provide necessary information for examination</p> Signup and view all the answers

    What does the machine-in-charge need to communicate regularly?

    <p>Periodic reports and statements using the fastest mode of communication</p> Signup and view all the answers

    What is the minimum time that inspecting officials should arrive at the stabling siding before block time?

    <p>1 hour</p> Signup and view all the answers

    Which of the following is NOT part of the pre-block inspection items that should be checked?

    <p>Current weather conditions</p> Signup and view all the answers

    Who is responsible for inspecting the knowledge of safety rules among staff members?

    <p>SSE/JE/P.Way</p> Signup and view all the answers

    What must inspecting officials record during block working?

    <p>Results of their inspection</p> Signup and view all the answers

    What is one of the items that inspecting officials should verify regarding emergency preparedness?

    <p>Emergency backup system for clearing blocks</p> Signup and view all the answers

    What must be checked concerning safety items during the inspection?

    <p>Compliance with safety item expiry dates</p> Signup and view all the answers

    Which record should be available for examining the current state of machinery?

    <p>Records of machine failures</p> Signup and view all the answers

    What should inspecting officials ensure regarding staff members working in a block section?

    <p>Adequate safety against incoming trains</p> Signup and view all the answers

    What is one of the primary functions of the Tamping Mechanism?

    <p>Squeezing Pressure</p> Signup and view all the answers

    Which type of Ballast Cleaning Machine is specifically used for points and crossing?

    <p>Points and Crossing Ballast Cleaning Machine</p> Signup and view all the answers

    In the context of Tamping Machines, what is the purpose of the Lifting and Lining Unit?

    <p>To correct Track Geometry</p> Signup and view all the answers

    What advantage does the Dynamic Track Stabilizer (DTS) provide during track maintenance?

    <p>Provides stabilization during laying</p> Signup and view all the answers

    Which item is NOT typically a part of the Important Assemblies of Ballast Cleaning Machines?

    <p>Tamping Tool</p> Signup and view all the answers

    Which of the following is a key parameter of the Tamping process?

    <p>Tamping Depth</p> Signup and view all the answers

    What type of work is involved in the Pre-Tamping Works?

    <p>Preparatory Works</p> Signup and view all the answers

    Which item is NOT associated with Dynamic Track Stabilizers?

    <p>Lifting and Slewing Unit</p> Signup and view all the answers

    What is one of the main operations required after deploying the Ballast Cleaning Machines?

    <p>Disposal of Muck</p> Signup and view all the answers

    Which of the following roles is designated for assisting with track machines?

    <p>Master Crafts Man</p> Signup and view all the answers

    What is a unique feature of the 4 Point Lining Method?

    <p>Can adjust for curve alignment</p> Signup and view all the answers

    Which of these is considered an important assembly of Track Laying Equipment (TLE)?

    <p>Side Frames</p> Signup and view all the answers

    When leveling and lifting, what is the primary aim of 'General Lift'?

    <p>To decide the amount of track lift needed</p> Signup and view all the answers

    Study Notes

    Indian Railways Track Machine Manual

    • Second Edition published in September 2019
    • Published by the Government of India, Ministry of Railways (Railway Board)
    • The manual covers track machine working on Indian Railways, including tamping technology, organizational structure, and procedure for data entry in TMS.
    • Many new track machines were inducted in the 2000s, requiring updates to the manual.
    • Key topics include tamping technology, technical details of machines, maintenance infrastructure and organizational structure.
    • The manual was needed to better equip field staff.

    Foreword to Second Edition (2019)

    • Written by Vishwesh Chaube, Member Engineering, Railway Board
    • Chaube states the second edition includes all types of track machines used by Indian Railways.

    Foreword to First Edition (2000)

    • Written by V.K. Agnihotri, Member Engineering, Railway Board
    • Introduction of mechanized track laying and maintenance on Indian Railways to meet growing traffic
    • The first edition was prepared based on field experience
    • The manual was needed to centralize instructions

    Preface to Second Edition

    • The manual was published in 2000, to guide track machine and open line/ construction officials.
    • The manual is revised based on current developments, provisions and working rules.
    • Key committees and officials are mentioned
    • Reviewed using latest codes
    • Contains information on manual procedures.

    Preface to First Edition

    • Track machines were first introduced in the 1960s
    • Instructions were issued but not documented centrally.
    • A committee was formed to codify and document these instructions.
    • Committee members from various Indian Railways sections participated
    • Contents cover important aspects of track machine operation and maintenance.

    Studying That Suits You

    Use AI to generate personalized quizzes and flashcards to suit your learning preferences.

    Quiz Team

    Related Documents

    Description

    Test your knowledge on the supervision of track machines and the responsibilities of the staff involved. This quiz covers key duties related to machine deployment, maintenance, and effective operation practices. Ideal for those in railway engineering or maintenance roles.

    More Like This

    Railway Track Machine Planning Overview
    86 questions
    Track Machine Movement Overview
    83 questions

    Track Machine Movement Overview

    SolicitousOklahomaCity avatar
    SolicitousOklahomaCity
    Track Machine Staff Training Overview
    86 questions
    Track Machine Organization Overview
    86 questions
    Use Quizgecko on...
    Browser
    Browser