Spiral Model in Software Development
16 Questions
1 Views

Choose a study mode

Play Quiz
Study Flashcards
Spaced Repetition
Chat to Lesson

Podcast

Play an AI-generated podcast conversation about this lesson

Questions and Answers

In the Code and Fix Life Cycle Model, what is a major disadvantage as the code size increases?

  • Decreased understandability and maintainability (correct)
  • Streamlined development process
  • Enhanced scalability and flexibility
  • Improved efficiency and speed

What is a key characteristic of the Waterfall Model according to the text?

  • Iterative development process
  • Sequential completion of phases (correct)
  • Flexible and adaptable phases
  • Lack of review process

When is the Code and Fix Life Cycle Model recommended to be used?

  • For systems where specification or design issues need to be addressed
  • For large and complex requirements
  • For projects with iterative development needs
  • For very small and simple requirements (correct)

What is a primary advantage of the Waterfall Model highlighted in the text?

<p>Ease of managing due to its flexible nature (D)</p> Signup and view all the answers

What is a key advantage of the V-shaped model over the waterfall model?

<p>Development of test plans early in the life cycle (A)</p> Signup and view all the answers

Why is the V-shaped model considered very rigid?

<p>It has little flexibility and adjusting scope is difficult (D)</p> Signup and view all the answers

What is a disadvantage of the Planning Risk Analysis Project Cost Engineering Evaluation model?

<p>Can be a costly model to use (D)</p> Signup and view all the answers

In which phase of the V-shaped model are unit tests created?

<p>Low-level design phase (D)</p> Signup and view all the answers

In which scenario is the Prototyping Model recommended?

<p>For significant changes expected in a new product line (A)</p> Signup and view all the answers

What type of projects is the V-shaped model most suitable for?

<p>Small to medium-sized projects with fixed requirements (A)</p> Signup and view all the answers

What happens during the prototype phase of the Prototyping Model?

<p>Customer tests the prototype (A)</p> Signup and view all the answers

In what situation does the Planning Risk Analysis model not work well?

<p>Users are unsure of their needs (C)</p> Signup and view all the answers

What is the main difference between the spiral model and the incremental model?

<p>Emphasis on risk analysis in the spiral model (A)</p> Signup and view all the answers

Why is having options important in software development according to the text?

<p>To delay important decisions until more data is available (C)</p> Signup and view all the answers

What happens during the risk analysis phase in the spiral model?

<p>Identifying risks and proposing solutions (A)</p> Signup and view all the answers

In the spiral model, what does the angular component represent?

<p>Progress of the project (C)</p> Signup and view all the answers

More Like This

The Spiral Model in Software Development
10 questions
Spiral Model in Software Development
40 questions
The Spiral Model in Software Development
8 questions
Spiral Model in Software Development
40 questions
Use Quizgecko on...
Browser
Browser