What is the purpose of site selection before product installation?
What is the purpose of site selection before product installation?
Proper ventilation is crucial for DG sets.
Proper ventilation is crucial for DG sets.
True
The purpose of commissioning is to verify the __________ of the product.
The purpose of commissioning is to verify the __________ of the product.
functionality
Match the activities to be performed in site selection with their descriptions:
Match the activities to be performed in site selection with their descriptions:
Signup and view all the answers
What is the prime rating of the KG4-200WS model in KW?
What is the prime rating of the KG4-200WS model in KW?
Signup and view all the answers
Which genset models share the same frequency?
Which genset models share the same frequency?
Signup and view all the answers
What is the power factor for all three genset models?
What is the power factor for all three genset models?
Signup and view all the answers
What is the rated voltage for the genset models?
What is the rated voltage for the genset models?
Signup and view all the answers
Which governing class is used for all the genset models?
Which governing class is used for all the genset models?
Signup and view all the answers
What is the full load current in Amps for the KG4-160WS model?
What is the full load current in Amps for the KG4-160WS model?
Signup and view all the answers
What type of breaker is suggested for the KG4-125WS model?
What type of breaker is suggested for the KG4-125WS model?
Signup and view all the answers
Which statement about the noise level at 1 meter is true for the genset models?
Which statement about the noise level at 1 meter is true for the genset models?
Signup and view all the answers
What is the full load current for the KG4-200WS genset model?
What is the full load current for the KG4-200WS genset model?
Signup and view all the answers
Study Notes
Site Selection
- Site selection ensures the chosen location is suitable for the product's functionality, safety, and overall effectiveness.
- It involves assessing various factors, including:
- Ensuring best product performance
- Prioritizing safety and compliance
- Considering accessibility and logistics
- Evaluating environmental conditions
- Planning for scalability and future expansion
Location and Layout
- Ensures a clean site for genset commissioning
- Follows specific guidelines for placement
- Prioritizes ventilation, accessibility, and safety
- Considers isolation for specific environments (e.g., chemical factories, heavy dust areas, congested spaces)
- Adheres to structural considerations (for roof-top installations)
Ventilation
- Chooses a well-ventilated site
- Keeps the area obstacle-free
- Plans forced ventilation for rooms and basements
- Ensures temperature rise is within limits
- Good ventilation is crucial for DG set
- Poor ventilation can be uncomfortable
- Proper exhaust out design is necessary
- Follows emission regulations and environmental standards
Environmental Conditions
- Assesses impact on local plants and animals
- Minimizes generating set noise
- Plans for proper waste disposal
- Manages water usage and prevents pollution
- Mitigates visual impact on the landscape
- Follows local environmental regulations
- Uses eco-friendly materials and methods
Regulatory Compliance
- Follows local and national rules
- Gets necessary permits upfront
- Conducts environmental assessments as needed
- Sticks to zoning and land use laws
- Meets emission and safety standards
- Minimizes noise as per regulations
- Keeps good records and submits required documents
Safety & Security
- Inspects for hazards and plans safe routes
- Establishes emergency response procedures
- Provides safety training for personnel
- Secures against unauthorized access
- Enforces the use of protective equipment
- Secures the site perimeter and marks safety zones
- Prevents fires with measures and equipment
Commissioning
- Helps to verify the functionality of the product
- Helps to identify any transit damages
- Helps to train the user on operation and maintenance of the product
- Helps to understand the installation quality
- Helps to verify the installation parameters are followed as per the OEM recommendations
Roof-Top Installation
- Checks local rules, gets permits
- Verifies rooftop strength for genset
- Ensures strong mounts and usage of rubber pads for weight and vibrations
- Ensures stable foundation
- Ensures no hot air circulation
- Ensures a safe path for maintenance
- Tests vibrations for minimal impact
- Addresses environmental concerns
Space around the Genset
- Ensures proper distances from nearby structures or gensets
- Checks easy access to emergency controls
- Ensures safe distance from fuel storage
- Ensures space available for safe movement of personnel
- Ensures prevent water accumulation around the generator
External Fuel Tank and Its Piping
- Checks fuel piping and tank for damage or loose connections
- Confirms proper operation of valves
- Looks for contamination in the tank
- Confirms proper tank ventilation
Cooling System
- Checks radiator for damage or leaks
- Ensures the right amount of coolant
- Ensures correct usage of coolant mixture
- Makes sure the thermostat works
- Checks and adjusts belt tension
- Tests the cooling fan
Exhaust Piping
- Checks pipes for damage and leaks
- Ensures the exhaust system is securely installed
- Verifies bellows alignment and checks for damage
- Inspects insulation on Silencer and pipe
- Confirms Silencer positioning (horizontal or vertical)
- Checks "Y" pipe connection and support
- Verifies provision for emission measurement
After Treatment - DEF
- Checks EGR cooling pipes for cracks and clamps for looseness
- Inspects EGR valve connection for damage or looseness
- Checks SCR mounting plate and clamps for looseness
- Checks DOC mounting for looseness
- Inspects bellows for bends or stress
- Looks for leaks in DOC and exhaust manifold
- Ensures heat shield covers DOC out pipe
After Treatment - DOC
- Checks injector position and connection
- Inspects dozing module cooling pipe routing
- Ensures separate routing for cooling pipes and cables
- Confirms fitting of cooling pipe clamps
Electrical System
- Checks battery cables for cleanliness and correct connections
- Measures battery voltage and specific gravity during cranking
- Confirms proper sizing and separate routing of DC and communication wires
- Verifies tightness of all electrical connections
- Specifies battery details and notes bus duct presence
- Inspects electrodes for condition
- Confirms proper earthing conductor size
- Ensures required earthing points
- Inspects earth continuity conductor
Genset Foundation
- Checks soil strength and makes a larger foundation
- Keeps it elevated for cleanliness
- Ensures it's flat and level
- Lets the concrete cure
- Designs as per set's weight
- Gets approval for rooftops
- Uses rubber matting if needed
Genset Specifications Overview
- Genset models include KG4-125WS, KG4-160WS, and KG4-200WS.
- Each model has specific prime ratings measured in KVA and KW:
- KG4-125WS: 125 KVA, 100 KW
- KG4-160WS: 160 KVA, 128 KW
- KG4-200WS: 200 KVA, 160 KW
- All models operate at a frequency of 50 Hz.
Power Characteristics
- Power factor for all models is 0.8 lagging, indicating the phase difference between voltage and current.
- Each model is designed with three-phase (3P) connection.
Voltage and Current Ratings
- Standard rated voltage across all models is 415 volts.
- Full load current varies:
- KG4-125WS: 173.9 Amps
- KG4-160WS: 222.6 Amps
- KG4-200WS: 278.2 Amps
Circuit Breaker and Governing Class
- Circuit breakers differ by model:
- KG4-125WS requires a 3 Pole, 200A breaker.
- KG4-160WS requires a 3 Pole, 250A breaker.
- KG4-200WS requires a 3 Pole, 350A breaker.
- All models conform to Governing Class G3 as per ISO 8528 Part-V.
Noise Levels
- Noise level for each model is measured at 1 meter from the generator unit.
Studying That Suits You
Use AI to generate personalized quizzes and flashcards to suit your learning preferences.
Related Documents
Description
This quiz covers the process of selecting a suitable site for product installation and commissioning, considering factors such as functionality, safety, and effectiveness. It also involves engine or DG set commissioning, including setup, testing, and ensuring optimal operation.